Block 0291, lot 005B
580 Market St
- City’s use
- Commercial Office
- Built
- 1923
- Stories
- 6
- Units
- 4
- Rooms
- 12 bathrooms
- Building
- 35,162 sq ft
- Lot
- 4,678 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2019 | Completed final sign-off Aug 2019 | 580 Market St | Faith N Jason Construction Llc | renew for final 20140116231. all work completeDetails
renew for final 20140116231. all work complete | |
| Feb 15, 2018 | Expired or cancelled cancelled Jan 2020 | 578 Market St | install electric, double-faced, existing soffit, indirect, new sign. intallation of (n) exterior blade sign on (e) exterior soffit. signage permit shall be associated w/ planning dept case #2018001959ptaDetails
install electric, double-faced, existing soffit, indirect, new sign. intallation of (n) exterior blade sign on (e) exterior soffit. signage permit shall be associated w/ planning dept case #2018001959pta | $1,228 | |
| Feb 15, 2018 | Expired or cancelled cancelled Jan 2020 | 578 Market St | install electric, single-faced (e) soffit, indirect, new sign. installation of (n) exterior signage & sign on (e) exterior soffit. signage permit shall be associated w/ planning dept case #2018001959pta.Details
install electric, single-faced (e) soffit, indirect, new sign. installation of (n) exterior signage & sign on (e) exterior soffit. signage permit shall be associated w/ planning dept case #2018001959pta. | $1,228 | |
| Feb 2, 2018 | Expired or cancelled cancelled Jan 2020 | 578 Market St | exterior alteration of (e) ground floor tenant space for (e) coffee cafe. scope of work to include removal of (e) storefront, replacement w/ (n) storefront & installation of (n) exterior signage & (n) exterior blade sign on (e) exterior soffit.Details
exterior alteration of (e) ground floor tenant space for (e) coffee cafe. scope of work to include removal of (e) storefront, replacement w/ (n) storefront & installation of (n) exterior signage & (n) exterior blade sign on (e) exterior soffit. | $10,000 | |
| Jan 19, 2018 | Never finaled issued Jan 2018, no final | 578 Market St | Bryan J. Valverde Co | standard maintenance-repainting storefront-identical color-black; approval for temporary store signage-must be removed by 7/19/18;Details
standard maintenance-repainting storefront-identical color-black; approval for temporary store signage-must be removed by 7/19/18; | $2,250 |
| Dec 19, 2017 | Never finaled issued Dec 2017, no final | 578 Market St | Bryan J. Valverde Co | 1st floor - repair of front storefront glazing with in-kind clear glass. ordinary maintenance and repair does not require minor pta. no changes to exterior.Details
1st floor - repair of front storefront glazing with in-kind clear glass. ordinary maintenance and repair does not require minor pta. no changes to exterior. | $5,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 578 Market St | Bryan J. Valverde Co | g/f -t.i. of an existing floor tenant space for new cafe. to include new robotic cafe new order area, new prep room and equipment.Details
g/f -t.i. of an existing floor tenant space for new cafe. to include new robotic cafe new order area, new prep room and equipment. | $20,000 |
| Apr 6, 2017 | Completed final sign-off Jan 2018 | 580 Market St | Constructive Solutions Inc. | replacement of extg switch gear board with new. new concrete pad for new switch gear board. new wall and door for utility room. utility relocation/modification for new switch gear.Details
replacement of extg switch gear board with new. new concrete pad for new switch gear board. new wall and door for utility room. utility relocation/modification for new switch gear. | $75,000 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 580 Market St | San Francisco Fire Protection | 6th floor: due to the interior remodeling for new tenant, new notification appliances and pull staitons will be install thru-out for complete coverage. new initiating devices will be tie-in to extg control unit. notification applinaces will be tie in to extg power supply. t.i. 201509156945.Details
6th floor: due to the interior remodeling for new tenant, new notification appliances and pull staitons will be install thru-out for complete coverage. new initiating devices will be tie-in to extg control unit. notification applinaces will be tie in to extg power supply. t.i. 201509156945. | $4,500 |
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 580 Market St | Constructive Solutions Inc. | demo interior walls, restroom, breakroom, t-bar ceiling and finishes. build 4 new offices, ada restrooms, breakroom and finishesDetails
demo interior walls, restroom, breakroom, t-bar ceiling and finishes. build 4 new offices, ada restrooms, breakroom and finishes | $150,000 |
| May 13, 2015 | Completed final sign-off Jul 2015 | 580 Market St | Precision Design & Drafting Inc | remove towerstream equipDetails
remove towerstream equip | $500 |
| Mar 28, 2014 | Completed final sign-off Mar 2015 | 580 Market St | San Francisco Fire Protection | like for like voluntary system replacement. replace existing unit with new control panel at the same location. replace existing smokes and pull stations with new at the same location. tie in existing notification appliances, waterflow and tamper switches to new panel for monitoring. elev. recallDetails
like for like voluntary system replacement. replace existing unit with new control panel at the same location. replace existing smokes and pull stations with new at the same location. tie in existing notification appliances, waterflow and tamper switches to new panel for monitoring. elev. recall | $5,600 |
| Mar 7, 2014 | Never finaled issued Mar 2014, no final | 580 Market St | H C I Systems Inc | add new fire alarm devices to existing fire alarm system in the new 2nd and 5th fl ti space. 1 new bps, 6 horn strobes, 8 strobes, 2 door holders, 4 pull stations. ref 201310119094, 201310119095, 201312245002, 201312245003.Details
add new fire alarm devices to existing fire alarm system in the new 2nd and 5th fl ti space. 1 new bps, 6 horn strobes, 8 strobes, 2 door holders, 4 pull stations. ref 201310119094, 201310119095, 201312245002, 201312245003. | $6,800 |
| Feb 24, 2014 | Completed final sign-off Aug 2015 | 576 Market St | Golden Gate Sign Company Inc. | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $5,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 580 Market St | Fnj Construction | ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor.Details
ground floor lobby - light demo to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor. | $13,000 |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 5th floor t.i. mechanical, electrical, plumbing workDetails
5th floor t.i. mechanical, electrical, plumbing work | $42,000 |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 5th floor t.i. revision to pa #201310119095: vestibule deleted replaced with smoke fire door assembly at elevator opening.Details
5th floor t.i. revision to pa #201310119095: vestibule deleted replaced with smoke fire door assembly at elevator opening. | |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 2nd floor t.i. revision to pa #201310119094: vestibule deleted replace w/smoke-fire door assembly at elevator opening.Details
2nd floor t.i. revision to pa #201310119094: vestibule deleted replace w/smoke-fire door assembly at elevator opening. | |
| Dec 24, 2013 | Completed final sign-off Mar 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 2nd floor t.i. mechanical, electrical, plumbing work. bldg pa# 201310119095Details
2nd floor t.i. mechanical, electrical, plumbing work. bldg pa# 201310119095 | $42,000 |
| Oct 11, 2013 | Completed final sign-off Apr 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 2nd floor:t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permitDetails
2nd floor:t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permit | $195,000 |
| Oct 11, 2013 | Completed final sign-off Apr 2014 | 580 Market St | P 3 Construction & Remodeling Inc | 5th floor:t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permitDetails
5th floor:t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permit | $230,000 |
| Sep 20, 2013 | Completed final sign-off Jun 2014 | 580 Market St | P 3 Construction & Remodeling Inc | soft demo. remove interior non load bearing partitons, suspended ceiling and flooring per ab-017Details
soft demo. remove interior non load bearing partitons, suspended ceiling and flooring per ab-017 | $12,500 |
| Sep 20, 2013 | Completed final sign-off Jun 2014 | 580 Market St | P 3 Construction & Remodeling Inc | soft demo. remove interior non load bearing partitons, suspended ceiling and flooringDetails
soft demo. remove interior non load bearing partitons, suspended ceiling and flooring | $15,500 |
| Apr 26, 2013 | Expired or cancelled cancelled Nov 2024 | 580 Market St | installation of 3 towerstream wifi antennas on rooftop & one equipment cabinet (29.2 x 26.4 x 8.5") on interior stairwell wall & associated cables. drawings to follow (approved by ed sweeney)Details
installation of 3 towerstream wifi antennas on rooftop & one equipment cabinet (29.2 x 26.4 x 8.5") on interior stairwell wall & associated cables. drawings to follow (approved by ed sweeney) | $5,000 | |
| Sep 19, 2012 | Completed final sign-off Nov 2012 | 580 Market St | California Platinum Properties Inc | relocate restroom, revision to existing pa# 201208137207Details
relocate restroom, revision to existing pa# 201208137207 | |
| Aug 13, 2012 | Completed final sign-off Nov 2012 | 580 Market St | California Platinum Properties Inc | remove existing kitchen equipment. install new uni-sex accessible restroom. front door with automatic opening device at interior side. install new lighting, install new shelving and wood paneling at walls. relocate existing ductwork in new soffits.Details
remove existing kitchen equipment. install new uni-sex accessible restroom. front door with automatic opening device at interior side. install new lighting, install new shelving and wood paneling at walls. relocate existing ductwork in new soffits. | $50,500 |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 580 Market St | Ward Alan Emery Construction Inc. | revision to app #200604209506/add electric door operator to entry door installed under pa #200604209506 to meet t-24 hc per ab-012. extg slope at sidewalk is + or - 2.5%Details
revision to app #200604209506/add electric door operator to entry door installed under pa #200604209506 to meet t-24 hc per ab-012. extg slope at sidewalk is + or - 2.5% | $6,500 |
| Oct 16, 2006 | Never finaled issued Oct 2006, no final | 580 Market St | street space permitDetails
street space permit | ||
| May 15, 2006 | Completed final sign-off Nov 2006 | 580 Market St | Ward Alan Emery Construction Inc. | interior soft demo of interior finishes. comply with ab 017 demo only (soft)Details
interior soft demo of interior finishes. comply with ab 017 demo only (soft) | $6,000 |
| Apr 27, 2006 | Completed final sign-off Nov 2006 | 580 Market St | Ward Alan Emery Construction Inc. | electrical only in lobby. architectural on separate permit.Details
electrical only in lobby. architectural on separate permit. | $17,800 |
| Apr 20, 2006 | Completed final sign-off Dec 2006 | 580 Market St | Ward Alan Emery Construction Inc. | interior demolition, relocate entyry doors, finishesDetails
interior demolition, relocate entyry doors, finishes | $84,000 |
| Jan 29, 2004 | Completed final sign-off Jun 2004 | 578 Market St | application is for installation of new duct from type 2 hood to extrior and including the conveyorDetails
application is for installation of new duct from type 2 hood to extrior and including the conveyor | $2,500 | |
| Jan 27, 2004 | Completed final sign-off Jun 2004 | 578 Market St | power door operator revise entry per ab 012 & unreasonable slope. revise value of project $85,935.Details
power door operator revise entry per ab 012 & unreasonable slope. revise value of project $85,935. | $4,000 | |
| Oct 31, 2003 | Never finaled issued Oct 2003, no final | 578 Market St | rev. to pa#20033/10/06/6623 for t/i. tjhis applic. is for installation of (n) ductDetails
rev. to pa#20033/10/06/6623 for t/i. tjhis applic. is for installation of (n) duct | $2,500 | |
| Oct 6, 2003 | Completed final sign-off Jun 2004 | 578 Market St | t.i for fast food restaurant. work includes (n) fixtures. equipment finishes (n) lighting & ductworkDetails
t.i for fast food restaurant. work includes (n) fixtures. equipment finishes (n) lighting & ductwork | $120,000 | |
| Oct 11, 2002 | Completed final sign-off Oct 2003 | 576 Market St | Hardcastle Const. Inc | c.t.i. remove fixtures, shelving. new const. of the storefront, finishes, fixtures, int. partition,Details
c.t.i. remove fixtures, shelving. new const. of the storefront, finishes, fixtures, int. partition, | $60,000 |
| Dec 15, 2000 | Expired or cancelled expired Apr 2001 | 580 Market St | Pacific Auxiliary Fire Alarm | renew application 9915324:eliminate one smoke detector, add one smoke detector close door holderDetails
renew application 9915324:eliminate one smoke detector, add one smoke detector close door holder | |
| May 1, 2000 | Expired or cancelled expired Dec 2000 | 576 Market St | Canam Contracting Inc | replace cash counters w/.d.a. compliable countersDetails
replace cash counters w/.d.a. compliable counters | $1,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.