Block 1212, lot 011
2030 Fell St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 15,186 sq ft
- Lot
- 7,988 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Mar 2026 | 2030 Fell St | Mcguinness Mccann Group | 4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom.Details
4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom. | $30,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 2030 Fell St | Mcguinness Mccann Group | unit #5: replace all finishes and fixtures in-kindDetails
unit #5: replace all finishes and fixtures in-kind | $30,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 2030 Fell St | Mcguinness Mccann Group | unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists.Details
unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists. | $40,000 |
| Oct 9, 2024 | In progress issued Oct 2024 | 2030 Fell St | Mcguinness Mccann Group | unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removalDetails
unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removal | $20,000 |
| Sep 13, 2023 | Completed final sign-off Mar 2024 | 2030 Fell St | Mcguinness Mccann Group | replacement of cracked and rotted siding in east side lightwell. replace in kind. approx one hundred square feet.Details
replacement of cracked and rotted siding in east side lightwell. replace in kind. approx one hundred square feet. | $18,000 |
| Nov 10, 2022 | Completed final sign-off Jul 2023 | 2030 Fell St | Mcguinness Mccann Group | unit 6: relocate walls of 4/f, strengthening ceiling joists in partial garage ceilingDetails
unit 6: relocate walls of 4/f, strengthening ceiling joists in partial garage ceiling | $5,000 |
| Oct 25, 2022 | Completed final sign-off Jul 2023 | 2030 Fell St | Mcguinness Mccann Group | unit #6: exploratory demo only in unit #6 to facilitate the engineer drawings if necessary for future permits. top floor unit. patch ceiling after.Details
unit #6: exploratory demo only in unit #6 to facilitate the engineer drawings if necessary for future permits. top floor unit. patch ceiling after. | $3,000 |
| Aug 23, 2021 | Completed final sign-off Nov 2021 | 2030 Fell St | E F Mcginness And Sons | current siding on east wall rear section is cracked, falling off, been patched has rot. replace in kind with new waterproofing & flashing, approx 875 sq ft.Details
current siding on east wall rear section is cracked, falling off, been patched has rot. replace in kind with new waterproofing & flashing, approx 875 sq ft. | $16,000 |
| Jun 14, 2021 | Completed final sign-off Nov 2021 | 2030 Fell St | E F Mcginness And Sons | #10 - replace all fixtures, fittings and cosmetic items in the one bathroom and one kitchen and paint. no structural or layout changes. replace in kind approx 100 sf of rotted siding in lightwell outside the bathroom window. plumbing and electrical by othersDetails
#10 - replace all fixtures, fittings and cosmetic items in the one bathroom and one kitchen and paint. no structural or layout changes. replace in kind approx 100 sf of rotted siding in lightwell outside the bathroom window. plumbing and electrical by others | $18,000 |
| May 26, 2021 | Never finaled issued Aug 2021, no final | 2030 Fell St | Byington Electric Corp | this is a renovation of an existing building. a new fire alarm system will be installed. central station monitoring: signals reported to central station via cellular communicator complies with 1103.7.6.1.Details
this is a renovation of an existing building. a new fire alarm system will be installed. central station monitoring: signals reported to central station via cellular communicator complies with 1103.7.6.1. | $15,000 |
| Jun 13, 2020 | Completed final sign-off Nov 2021 | 2030 Fell St | E F Mcginness And Sons | unit #8: remodel kitchen - new cabinets, countertops, appliances.Details
unit #8: remodel kitchen - new cabinets, countertops, appliances. | $17,000 |
| May 11, 2020 | Completed final sign-off Nov 2021 | 2030 Fell St | E F Mcginness And Sons | dry-rot repair siding on stair-well east side (no strcutural work). approximately 600 sq feet of siding to be replaced. roof patching as needed with edge flashing on flat roof.Details
dry-rot repair siding on stair-well east side (no strcutural work). approximately 600 sq feet of siding to be replaced. roof patching as needed with edge flashing on flat roof. | $15,000 |
| Mar 6, 2020 | Never finaled issued Mar 2020, no final | 2030 Fell St | street spaceDetails
street space | ||
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 2030 Fell St | street spaceDetails
street space | ||
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 2030 Fell St | street spaceDetails
street space | ||
| Dec 4, 2014 | Completed final sign-off Mar 2016 | 2030 Fell St | On Point Construction | ground floor wall strengthening. soft story mandatory seismic upgrade. soft story retrofit to comply w/sfbc chp34b using 2012 iebc appendix a-4.Details
ground floor wall strengthening. soft story mandatory seismic upgrade. soft story retrofit to comply w/sfbc chp34b using 2012 iebc appendix a-4. | $100,000 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 2030 Fell St | street spaceDetails
street space | ||
| Jul 17, 2014 | Never finaled issued Jul 2014, no final | 2030 Fell St | street space permitDetails
street space permit | ||
| Mar 11, 2014 | Never finaled issued Mar 2014, no final | 2030 Fell St | street spaceDetails
street space | ||
| Aug 23, 2012 | Completed final sign-off Mar 2016 | 2030 Fell St | On Point Construction | ab-094. soft story voluntary limited seismic upgrade.Details
ab-094. soft story voluntary limited seismic upgrade. | $150,000 |
| Jun 13, 2011 | Completed final sign-off Aug 2011 | 2030 Fell St | R & D Construction Co Inc | 1. replace kitchen cabinets and counter top. 2. upgrade electrical circuits in kitchen, change ceiling light fixtures. at least 50% high efficiency lighting by wattage. cec 150 (k). 3. replace kitchen sink and dishwasher.Details
1. replace kitchen cabinets and counter top. 2. upgrade electrical circuits in kitchen, change ceiling light fixtures. at least 50% high efficiency lighting by wattage. cec 150 (k). 3. replace kitchen sink and dishwasher. | $9,700 |
| Nov 29, 2010 | Completed final sign-off Dec 2010 | 2030 Fell St | Make Ready Maintenance Inc | unit #8: install 3 g.f.c.i./ 1 subpanel, remove and repalce (2) lite fixtures. remove and repalce kitchen cabinets; rmove and replaceDetails
unit #8: install 3 g.f.c.i./ 1 subpanel, remove and repalce (2) lite fixtures. remove and repalce kitchen cabinets; rmove and replace | $18,000 |
| Aug 28, 2006 | Expired or cancelled expired Dec 2010 | 2030 Fell St | S'top Home Service Roofing Co. Inc. | reroofingDetails
reroofing | $24,880 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mcguinness Mccann Group (7), E F Mcginness And Sons (4), On Point Construction (2), Byington Electric Corp, Make Ready Maintenance Inc, R & D Construction Co Inc, S'top Home Service Roofing Co. Inc.
- Engineers
- Albert Urrutia, Darrel Harris, Darrel Harris, John K Westphal
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.