Block 6720, lot 042
86 Saint Marys Ave
- City’s use
- Single Family Residential
- Built
- 1905
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,690 sq ft
- Lot
- 2,461 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 29, 2022 | Expired or cancelled cancelled Jan 2026 | 86 St Marys Av | Jemico Llc Dba Renewal By Andersen Of Sf | replacing 2 windows, same size and location. street visible. u factor <.30 (e) wood (n) wood fiberDetails
replacing 2 windows, same size and location. street visible. u factor <.30 (e) wood (n) wood fiber | $6,130 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 86 St Marys Av | streetspaceDetails
streetspace | ||
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 86 St Marys Av | Michael Mc Nulty Construction***Ask Id | foundation and framing rehabilitation of rear exterior area; improve drainage around exterior perimeter buildingDetails
foundation and framing rehabilitation of rear exterior area; improve drainage around exterior perimeter building | $8,000 |
| Mar 27, 2013 | Completed final sign-off Oct 2020 | 86 St Marys Av | voluntary lateral strengthening (adding anchor bolts, tie-down sheathing, braced wall, post to beam & beam to wall connectors, rafter ties.Details
voluntary lateral strengthening (adding anchor bolts, tie-down sheathing, braced wall, post to beam & beam to wall connectors, rafter ties. | $4,000 | |
| Mar 15, 2013 | Completed final sign-off Jun 2013 | 86 St Marys Av | legalize part of (e) ground level into habitable space (405 sf) incl ma bedrm w/mas bath , storage + laundry. demo full bath @ grd level, add half bath @ 2nd level. add threshold plate @ grd level street facing door, add handrails to (e) stairs, update & upgrade plbg,elec & mech system.Details
legalize part of (e) ground level into habitable space (405 sf) incl ma bedrm w/mas bath , storage + laundry. demo full bath @ grd level, add half bath @ 2nd level. add threshold plate @ grd level street facing door, add handrails to (e) stairs, update & upgrade plbg,elec & mech system. | $50,000 | |
| Apr 27, 2012 | Completed final sign-off May 2012 | 86 St Marys Av | Armstrong Installation Service | reroofingDetails
reroofing | $17,000 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 86 St Marys Av | 21st Century Home Improvt | remove 1 patio door 4 windows and replace with new wood patio door, new wood windows, in kind. no structural changes, all in front of house. u-factor =0.40Details
remove 1 patio door 4 windows and replace with new wood patio door, new wood windows, in kind. no structural changes, all in front of house. u-factor =0.40 | $6,000 |
| Feb 1, 2006 | Expired or cancelled expired Jul 2007 | 86 St Marys Av | Hough Construction | repair fungus & dry rot as outlined in termite report# 47223 by lingruen termit co. # 2a, # 5a, # 5b, # 5c.Details
repair fungus & dry rot as outlined in termite report# 47223 by lingruen termit co. # 2a, # 5a, # 5b, # 5c. | $7,500 |
| Nov 30, 2005 | Completed final sign-off Jan 2006 | 86 St Marys Av | Hough Construction | existing concrete stairway at front, replace in kind. repair wood stairs at front in kind.Details
existing concrete stairway at front, replace in kind. repair wood stairs at front in kind. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hough Construction (2), 21st Century Home Improvt, Armstrong Installation Service, Jemico Llc Dba Renewal By Andersen Of Sf, Michael Mc Nulty Construction***Ask Id
- Engineers
- Darrel D. Harris, Peter A Culley S.E
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.