Russell Fudge
- Listed as
- engineer
- Firm
- Gfds Engineers
- On San Francisco permits
- Jun 2005 to Mar 2022
11 permits since 2000 (engineer on 11 permits): 10 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2022 | Never finaled issued Mar 2022, no final | 1750 Taylor St | Black Mountain Development | structural submittal for bpa 202110070028. expansion of (e) guard stations.Details
structural submittal for bpa 202110070028. expansion of (e) guard stations. | |
| Jun 11, 2014 | Completed final sign-off Feb 2015 | 600 Montgomery St | t.i. on 20/f- new offices and support facilities, supplement existing mechanical mep systems, life safety and sprinkler work under seperate permit. n/a ordinance #155-13Details
t.i. on 20/f- new offices and support facilities, supplement existing mechanical mep systems, life safety and sprinkler work under seperate permit. n/a ordinance #155-13 | $980,000 | |
| Nov 25, 2013 | Completed final sign-off May 2015 | 65 Post St | structural infill of opening at first floor (street level). sprinklers requested for new ceiling.Details
structural infill of opening at first floor (street level). sprinklers requested for new ceiling. | $25,000 | |
| Oct 23, 2012 | Completed final sign-off Jan 2013 | 420 El Camino Del Mar | V And Company, Incorporated | repair damaged plates under columns. voluntary seismic upgrade, add diagonol bracingDetails
repair damaged plates under columns. voluntary seismic upgrade, add diagonol bracing | $32,000 |
| Apr 27, 2012 | Completed final sign-off Apr 2013 | 799 Van Ness Av | Centric Building Inc. | voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permitDetails
voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permit | $650,000 |
| Jul 21, 2011 | Completed final sign-off Jan 2012 | 220 Montgomery St | Plant Construction Company Lp | investigation & repairs to 6 steel column bases at the basement level due to corrosionDetails
investigation & repairs to 6 steel column bases at the basement level due to corrosion | $25,000 |
| Jul 15, 2011 | Completed final sign-off Jun 2012 | 60 Normandie Tr | Matarozzi/Pelsinger Builders Inc. | remodel existing habitable basement and patio, add 1/2 bath and bar. remodel 1st floor corridor and stair. eliminate bathroom. remodel master bedroom suite, eliminate bath and add powder room. removel master bath. add island with prep sink in kitchen.Details
remodel existing habitable basement and patio, add 1/2 bath and bar. remodel 1st floor corridor and stair. eliminate bathroom. remodel master bedroom suite, eliminate bath and add powder room. removel master bath. add island with prep sink in kitchen. | $375,000 |
| Jul 24, 2008 | Completed final sign-off Jan 2009 | 4 Embarcadero Center | demo of (e) improvements including nonstruct. partitions & portion of floor slab for new convenience stair between 15th and 16th fl. n stair structur, non struct parttions, doors, glazing, ceiling, and finishes. no change in occupancy or use. restrm remodel. elect,sp and fa on separate permitDetails
demo of (e) improvements including nonstruct. partitions & portion of floor slab for new convenience stair between 15th and 16th fl. n stair structur, non struct parttions, doors, glazing, ceiling, and finishes. no change in occupancy or use. restrm remodel. elect,sp and fa on separate permit | $200,000 | |
| Jun 4, 2008 | Completed final sign-off Oct 2009 | 345 Sutter St | removal of e abandonded penthouse and interior wall of existing unoccupied building. new roof hatch, ladder, and stud furring. remove kitchen in basement. vacant space per ab-017Details
removal of e abandonded penthouse and interior wall of existing unoccupied building. new roof hatch, ladder, and stud furring. remove kitchen in basement. vacant space per ab-017 | $150,000 | |
| Apr 18, 2006 | Completed final sign-off Jan 2007 | 2351 Powell St | rev. to apprvd. pa#2004/11/30/0290 - provide structural for roof hatch. provide electrical signage, unit smoke detector, dryer inter connect, change sleeping areas for 4th, 5th floors.Details
rev. to apprvd. pa#2004/11/30/0290 - provide structural for roof hatch. provide electrical signage, unit smoke detector, dryer inter connect, change sleeping areas for 4th, 5th floors. | ||
| Jun 21, 2005 | Completed final sign-off Nov 2005 | 617 Spruce St | interior remodel of (e) residence to include 1 new bath, 1 remodeled bath & remodeled bedroom.Details
interior remodel of (e) residence to include 1 new bath, 1 remodeled bath & remodeled bedroom. | $100,000 |