Block 0714, lot 017
1188 Franklin St
- City’s use
- Commercial Office
- Built
- 1973
- Stories
- 4
- Rooms
- 7 bathrooms
- Building
- 40,470 sq ft
- Lot
- 18,000 sq ft
- Zoning
- NC3
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | to obtain final inspection for work approved under pa#: 202409050136. all work is completeDetails
to obtain final inspection for work approved under pa#: 202409050136. all work is complete | |
| Dec 4, 2025 | Completed final sign-off Jun 2026 | 1188 Franklin St | Apex Site Solutions Inc | recommencement and completion of work approved under pa#202007230746Details
recommencement and completion of work approved under pa#202007230746 | $30,000 |
| Feb 13, 2025 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | suite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button.Details
suite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button. | |
| Nov 18, 2024 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit.Details
suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit. | $320,000 |
| Sep 5, 2024 | Expired or cancelled expired Jul 2026 | 1188 Franklin St | Novo Construction Inc | 2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signsDetails
2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signs | $98,000 |
| Jan 20, 2023 | Completed final sign-off May 2023 | 1188 Franklin St | Dave's Lock Service, Terocons Inc | comply with abe program per ord 51-16. barrier removeal at e exterior ramp and primary entry. technical infeasibility and equiv facilitation per ord 51-16. no structural work. no sidewalk work, no mep. abe 201911228634. (all exterior work to be done b a-contractor; door operator by c-28 contractor).Details
comply with abe program per ord 51-16. barrier removeal at e exterior ramp and primary entry. technical infeasibility and equiv facilitation per ord 51-16. no structural work. no sidewalk work, no mep. abe 201911228634. (all exterior work to be done b a-contractor; door operator by c-28 contractor). | $25,000 |
| Feb 24, 2022 | Completed final sign-off Jun 2022 | 1188 Franklin St | Ericsson Inc Dba E U S Inc | at&t: remove and replace 6 antennas. remove 6 rrus, relocate 3 rrus. install 3 new dc9 boxes, (3) 6awg dc power trunks to new dc9's. install 1 new stackable battery enclosure w/ 8 new 190ah batteries within. 4 new rectifiers in (e) dcpp. remove (12) 155ah, 2 duw and (1) 5216. install 3 support beamsDetails
at&t: remove and replace 6 antennas. remove 6 rrus, relocate 3 rrus. install 3 new dc9 boxes, (3) 6awg dc power trunks to new dc9's. install 1 new stackable battery enclosure w/ 8 new 190ah batteries within. 4 new rectifiers in (e) dcpp. remove (12) 155ah, 2 duw and (1) 5216. install 3 support beams | $55,000 |
| Jul 23, 2020 | Never finaled issued Jan 2021, no final | 1188 Franklin St | Ericsson Inc Dba E U S Inc | removal & upgrade of panel antennas, rrus, battery strings as well as other upgrades at equipment level/in cabinet.Details
removal & upgrade of panel antennas, rrus, battery strings as well as other upgrades at equipment level/in cabinet. | $30,000 |
| Feb 27, 2020 | Expired or cancelled cancelled Jan 2026 | 1188 Franklin St | to comply w/abe program per ord 51-16 barrier removal @ existing exterior ramp & primary entry. technical infeasibility & equivalent facilitation per ord 51-16. no structural work. no mep work, no sidewalk workDetails
to comply w/abe program per ord 51-16 barrier removal @ existing exterior ramp & primary entry. technical infeasibility & equivalent facilitation per ord 51-16. no structural work. no mep work, no sidewalk work | $25,000 | |
| Apr 14, 2017 | Completed final sign-off Aug 2017 | 1188 Franklin St | Electric Tech Construction Inc | att modification: r&r 6(e) antennas, w/6 new antennas,9(e) rrus w/6 new rrus; install 2 new xmu, 2 new fiber, remove unused equip. paint antennad to matchDetails
att modification: r&r 6(e) antennas, w/6 new antennas,9(e) rrus w/6 new rrus; install 2 new xmu, 2 new fiber, remove unused equip. paint antennad to match | $33,000 |
| Nov 16, 2015 | Completed final sign-off May 2016 | 1188 Franklin St | Electric Tech Construction Inc | at&t modification to (e) telecom facility: install 3(n)rrus-32; install 3(n)dcg surge suppressors;(n)inner duct,(n)dc12 surge suppressor &hoffman box,(n)6601 v2 chassis w/(n)dus41;r&r 3 antennas w/(3)(n)antennas;relocate rrus,remove dcg surge from (e)rba72.Details
at&t modification to (e) telecom facility: install 3(n)rrus-32; install 3(n)dcg surge suppressors;(n)inner duct,(n)dc12 surge suppressor &hoffman box,(n)6601 v2 chassis w/(n)dus41;r&r 3 antennas w/(3)(n)antennas;relocate rrus,remove dcg surge from (e)rba72. | $22,000 |
| May 9, 2014 | Expired or cancelled withdrawn Aug 2014 | 1188 Franklin St | modifcation to e att telecommunication facility consisting of removing and replaceing 3 e att antennas with 3 new att antennas and adding 3 new rrus. 11 units with 3 new a2 modules, new dus 41 inside an e purcell cabinetDetails
modifcation to e att telecommunication facility consisting of removing and replaceing 3 e att antennas with 3 new att antennas and adding 3 new rrus. 11 units with 3 new a2 modules, new dus 41 inside an e purcell cabinet | $11,200 | |
| Mar 18, 2014 | Completed final sign-off Jul 2014 | 1188 Franklin St | Western Roofing Service | reroofingDetails
reroofing | $140,000 |
| Dec 18, 2013 | Completed final sign-off Nov 2014 | 1188 Franklin St | Roebuck Construction | t.i. of 2nd floor unoccupied offices and reconfiguration of the common corridor to connect this space to an occupied suite. plumbing & electrical under separate permit.Details
t.i. of 2nd floor unoccupied offices and reconfiguration of the common corridor to connect this space to an occupied suite. plumbing & electrical under separate permit. | $124,000 |
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 1188 Franklin St | street space permit.Details
street space permit. | ||
| Mar 19, 2012 | Completed final sign-off Feb 2013 | 1188 Franklin St | Terralink Communications Inc. | (n) unmanned telecom facility consisting of(n)8'-9"x 27'-8" at&t equip platform w/2(n)2206 rbs cabinets. 6 (n) 6601 umts rbs equipment units, (n) 6601 lte rbs equipment unit, & (n) dc power plant inside (n) sunwest cabinet, (n) telco parcell cabinet, (n) ciena unitDetails
(n) unmanned telecom facility consisting of(n)8'-9"x 27'-8" at&t equip platform w/2(n)2206 rbs cabinets. 6 (n) 6601 umts rbs equipment units, (n) 6601 lte rbs equipment unit, & (n) dc power plant inside (n) sunwest cabinet, (n) telco parcell cabinet, (n) ciena unit | $115,000 |
| May 15, 2007 | Completed final sign-off May 2008 | 1188 Franklin St | oti-1, leonard carder, 2nd fl, el, me.Details
oti-1, leonard carder, 2nd fl, el, me. | $160,000 | |
| Feb 9, 2004 | Completed final sign-off Dec 2004 | 1188 Franklin St | City Building Inc. | demo of metal stud wall and dry walls, adding elevator smoke doorsDetails
demo of metal stud wall and dry walls, adding elevator smoke doors | $350,000 |
| Dec 5, 2003 | Completed final sign-off Aug 2004 | 1188 Franklin St | City Building Inc. | renew:200205086063 ready for final inspectionDetails
renew:200205086063 ready for final inspection | |
| Jun 11, 2003 | Completed final sign-off Jul 2003 | 1188 Franklin St | Roebuck Construction | voluntary handicap ugrade of the existing unisex restroom on 4th floorDetails
voluntary handicap ugrade of the existing unisex restroom on 4th floor | $16,500 |
| May 8, 2002 | Expired or cancelled expired Aug 2004 | 1188 Franklin St | City Building Inc. | install new metal stud and drywall paritions w/new electrical ,new kitchen w/appliances/cabinets,paiDetails
install new metal stud and drywall paritions w/new electrical ,new kitchen w/appliances/cabinets,pai | $94,000 |
| Feb 28, 2002 | Expired or cancelled cancelled Jun 2003 | 1188 Franklin St | City Building Inc. | tenant improvement to include studwall framing /dryrot/plmg/millwork paint and carpetDetails
tenant improvement to include studwall framing /dryrot/plmg/millwork paint and carpet | $480,000 |
| Jan 24, 2002 | Completed final sign-off Mar 2002 | 1188 Franklin St | City Building Inc. | demo of metal stud & drywall walls, floor finishesDetails
demo of metal stud & drywall walls, floor finishes | $9,200 |
| Aug 1, 2000 | Completed final sign-off Dec 2000 | 1188 Franklin St | change work description from lobby revision to grouond floor hallway revisionsDetails
change work description from lobby revision to grouond floor hallway revisions | ||
| Jun 14, 2000 | Expired or cancelled expired Jul 2001 | 1188 Franklin St | lobby revisionsDetails
lobby revisions | $75,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.