Rdl Construction, Inc.
- Based in
- San Jose
- On San Francisco permits
- Aug 2019 to Aug 2026
- Last 24 months
- 12 permits filed
23 permits since 2000: 18 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 8 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2024 | Completed final sign-off Jul 2024 | 500 Montgomery St | bringing a partial height wall to full height up to deck to demise the mezzanine from ground fl tenant space. minimal restroom upgrade, patch & repair finishes. e) use of suite is design professional will remain the same. relocate partition @ groumd fl restroom x 2. no plumbing fixture increaseDetails
bringing a partial height wall to full height up to deck to demise the mezzanine from ground fl tenant space. minimal restroom upgrade, patch & repair finishes. e) use of suite is design professional will remain the same. relocate partition @ groumd fl restroom x 2. no plumbing fixture increase | $27,250 |