Aston Pereira
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Aston Pereira & Associates
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Sep 2022
63 permits since 2000 (architect on 59 permits, authorized agent-others on 3 permits, engineer on 1 permit): 52 completed, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2022 | Completed final sign-off Sep 2023 | 3630 Scott St | Imperial Construction Crc Inc. | 2/f: existing laundry room to be converted into full bath. existing half bath to be converted to a full bath. existing storage room expanded. kitchen remodel like for like.Details
2/f: existing laundry room to be converted into full bath. existing half bath to be converted to a full bath. existing storage room expanded. kitchen remodel like for like. | $12,000 |
| Apr 27, 2016 | Completed final sign-off Aug 2016 | 1 Daniel Burnham Ct | Derry Casey Builders | #300a - t.i.: reduce area of existing suite, remove existing lounge & millwork, enlarge (e) meeting room. mep modifications under seperate permit. n/a ordinance #155-13Details
#300a - t.i.: reduce area of existing suite, remove existing lounge & millwork, enlarge (e) meeting room. mep modifications under seperate permit. n/a ordinance #155-13 | $76,000 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 600 Montgomery St | Hathaway Dinwiddie Co. | 21st flr: revisions to ref pa 2016 0122 7709: document on plans the reqd 2 way communications system in the elevator lobby - tiDetails
21st flr: revisions to ref pa 2016 0122 7709: document on plans the reqd 2 way communications system in the elevator lobby - ti | |
| Mar 1, 2016 | Completed final sign-off Feb 2018 | 405 Howard St | Gci, Inc | 6th floor: tenant improvements to convert extg offices into meeting rooms. new carpet and paint. mechanical plan submitted under separate permit.Details
6th floor: tenant improvements to convert extg offices into meeting rooms. new carpet and paint. mechanical plan submitted under separate permit. | $67,000 |
| Jan 22, 2016 | Completed final sign-off Jun 2016 | 600 Montgomery St | Hathaway Dinwiddie Co. | tenant improvements new offices and support facilities. new stair to connect to the 20th fl. mep under separate permitDetails
tenant improvements new offices and support facilities. new stair to connect to the 20th fl. mep under separate permit | $685,000 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 600 Montgomery St | Hathaway Dinwiddie Co. | 21st floor - demolition only per ab-017: interior pratiitons, ceiling tile & grid, floor finishes, mechanical duckwork & vav boxes, electrical devices & piping. n/a maher ordinanceDetails
21st floor - demolition only per ab-017: interior pratiitons, ceiling tile & grid, floor finishes, mechanical duckwork & vav boxes, electrical devices & piping. n/a maher ordinance | $62,000 |
| Apr 27, 2015 | Completed final sign-off May 2015 | 611 Front St | P Power Construction | construct new elevator controller room, basement level. fire alarm and electrical work under sep permitDetails
construct new elevator controller room, basement level. fire alarm and electrical work under sep permit | $3,000 |
| Apr 15, 2015 | Completed final sign-off Apr 2015 | 650 California St | Hathaway Dinwiddie Co. | revision to previously approved t.i. pa# 201411040675 update title sheet and toilet room plans. n/a ordinance #155-13Details
revision to previously approved t.i. pa# 201411040675 update title sheet and toilet room plans. n/a ordinance #155-13 | |
| Apr 9, 2015 | Completed final sign-off Jul 2015 | 555 Post St | move interior tenant front door, move existing ramps and doors at basement. reconfiguration of rooms within,no external work,new framing for sturctural floors/walls- under separate permit.Details
move interior tenant front door, move existing ramps and doors at basement. reconfiguration of rooms within,no external work,new framing for sturctural floors/walls- under separate permit. | $50,000 | |
| Mar 11, 2015 | Completed final sign-off Mar 2016 | 360 Post St | Source Planning And Construction Inc | ti- minor demo of non load bearing interior partitions. expand interior opening office space. relocate break rm and storage space. mech/ele/plum - under seperate permitDetails
ti- minor demo of non load bearing interior partitions. expand interior opening office space. relocate break rm and storage space. mech/ele/plum - under seperate permit | $195,000 |
| Nov 4, 2014 | Completed final sign-off Apr 2015 | 650 California St | Hathaway Dinwiddie Co. | 26th flr tenant improvement, remodel existing library area and conference room, minor electrical work for lighting and power. electrical work under separate permit; maher n/aDetails
26th flr tenant improvement, remodel existing library area and conference room, minor electrical work for lighting and power. electrical work under separate permit; maher n/a | $78,000 |
| Jun 11, 2014 | Completed final sign-off Feb 2015 | 600 Montgomery St | t.i. on 20/f- new offices and support facilities, supplement existing mechanical mep systems, life safety and sprinkler work under seperate permit. n/a ordinance #155-13Details
t.i. on 20/f- new offices and support facilities, supplement existing mechanical mep systems, life safety and sprinkler work under seperate permit. n/a ordinance #155-13 | $980,000 | |
| Jun 4, 2014 | Completed final sign-off Jun 2014 | 190 The Embarcadero | Aquamatic Fire Protection | as builts (fire sprinklers) referencing to t.i. 201404012161Details
as builts (fire sprinklers) referencing to t.i. 201404012161 | $19,698 |
| Feb 26, 2014 | Completed final sign-off Jul 2014 | 190 The Embarcadero | Rossi Builders Inc. | 7th floor tenant improvements- new offices & support facilities supplemental mechanical, electrical & plumbing work to existing systems. sprinkler & life safety work under separate permit.Details
7th floor tenant improvements- new offices & support facilities supplemental mechanical, electrical & plumbing work to existing systems. sprinkler & life safety work under separate permit. | $925,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 580 Market St | Fnj Construction | ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor.Details
ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor. | $13,000 |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 2nd floor t.i. mechanical, electrical, plumbing work. bldg pa# 201310119095Details
2nd floor t.i. mechanical, electrical, plumbing work. bldg pa# 201310119095 | $42,000 |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 5th floor t.i. revision to pa #201310119095: vestibule deleted replaced with smoke fire door assembly at elevator opening.Details
5th floor t.i. revision to pa #201310119095: vestibule deleted replaced with smoke fire door assembly at elevator opening. | |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 5th floor t.i. mechanical, electrical, plumbing workDetails
5th floor t.i. mechanical, electrical, plumbing work | $42,000 |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 2nd floor t.i. revision to pa #201310119094: vestibule deleted replace w/smoke-fire door assembly at elevator opening.Details
2nd floor t.i. revision to pa #201310119094: vestibule deleted replace w/smoke-fire door assembly at elevator opening. | |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 260 California St | 11th floor: t.i. :minor demolition interior non load bearing partitions. new glass office partitions.Details
11th floor: t.i. :minor demolition interior non load bearing partitions. new glass office partitions. | $22,000 | |
| Nov 25, 2013 | Completed final sign-off Apr 2014 | 143 02nd St | P 3 Construction & Remodeling Inc | tenant improvements. interior drywall and glass partitions. millwork lighting and floor finishes. compliance with ordiance no. 155-13 not required.Details
tenant improvements. interior drywall and glass partitions. millwork lighting and floor finishes. compliance with ordiance no. 155-13 not required. | $62,000 |
| Sep 20, 2013 | Completed final sign-off Feb 2016 | 944 Market St | P 3 Construction & Remodeling Inc | demolition of interior non load bearing walls, new offices and support facilities. elec, life safety, plumbing, and sperinkler work sep permitDetails
demolition of interior non load bearing walls, new offices and support facilities. elec, life safety, plumbing, and sperinkler work sep permit | $279,000 |
| Mar 12, 2012 | Completed final sign-off Aug 2012 | 71 Stevenson St | Novo Construction Inc | t.i. new offices, open office workstations, meeting rooms, breakroom and storage. modify existing hvac electrical and elec system, life safety and sprinkler work under separate permit and mech.Details
t.i. new offices, open office workstations, meeting rooms, breakroom and storage. modify existing hvac electrical and elec system, life safety and sprinkler work under separate permit and mech. | $435,000 |
| Dec 9, 2011 | Completed final sign-off Jul 2012 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | tennant improvements. new interconnecting stair between the 31st and 32nd floor. 32nd floor. ref pa# 2011/12/02/0019.Details
tennant improvements. new interconnecting stair between the 31st and 32nd floor. 32nd floor. ref pa# 2011/12/02/0019. | $93,500 |
| Dec 2, 2011 | Completed final sign-off Jul 2012 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | tenant improvement for full floor buildout. new offices. upgrade existing mechanical, electrical systems. new interconnecting stair to 31st fl under separate permit. fire alarm and sprinkler under seperate permit.Details
tenant improvement for full floor buildout. new offices. upgrade existing mechanical, electrical systems. new interconnecting stair to 31st fl under separate permit. fire alarm and sprinkler under seperate permit. | $1,250,000 |
| Aug 26, 2011 | Completed final sign-off Aug 2012 | 4 Embarcadero Center | Source Planning And Construction Inc | tenant improvements- expanding offices to take entire floor build new offices and support facilities, modify existing mechanical system for new layout sprinkler and life safty under seperate permit.Details
tenant improvements- expanding offices to take entire floor build new offices and support facilities, modify existing mechanical system for new layout sprinkler and life safty under seperate permit. | $989,000 |
| Aug 12, 2011 | Completed final sign-off Jan 2012 | 222 Sutter St | Cannon Constructors North Inc | 6th floor tenant improvements - minor demolition , remove workstations & reception station, build new conference room & exit door.Details
6th floor tenant improvements - minor demolition , remove workstations & reception station, build new conference room & exit door. | $67,500 |
| Jun 29, 2011 | Completed final sign-off Dec 2012 | 71 Stevenson St | Novo Construction Inc | refer to pa# 2011-0527-6983-electrical & mechanical work for new tenant improvementDetails
refer to pa# 2011-0527-6983-electrical & mechanical work for new tenant improvement | $500,000 |
| May 27, 2011 | Completed final sign-off Dec 2011 | 71 Stevenson St | Novo Construction Inc | office ti on the 21st floor. new offices, coffe/break room, storage space and it wiring closet. modify (e) electrical and hvac for offices and open office layout. ref.pa# 2011.05.23.6591 for demo per ab17Details
office ti on the 21st floor. new offices, coffe/break room, storage space and it wiring closet. modify (e) electrical and hvac for offices and open office layout. ref.pa# 2011.05.23.6591 for demo per ab17 | $500,000 |
| May 27, 2011 | Completed final sign-off Oct 2011 | 225 Bush St | Cannon Constructors North Inc | office ti on the 4th fl. ste 400 - new floor to ceiling partition. upgrade (e) electrical and modify (e) mech for new lay outDetails
office ti on the 4th fl. ste 400 - new floor to ceiling partition. upgrade (e) electrical and modify (e) mech for new lay out | $12,500 |
| May 23, 2011 | Never finaled issued May 2011, no final | 71 Stevenson St | Novo Construction Inc | interior soft demo on the 21st floor per ab 17. remove (e) ceiling tile and ceiling grid.Details
interior soft demo on the 21st floor per ab 17. remove (e) ceiling tile and ceiling grid. | $22,000 |
| Jan 27, 2011 | Expired or cancelled cancelled Oct 2011 | 71 Stevenson St | Mc Millan Electric | 14th floor-install furniture workstations in empty suite. modify electrical outlets, relocate (e) light fixturesDetails
14th floor-install furniture workstations in empty suite. modify electrical outlets, relocate (e) light fixtures | $8,500 |
| Jan 20, 2011 | Completed final sign-off Feb 2011 | 150 California St | Mayta & Jensen | 18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans.Details
18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans. | |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 150 California St | Mayta & Jensen | 18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit.Details
18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit. | $18,000 |
| Aug 17, 2010 | Completed final sign-off Sep 2010 | 150 California St | Mayta & Jensen | modify (e) mechanical ductwork to srve 2 small offices. arch ti approved under pa# 2010.07.09.6306Details
modify (e) mechanical ductwork to srve 2 small offices. arch ti approved under pa# 2010.07.09.6306 | $2,300 |
| Oct 10, 2008 | Never finaled issued Oct 2008, no final | 717 Battery St | demolish all interior non load bearing partitions, ceilings, and floor finishesDetails
demolish all interior non load bearing partitions, ceilings, and floor finishes | $40,000 | |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | revision to 200807297841: remove 3 steps leading upg to the existing fire escapeDetails
revision to 200807297841: remove 3 steps leading upg to the existing fire escape | ||
| Jul 18, 2008 | Completed final sign-off Nov 2008 | 909 Montgomery St | ground floor-tenant improvements-minor demolition of (e) partitions, build new offices with storage space, coffee area and built in casework. electrical & plumbing work under seperate permitDetails
ground floor-tenant improvements-minor demolition of (e) partitions, build new offices with storage space, coffee area and built in casework. electrical & plumbing work under seperate permit | $85,000 | |
| Apr 23, 2008 | Completed final sign-off Oct 2008 | 153 Townsend St | 6th floor-tenant improvements-revision to approved plans, ref pa# 200804089118-meeting rooms to be used as offices. no life safety or mechanical work required.Details
6th floor-tenant improvements-revision to approved plans, ref pa# 200804089118-meeting rooms to be used as offices. no life safety or mechanical work required. | ||
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 111 Sutter St | Bcci Construction Company | 3rd floor: tenant improvements - build new equipment and wiring closet. add supplemental elec. and voice data foropen office workstations.Details
3rd floor: tenant improvements - build new equipment and wiring closet. add supplemental elec. and voice data foropen office workstations. | $22,000 |
| Jan 16, 2008 | Completed final sign-off Apr 2008 | 55 Francisco St | 5th floor - remove 1-existing door frame & wing walls in the multi-tenant corridor. no increase in office space.Details
5th floor - remove 1-existing door frame & wing walls in the multi-tenant corridor. no increase in office space. | $1,200 | |
| Nov 29, 2007 | Never finaled issued Jan 2008, no final | 135 Main St | revision to appl #200605080979: change occupancy in the building entry lobby to a-3 to allow special use assembly.Details
revision to appl #200605080979: change occupancy in the building entry lobby to a-3 to allow special use assembly. | ||
| Oct 9, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | 2nd floor - revise app.# 200702023234 new idf to be 1-hr rated for new equipment provide rated walls, door assembly and ceiling.Details
2nd floor - revise app.# 200702023234 new idf to be 1-hr rated for new equipment provide rated walls, door assembly and ceiling. | ||
| Jul 16, 2007 | Completed final sign-off Sep 2007 | 4 Embarcadero Center | 18th floor,rev. to p/a#200701030857,on ada hardship with equivalent facilitation.Details
18th floor,rev. to p/a#200701030857,on ada hardship with equivalent facilitation. | ||
| Jun 20, 2007 | Completed final sign-off Sep 2007 | 2106 Chestnut St | remove non load bearing partitons, interior, remove exuting casework, remove existing ceilingDetails
remove non load bearing partitons, interior, remove exuting casework, remove existing ceiling | $3,000 | |
| Jun 11, 2007 | Completed final sign-off Jan 2009 | 71 Stevenson St | oti-2, bare escentuals, 18th fl, el, me.Details
oti-2, bare escentuals, 18th fl, el, me. | $85,000 | |
| May 15, 2007 | Completed final sign-off May 2008 | 1188 Franklin St | oti-1, leonard carder, 2nd fl, el, me.Details
oti-1, leonard carder, 2nd fl, el, me. | $160,000 | |
| Apr 6, 2007 | Completed final sign-off Feb 2008 | 71 Stevenson St | oti-1, 17th floor, el, ls, spDetails
oti-1, 17th floor, el, ls, sp | $390,000 | |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 160 Spear St | Richlen Construction | legacy partners: oti-2 2nd floor el, me.Details
legacy partners: oti-2 2nd floor el, me. | $45,000 |
| Mar 8, 2007 | Completed final sign-off May 2007 | 160 Spear St | Richlen Construction | legacy partners: oti-2 9th floor el.Details
legacy partners: oti-2 9th floor el. | $13,595 |
| Jan 25, 2007 | Completed final sign-off Nov 2007 | 945 Front St | remove existing security fence and gate, install new glass and aluminum store front system, install new windows on 2/f to replace existing.Details
remove existing security fence and gate, install new glass and aluminum store front system, install new windows on 2/f to replace existing. | $60,000 | |
| Jan 11, 2007 | Completed final sign-off Mar 2008 | 909 Montgomery St | Ward Alan Emery Construction Inc. | provide 2 new heat pumps. relocate 2 heat pumps. replace 6 existing heat pumps. miscellaneous ducting for th enew heat pump configuration. 8 new hp total. mechanical work only. ref to appl #200612220485 city approved permit. 1 new fire demper (fsd).Details
provide 2 new heat pumps. relocate 2 heat pumps. replace 6 existing heat pumps. miscellaneous ducting for th enew heat pump configuration. 8 new hp total. mechanical work only. ref to appl #200612220485 city approved permit. 1 new fire demper (fsd). | $30,000 |
| Dec 19, 2006 | Expired or cancelled expired Apr 2009 | 909 Montgomery St | Ward Alan Emery Construction Inc. | interior demolition of drywall partitions, acoustic ceiling, doors and finishes. no structural demo. comply with ab-017, life safety to remain operational.Details
interior demolition of drywall partitions, acoustic ceiling, doors and finishes. no structural demo. comply with ab-017, life safety to remain operational. | $9,400 |
| Sep 13, 2006 | Completed final sign-off Nov 2006 | 343 Sansome St | Richlen Construction | life safety on 12th floorDetails
life safety on 12th floor | $45,000 |
| Oct 12, 2005 | Completed final sign-off May 2006 | 731 Market St | oti-1 2/f el, meDetails
oti-1 2/f el, me | $102,000 | |
| Sep 22, 2005 | Completed final sign-off Oct 2005 | 55 Francisco St | Cannon Constructors North Inc | renew expired permit for final inspection. pa# 2003/03/10/9196 & pa# 2002/12/13/3489.Details
renew expired permit for final inspection. pa# 2003/03/10/9196 & pa# 2002/12/13/3489. | |
| Jul 5, 2005 | Never finaled issued Jul 2005, no final | 909 Montgomery St | Cannon Constructors North Inc | close the existing hole with composite slab to match existing no increase in office spaceDetails
close the existing hole with composite slab to match existing no increase in office space | $22,500 |
| May 23, 2005 | Completed final sign-off Jun 2005 | 55 Francisco St | Cannon Constructors North Inc | oti-2 3rd fl l/sDetails
oti-2 3rd fl l/s | $9,800 |
| May 10, 2005 | Completed final sign-off Feb 2006 | 71 Stevenson St | oti-2 22nd floor el, me, l/s, spDetails
oti-2 22nd floor el, me, l/s, sp | $105,000 | |
| Feb 3, 2005 | Expired or cancelled expired Sep 2006 | 909 Montgomery St | repari fire damage-no chg fr orig conditions repair or replace.fireproofing,mech.ductwork&equip.....Details
repari fire damage-no chg fr orig conditions repair or replace.fireproofing,mech.ductwork&equip..... | $145,000 | |
| Aug 27, 2001 | Completed final sign-off Dec 2001 | 101 California St | oti-1 (11th fl only) l/s onlyDetails
oti-1 (11th fl only) l/s only | $38,000 | |
| Aug 20, 2001 | Completed final sign-off Mar 2002 | 4 Embarcadero Center | tenant improvements-mechanical only & elec lighting, all other wrk undr sep permit 200106131518Details
tenant improvements-mechanical only & elec lighting, all other wrk undr sep permit 200106131518 | $80,000 | |
| Apr 23, 2001 | Expired or cancelled expired Jun 2003 | 111 Sutter St | oti-1 6th flr el, me, l/s & spDetails
oti-1 6th flr el, me, l/s & sp | $225,000 |