J M E Construction Services Inc
- Based in
- Cupertino
- On San Francisco permits
- Apr 2001 to Mar 2024
- Last 24 months
- 0 permits filed
68 permits since 2000: 53 completed, 15 never finaled.
Of the 15 never-finaled permits, 6 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 2 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 1501 Cortland Av | t.i. of wood window millwork co. demo staircase to exterior, replace (e) treads & handrails & stair to mezzanine, (n) gwb at walls & ceiling. provide electrical as required.Details
t.i. of wood window millwork co. demo staircase to exterior, replace (e) treads & handrails & stair to mezzanine, (n) gwb at walls & ceiling. provide electrical as required. | $25,000 |
| Jul 15, 2011 | Completed final sign-off Feb 2012 | 1501 Cortland Av | build-out of shell for proposed tenant's with shared unisex restrooms. exit corridor & stairs to existing mezzanine.Details
build-out of shell for proposed tenant's with shared unisex restrooms. exit corridor & stairs to existing mezzanine. | $60,000 |
| Sep 13, 2010 | Completed final sign-off Sep 2010 | 969 Hayes St | repair of existing redwood deck. repalce of stairs at redwood deck and landings only. replacing in kind, less than 50% of deck and stairs.Details
repair of existing redwood deck. repalce of stairs at redwood deck and landings only. replacing in kind, less than 50% of deck and stairs. | $2,500 |
| Dec 11, 2003 | Completed final sign-off Feb 2004 | 282 Valley St | repair/replace components of the stairway between the buildings that are rotted/deteriorated -repairDetails
repair/replace components of the stairway between the buildings that are rotted/deteriorated -repair | $4,500 |