Sam Wing Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jul 2014 to Sep 2019
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2019 | Completed final sign-off Oct 2020 | 1720 Balboa St | revision to app#201708148156 per soft story retrofit. 1)detail for shearwall s-1, location on right side corridor. 2) detail for shear wall s-2" if ext exist with out foundations. non other work.Details
revision to app#201708148156 per soft story retrofit. 1)detail for shearwall s-1, location on right side corridor. 2) detail for shear wall s-2" if ext exist with out foundations. non other work. | $3,000 |
| Nov 1, 2018 | Completed final sign-off Feb 2019 | 396 Capp St | rev to pa# 201709016723; add new foundation and shear walls in basement per request from building inspectorDetails
rev to pa# 201709016723; add new foundation and shear walls in basement per request from building inspector | |
| Oct 26, 2018 | Completed final sign-off Aug 2019 | 419 Lisbon St | replace the treads and railing only, existing is wood to be replacing with wood. railings will be replaced in kind to match the pattern in google 2017 photos. no change of material or pattern per this approval. less than 50%.Details
replace the treads and railing only, existing is wood to be replacing with wood. railings will be replaced in kind to match the pattern in google 2017 photos. no change of material or pattern per this approval. less than 50%. | $5,000 |
| May 8, 2018 | Completed final sign-off Apr 2019 | 419 Lisbon St | replace front 4 windows in-kind with alum clad wood windows. 2 double hungs and 2 fixed windows. u factor is 0.32 maxDetails
replace front 4 windows in-kind with alum clad wood windows. 2 double hungs and 2 fixed windows. u factor is 0.32 max | $2,000 |
| Apr 30, 2018 | Completed final sign-off Feb 2019 | 396 Capp St | revision to 201709016723 to revise connection between walls and floor joistsDetails
revision to 201709016723 to revise connection between walls and floor joists | $5,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2019 | 419 Lisbon St | revision to pa#201708074030. new patio and new deck at rear. reconfigure interior stairs and laundry. changes to structural plan.Details
revision to pa#201708074030. new patio and new deck at rear. reconfigure interior stairs and laundry. changes to structural plan. | $15,000 |
| Sep 14, 2017 | Completed final sign-off Oct 2020 | 1720 Balboa St | soft story retrofit per sfebc chapter 4d, fema-p807, add (1) s.m.f. & shearwall on 1/f, v.i.f. shearwall on 2/f & 3/f. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, fema-p807, add (1) s.m.f. & shearwall on 1/f, v.i.f. shearwall on 2/f & 3/f. n/a ordinance #155-13 | $25,000 |
| Sep 1, 2017 | Completed final sign-off Feb 2019 | 396 Capp St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $30,000 |
| Aug 7, 2017 | Completed final sign-off Sep 2019 | 419 Lisbon St | 1/f: add 2 bedrooms, 3 full baths, 1 office, 1 media and laundry. 2/f: remodel kitchen & bath, add 1 bath, new interior stairs, enclose left lightwell on 2/f, infill at rear, new deck.Details
1/f: add 2 bedrooms, 3 full baths, 1 office, 1 media and laundry. 2/f: remodel kitchen & bath, add 1 bath, new interior stairs, enclose left lightwell on 2/f, infill at rear, new deck. | $80,000 |
| Mar 30, 2017 | Completed final sign-off May 2017 | 2419 43rd Av | kitchen remodel on 2nd floor. fixtures to remain at same location.Details
kitchen remodel on 2nd floor. fixtures to remain at same location. | $21,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 772 Stanyan St | to continue work under previously approved pa #201512225787. n/a maher ord. 155-13Details
to continue work under previously approved pa #201512225787. n/a maher ord. 155-13 | $17,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2017 | 261 11th Av | 1st flr(#261); infill at rear, enclose lightwells,&new patio,add 2 bedrms, 1 media & 1 bath, 2nd flr (#261: total remodel,new deck at rear. 3rd flr(#263)total remodel, add 1 bath and stairs to new roof deck.Details
1st flr(#261); infill at rear, enclose lightwells,&new patio,add 2 bedrms, 1 media & 1 bath, 2nd flr (#261: total remodel,new deck at rear. 3rd flr(#263)total remodel, add 1 bath and stairs to new roof deck. | $180,000 |
| May 4, 2016 | Completed final sign-off Jun 2016 | 3621 Ortega St | kitchen remodel. replace counter top and cabinets. no walls to be altered or removed.Details
kitchen remodel. replace counter top and cabinets. no walls to be altered or removed. | $12,000 |
| Feb 26, 2016 | Completed final sign-off Aug 2016 | 85 Duncan St | remove non-bearing wall between kitchen and dining room. remodeling extg kitchen. change the cabinets and countertop. upgrade electrical up to 2013 electrical code in kitchen area. unit 1Details
remove non-bearing wall between kitchen and dining room. remodeling extg kitchen. change the cabinets and countertop. upgrade electrical up to 2013 electrical code in kitchen area. unit 1 | $15,000 |
| Jun 4, 2015 | Completed final sign-off Jun 2016 | 930 Monterey Bl | add 1 bathroom between 2 bedrooms on 1st fl. enlarge garage door to 8'6 on gr flDetails
add 1 bathroom between 2 bedrooms on 1st fl. enlarge garage door to 8'6 on gr fl | $15,000 |
| Mar 24, 2015 | Completed final sign-off Jun 2016 | 930 Monterey Bl | interior work only: remodeling the master bathroom & walkin closet, remodeling (e) kitchen - replace cabinets, oven, island counter.Details
interior work only: remodeling the master bathroom & walkin closet, remodeling (e) kitchen - replace cabinets, oven, island counter. | $20,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 2526 Van Ness Av | to comply with nov 201410413- seal up hole under leaking p-trap in garage ceiling and to fix roof leak and dry rot at garage on south side of building partial.Details
to comply with nov 201410413- seal up hole under leaking p-trap in garage ceiling and to fix roof leak and dry rot at garage on south side of building partial. | $300 |
| Mar 18, 2015 | Never finaled filed Mar 2015, never issued | 2526 Van Ness Av | to comply with nov #201410413 - seal up hole under leaking p-trap in garage ceiling and to fix roof leak and dry rot at garage on south side of building - partial n/a maher ordinance # 155-13Details
to comply with nov #201410413 - seal up hole under leaking p-trap in garage ceiling and to fix roof leak and dry rot at garage on south side of building - partial n/a maher ordinance # 155-13 | $300 |
| Jul 17, 2014 | Never finaled issued Oct 2014, no final | 1747 Eucalyptus Dr | revision to 201404304611. rebuild exterior staircase. infill entrance spaceDetails
revision to 201404304611. rebuild exterior staircase. infill entrance space |