Darrel D. Harris
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Hcg Associates, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Sep 2026
73 permits since 2000 (engineer on 56 permits, architect on 13 permits, authorized agent-others on 2 permits, designer on 2 permits): 48 completed, 5 in progress, 12 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 458 40th Av | to comply with nov 202659334. remove (e) brick wall (perimeter wall) at side and rear of property and construct new wood perimeter fence with concrete footing.Details
to comply with nov 202659334. remove (e) brick wall (perimeter wall) at side and rear of property and construct new wood perimeter fence with concrete footing. | $10,000 | |
| Dec 24, 2025 | In progress issued Jan 2026 | 2671 16th Av | Hcg Associates Inc | to comply with nov 202545356. remove (e) brick wall at rear of 2671 16th ave. ref permit 202511189836Details
to comply with nov 202545356. remove (e) brick wall at rear of 2671 16th ave. ref permit 202511189836 | $5,000 |
| Dec 10, 2025 | In progress issued Sep 2026 | 98 Clarendon Av | Wl Pro Builders Inc, Rjm Construction | add (n) 2nd floor exterior deck at rear of property.Details
add (n) 2nd floor exterior deck at rear of property. | $15,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 2030 Fell St | Mcguinness Mccann Group | unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists.Details
unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists. | $40,000 |
| Oct 17, 2024 | Completed final sign-off Jan 2026 | 3733 23rd St | Hcg Associates Inc | kitchen & bathroom remodel. remove/replace flooring in kitchen and bathroom in-kind. install new cabinets under new counter, new appliances. repaint walls. no additional plumbing fixtures.Details
kitchen & bathroom remodel. remove/replace flooring in kitchen and bathroom in-kind. install new cabinets under new counter, new appliances. repaint walls. no additional plumbing fixtures. | $20,000 |
| Oct 1, 2024 | Completed final sign-off Sep 2025 | 98 Clarendon Av | Urban West Construction Inc | remove and replace (e) exterior stairs on east side of building - in kind.Details
remove and replace (e) exterior stairs on east side of building - in kind. | $5,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2026 | 253 05th Av | Michael Mc Nulty Construction***Ask Id | revision to pa 202212138217, pa 202304196035, and pa 202305318936. replace existing stair from rear yard to alley; modify retaining wall per geotechnical report; clarify construction type (va); revise rear deck and provide additional structural details for previously approved rear deck. repair andDetails
revision to pa 202212138217, pa 202304196035, and pa 202305318936. replace existing stair from rear yard to alley; modify retaining wall per geotechnical report; clarify construction type (va); revise rear deck and provide additional structural details for previously approved rear deck. repair and | $15,000 |
| Jan 30, 2024 | Completed final sign-off Feb 2025 | 68 Haight St | Guzman - Suffolk Jv Llc | comply with nov#202302977. repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement & upgrades to wood structure including new posts, beams and addition phase 2 work simpson strong wall system in support of #202311301718Details
comply with nov#202302977. repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement & upgrades to wood structure including new posts, beams and addition phase 2 work simpson strong wall system in support of #202311301718 | $155,000 |
| Nov 30, 2023 | Completed final sign-off Jul 2025 | 68 Haight St | Guzman - Suffolk Jv Llc, F D C Construction Inc | to comply with nov#202302977. includes: repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement lv and upgrades to the wood structure including new posts, beams and addition of simpson strong wall sys.Details
to comply with nov#202302977. includes: repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement lv and upgrades to the wood structure including new posts, beams and addition of simpson strong wall sys. | $1,600,000 |
| Nov 8, 2023 | In progress issued May 2024 | 530 18th Av | Hcg Associates Inc | add rear stairs and landing, dry rot repair in south lightwellDetails
add rear stairs and landing, dry rot repair in south lightwell | $8,000 |
| Sep 13, 2023 | Never finaled issued Oct 2023, no final | 530 18th Av | Hcg Associates Inc | voluntary seismic retrofit of ground flDetails
voluntary seismic retrofit of ground fl | $50,000 |
| Dec 13, 2022 | Completed final sign-off Feb 2026 | 253 05th Av | Michael Mc Nulty Construction***Ask Id | interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps.Details
interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps. | $207,000 |
| Nov 21, 2022 | Expired or cancelled withdrawn Nov 2023 | 1467 Kearny St | Mcguinness Mccann Group | extend portion of interior basement retaining wall height along kearny, modify kearny street structure. also extend portion of basement retaining wall height along filbert st. remodel entry lobby and remove stairs to basement (per prj).Details
extend portion of interior basement retaining wall height along kearny, modify kearny street structure. also extend portion of basement retaining wall height along filbert st. remodel entry lobby and remove stairs to basement (per prj). | $20,000 |
| Jul 20, 2022 | Never finaled issued Aug 2022, no final | 2248 Jerrold Av | 7x7 Construction | revision to permit #202012070392 removing details about framing ground per pre-fabricated cages from plans. submitting sk drawings per inspertor's request.Details
revision to permit #202012070392 removing details about framing ground per pre-fabricated cages from plans. submitting sk drawings per inspertor's request. | |
| Mar 30, 2022 | Completed final sign-off Aug 2022 | 834 Castro St | Mcguinness Mccann Group | rev to pa202111051885 & 202106021504: structural chagnes to due to field changes for balconies.Details
rev to pa202111051885 & 202106021504: structural chagnes to due to field changes for balconies. | |
| Feb 22, 2022 | Never finaled issued Sep 2022, no final | 1182 Palou Av | rev pa 201709279750 & 2017-0927-9752 structural modificaiton retaining wall re calculation height under pinDetails
rev pa 201709279750 & 2017-0927-9752 structural modificaiton retaining wall re calculation height under pin | ||
| Jan 3, 2022 | Completed final sign-off Feb 2024 | 478 04th Av | Picone Renovations, Conneely Construction | remove and replace rear stairs in kind. add new foundation under rear of building.Details
remove and replace rear stairs in kind. add new foundation under rear of building. | $15,000 |
| Dec 23, 2021 | Completed final sign-off Feb 2023 | 83 Apollo St | Cht Properties Development | 1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height.Details
1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height. | $52,000 |
| Aug 18, 2021 | Completed final sign-off Apr 2022 | 1970 Bush St | S Mc Cann Construction Inc | dryrot repairs and north building facade to be replaced with same new material.Details
dryrot repairs and north building facade to be replaced with same new material. | $20,000 |
| Aug 16, 2021 | Completed final sign-off Jul 2022 | 1465 05th Av | E F Mcginness And Sons | remove and replace damaged conrette and wood framing in front of exteriorDetails
remove and replace damaged conrette and wood framing in front of exterior | $20,000 |
| Jun 2, 2021 | Completed final sign-off Oct 2022 | 834 Castro St | E F Mcginness And Sons | repair & replace exterior balconys (3rd/4th flr) in-kind.Details
repair & replace exterior balconys (3rd/4th flr) in-kind. | $15,000 |
| Apr 19, 2021 | Expired or cancelled cancelled Jan 2026 | 1271 Mcallister St | Balla Construction And Design | revision to pa 201902132848. voluntary structural repairs.Details
revision to pa 201902132848. voluntary structural repairs. | |
| Apr 16, 2021 | Never finaled issued Aug 2021, no final | 3733 17th St | S Mc Cann Construction Inc | remove and replace dry rotted decks, stair, fence and rear wall in-kind.Details
remove and replace dry rotted decks, stair, fence and rear wall in-kind. | $8,000 |
| Jan 13, 2021 | Completed final sign-off Feb 2023 | 425 Upper Tr | Hcg Associates Inc | unit #2: structural repairs to rear cantilevered balconies and courtyard stairs.Details
unit #2: structural repairs to rear cantilevered balconies and courtyard stairs. | $80,000 |
| Dec 7, 2020 | Never finaled issued Mar 2022, no final | 2248 Jerrold Av | 7x7 Construction, Terry Mc Daniel Construction | tenant improvement; revised to indicate proposed change of use to a cannabis manufacturing, distribution and parcel delivery use in addition to proposed tenant improvement, dmj 08/16/2021;Details
tenant improvement; revised to indicate proposed change of use to a cannabis manufacturing, distribution and parcel delivery use in addition to proposed tenant improvement, dmj 08/16/2021; | $8,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 20 Clayton St | E F Mcginness And Sons | voluntary seismic retrofit of soft story building per 2016 cebc appendex a-4.Details
voluntary seismic retrofit of soft story building per 2016 cebc appendex a-4. | $50,000 |
| Nov 20, 2020 | Never finaled issued Dec 2020, no final | 211 Fair Oaks St | E F Mcginness And Sons | r/r dry rotted portions of rear deck and stairs, in-kind.Details
r/r dry rotted portions of rear deck and stairs, in-kind. | $12,000 |
| Nov 5, 2019 | Completed final sign-off Nov 2021 | 2577 Sacramento St | E F Mcginness And Sons | replace retaining wall and foundation at west wall on ground floor.Details
replace retaining wall and foundation at west wall on ground floor. | $15,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 377 Mangels Av | Hcg Associates Inc | rev to pa201907165989: modify foundation, add side walss and replace (e) windows in rear.Details
rev to pa201907165989: modify foundation, add side walss and replace (e) windows in rear. | $2,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2020 | 2737 Polk St | Hcg Associates Inc | rev to pa201709016763 / 201808278388 / 201812188674 / 201906113146: relocate shear wall from laundry / furnace wall to landry /garage wall.Details
rev to pa201709016763 / 201808278388 / 201812188674 / 201906113146: relocate shear wall from laundry / furnace wall to landry /garage wall. | $5,000 |
| Oct 22, 2019 | Completed final sign-off Apr 2021 | 518 06th Av | Hcg Associates Inc | rev to pa201709148225: reconfigure & reconstruction 1/f floor interior floors along lines 1a & 3 on plans.Details
rev to pa201709148225: reconfigure & reconstruction 1/f floor interior floors along lines 1a & 3 on plans. | |
| Sep 25, 2019 | Never finaled issued Jan 2020, no final | 848 Girard St | Hcg Associates Inc | foundation and framing rehabilitation of garage area. expand garage footprint by 60 s.f. add roof deck around north side bay window.Details
foundation and framing rehabilitation of garage area. expand garage footprint by 60 s.f. add roof deck around north side bay window. | $60,000 |
| Jul 16, 2019 | Completed final sign-off Aug 2021 | 377 Mangels Av | Hcg Associates Inc | foundation repair and strengthening to correct building settlement.Details
foundation repair and strengthening to correct building settlement. | $50,000 |
| Jun 20, 2019 | Never finaled issued Sep 2019, no final | 22 Cervantes Bl | Hcg Associates Inc | remove and replace extg stair in kind. n/a for maherDetails
remove and replace extg stair in kind. n/a for maher | $10,000 |
| Jun 11, 2019 | Completed final sign-off Jan 2020 | 2737 Polk St | Hcg Associates Inc | revision to app#201709016763 and 201808278388 show e door to rear yard and revise shear wall. deleted removal fire brick in furnace room from scope n/a for maherDetails
revision to app#201709016763 and 201808278388 show e door to rear yard and revise shear wall. deleted removal fire brick in furnace room from scope n/a for maher | $500 |
| Nov 1, 2018 | Completed final sign-off Feb 2019 | 396 Capp St | Sam Wing Construction Inc | rev to pa# 201709016723; add new foundation and shear walls in basement per request from building inspectorDetails
rev to pa# 201709016723; add new foundation and shear walls in basement per request from building inspector | |
| Oct 30, 2018 | Completed final sign-off Apr 2019 | 2221 Judah St | Hcg Associates Inc | revision to soft story pa #201709289855. structural revision.Details
revision to soft story pa #201709289855. structural revision. | |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 230 Sanchez St | Global Arch Construction Inc | seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (residential portion). share same plan set with pa 201809129921.Details
seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (residential portion). share same plan set with pa 201809129921. | $10,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 230 Sanchez St | Global Arch Construction Inc | seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (commercial portion). share same plan set with pa 201809129917.Details
seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (commercial portion). share same plan set with pa 201809129917. | $70,000 |
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 86 St Marys Av | Michael Mc Nulty Construction***Ask Id | foundation and framing rehabilitation of rear exterior area; improve drainage around exterior perimeter buildingDetails
foundation and framing rehabilitation of rear exterior area; improve drainage around exterior perimeter building | $8,000 |
| May 23, 2018 | Expired or cancelled withdrawn Jun 2018 | 151 Turquoise Wy | remove extg wall between kitchen and dining room. add new ceiling beam and simpson steel strong wall.Details
remove extg wall between kitchen and dining room. add new ceiling beam and simpson steel strong wall. | $8,000 | |
| May 17, 2018 | Completed final sign-off Jan 2019 | 1221 29th Av | Terry Mc Daniel Construction | revision to app#201803012587. add doors in garage. install subsurface drainage system to connect to gray systemDetails
revision to app#201803012587. add doors in garage. install subsurface drainage system to connect to gray system | $5,000 |
| Mar 13, 2018 | Never finaled issued Jun 2020, no final | 2535 14th Av | Beyond The Horizon Construction | replace rear deck and railing, on-grade, less than 30in.Details
replace rear deck and railing, on-grade, less than 30in. | $5,000 |
| Dec 29, 2017 | Completed final sign-off Jun 2018 | 2034 47th Av | Trim Fit Constr. - O'reilly Engineering | kitchen remodel. remove wall between extg kitchen and living room.Details
kitchen remodel. remove wall between extg kitchen and living room. | $10,000 |
| Oct 17, 2017 | Completed final sign-off Dec 2023 | 285 San Jose Av | Hcg Associates Inc | seismic retrofit per sf ord 66-13. seismic strengthening of soft story, wood frame building per sfebc appendix a-4. no change to building footprint or exterior appearanceDetails
seismic retrofit per sf ord 66-13. seismic strengthening of soft story, wood frame building per sfebc appendix a-4. no change to building footprint or exterior appearance | $80,000 |
| Oct 6, 2017 | Expired or cancelled expired Jun 2023 | 3341 Cesar Chavez St | Hcg Associates Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $80,000 |
| Sep 15, 2017 | Completed final sign-off Jul 2018 | 2701 Sacramento St | Hcg Associates Inc | seismic retrofit per sf ord no 6613. seismic strengthening of soft story wood frame building. no change to building footprint or exterior appearanceDetails
seismic retrofit per sf ord no 6613. seismic strengthening of soft story wood frame building. no change to building footprint or exterior appearance | $80,000 |
| Sep 1, 2017 | Expired or cancelled cancelled Oct 2020 | 701 24th Av | Hcg Associates Inc, Sincere Construction Company Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2020 | 2737 Polk St | Hcg Associates Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $80,000 |
| Aug 24, 2017 | Completed final sign-off Jun 2022 | 260 West Portal Av | Wong Construction Inc | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. residentialDetails
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. residential | $140,000 |
| Aug 23, 2017 | Never finaled issued Apr 2018, no final | 76 Rico Wy | interior remodel and upgrade stairs (76a rico way). no change to exterior appearance or building footprint. change 1/4 bath to 3/4 bath upgrade stairs (76 rico way). new garage door, window at 3rd fl. n/a for maherDetails
interior remodel and upgrade stairs (76a rico way). no change to exterior appearance or building footprint. change 1/4 bath to 3/4 bath upgrade stairs (76 rico way). new garage door, window at 3rd fl. n/a for maher | $50,000 | |
| Aug 18, 2017 | Never finaled issued Apr 2021, no final | 1781 Church St | Qse Construction | commercial: soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4. n/a for maherDetails
commercial: soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4. n/a for maher | $50,000 |
| Aug 18, 2017 | Never finaled issued Apr 2021, no final | 1781 Church St | Qse Construction | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ** maher: n/a **Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ** maher: n/a ** | $100,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2022 | 260 West Portal Av | Wong Construction Inc | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. commer.cialDetails
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. commer.cial | $10,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2021 | 17 Ashbury St | E F Mcginness And Sons | soft story upgrade - revision to app#201609299163 - to add holdowns to satisfy special inspection requirments. n/a for maher.Details
soft story upgrade - revision to app#201609299163 - to add holdowns to satisfy special inspection requirments. n/a for maher. | $500 |
| Jul 5, 2017 | Completed final sign-off May 2020 | 551 37th Av | Hcg Associates Inc | to comply nov 201790661. revision to 201611293652. restore front porch to orig condition. document removal of rear kitchen popout. verify adquacy of (e)foundation.show new 2/fl joists framing. restore brick facade south wall.Details
to comply nov 201790661. revision to 201611293652. restore front porch to orig condition. document removal of rear kitchen popout. verify adquacy of (e)foundation.show new 2/fl joists framing. restore brick facade south wall. | |
| Feb 24, 2017 | Completed final sign-off Jan 2018 | 371 Noe St | Jasafi Construction Inc | comply nov201612125.interior remodl of(e)2 units bld.1st level:remodel e bath,provide 2 full bath, remodel kitchen,bedrm,n/wood landing&stairs at side property.replace windows as indicate.2nd level,remodl(e)bath,provide w full baths/remodl kitchen&bedrms.replace windows,add ful bath.no merg of (e)Details
comply nov201612125.interior remodl of(e)2 units bld.1st level:remodel e bath,provide 2 full bath, remodel kitchen,bedrm,n/wood landing&stairs at side property.replace windows as indicate.2nd level,remodl(e)bath,provide w full baths/remodl kitchen&bedrms.replace windows,add ful bath.no merg of (e) | $180,000 |
| Feb 23, 2017 | Completed final sign-off May 2017 | 1624 Fulton St | Ardo Construction Co. | remove rear stair and landing. replace in kind (same) same footprintDetails
remove rear stair and landing. replace in kind (same) same footprint | $15,000 |
| Nov 2, 2016 | Completed final sign-off Feb 2017 | 4900 Fulton St | E F Mcginness And Sons | remove and replace dryrotted material in north stairwell. in reference to 2016-06-29-1218, permit addendum.Details
remove and replace dryrotted material in north stairwell. in reference to 2016-06-29-1218, permit addendum. | $4,000 |
| Jul 14, 2016 | Completed final sign-off May 2017 | 371 Noe St | E F Mcginness And Sons | removal of existing aluminum siding to reveal historic siding underneath; building is one of 3 matching neighboring buildings; where revealed wood siding and trim elements are rotted beyond repair, exterior to be restored to match historic conditions; new windows to be all-wood, double hung windowsDetails
removal of existing aluminum siding to reveal historic siding underneath; building is one of 3 matching neighboring buildings; where revealed wood siding and trim elements are rotted beyond repair, exterior to be restored to match historic conditions; new windows to be all-wood, double hung windows | $500 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 3037 22nd St | Spryscapes Const Inc. | remove and replace rear stairs in kind.Details
remove and replace rear stairs in kind. | $10,000 |
| Jun 29, 2016 | Completed final sign-off Feb 2017 | 4900 Fulton St | E F Mcginness And Sons | remove and replace extg stairway in kind. remove extg stucco around stairs and replace with hardie panel. to comply with notice of violation #201567412.Details
remove and replace extg stairway in kind. remove extg stucco around stairs and replace with hardie panel. to comply with notice of violation #201567412. | $10,000 |
| Feb 3, 2016 | Completed final sign-off Jun 2017 | 1600 Anza St | soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4 | $80,000 | |
| Dec 16, 2015 | Completed final sign-off Dec 2019 | 557 04th Av | Balla Construction And Design | rear 1st floor addition. convert (e) basement to living space. create 1 bedroom & 1 bathroom.Details
rear 1st floor addition. convert (e) basement to living space. create 1 bedroom & 1 bathroom. | $75,000 |
| May 22, 2015 | Completed final sign-off Aug 2016 | 377 Collingwood St | new 585 sf roof deckDetails
new 585 sf roof deck | $8,000 | |
| Feb 2, 2015 | Completed final sign-off Feb 2018 | 370 Athens St | Balla Construction And Design | (n) 238 sq ft addition & roof deck above @ rear of (e) single family residence.Details
(n) 238 sq ft addition & roof deck above @ rear of (e) single family residence. | $50,000 |
| Nov 12, 2013 | Completed final sign-off Apr 2014 | 1486 07th Av | Balla Construction And Design | remove and replace roof deck, connected rear deck and rear stairs in kind. revision to approved permit #201310048513Details
remove and replace roof deck, connected rear deck and rear stairs in kind. revision to approved permit #201310048513 | $10,000 |
| Nov 6, 2013 | Expired or cancelled cancelled Jan 2026 | 1190 Green St | reconstruct extg deteriorated rear wood egress stair in kind.Details
reconstruct extg deteriorated rear wood egress stair in kind. | $40,000 | |
| May 31, 2013 | Completed final sign-off Jan 2014 | 655 26th Av | Balla Construction And Design | all work is to be structural modifications in existing garage/basement area. 1) remove 2 wood posts, add garage ceiling beam, 2) add ancor bolts and plywood at existing exterior walls, 3) add steel rigid frame 4) add concrete footing under rear building extensionDetails
all work is to be structural modifications in existing garage/basement area. 1) remove 2 wood posts, add garage ceiling beam, 2) add ancor bolts and plywood at existing exterior walls, 3) add steel rigid frame 4) add concrete footing under rear building extension | $25,000 |
| Sep 22, 2008 | Completed final sign-off Jan 2011 | 56 Sotelo Av | patio cement poured, pergola + column installed, front wall & gate installed, front steps to street, fountain installed.Details
patio cement poured, pergola + column installed, front wall & gate installed, front steps to street, fountain installed. | $30,000 | |
| Jul 21, 2008 | Expired or cancelled expired Oct 2013 | 200 Brannan St | unit #238-stair replacement within a condo; replace with new steel stair; no change to configuration or layout; refer to pa#2005/10/17/5762Details
unit #238-stair replacement within a condo; replace with new steel stair; no change to configuration or layout; refer to pa#2005/10/17/5762 | $10,000 | |
| Sep 5, 2007 | Expired or cancelled cancelled Sep 2012 | 1406 Montgomery St | remodel face of building to widen garage door opening from 12'6" to 14'0"Details
remodel face of building to widen garage door opening from 12'6" to 14'0" | $2,500 | |
| Apr 22, 2004 | Completed final sign-off Feb 2005 | 60 Retiro Wy | revised permit no. 200307300749- build roof deck on existing roofDetails
revised permit no. 200307300749- build roof deck on existing roof |