Permit GraphShortlistSan Francisco building permits since 2000

Block 0627, lot 014

2250 Buchanan St

City’s use
Multi-Family Residential
Built
1955
Stories
4
Units
19
Rooms
19 bathrooms
Building
9,474 sq ft
Lot
3,044 sq ft
Zoning
RM1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

13 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 11, 2023Completed
final sign-off Nov 2023
2250 Buchanan StHalyard Incas-built revision to (f/a) permit 202209283367. provide monitoring equipment for sprinkler system. eliminate double counted equipment in control panel battery calculation table.
Details
Permit
202310118447
Status
complete
Filed
Oct 11, 2023
Permit issued
Oct 30, 2023
Final sign-off
Nov 22, 2023
Address
2250 Buchanan St

as-built revision to (f/a) permit 202209283367. provide monitoring equipment for sprinkler system. eliminate double counted equipment in control panel battery calculation table.

Open the permit page

Sep 28, 2022Completed
final sign-off Nov 2023
2250 Buchanan StHalyard Inclike for like replacement + 2023 mandate installation of fire alarm system in non sprinkered building to satisfy sffc 1103.7.6.1
Details
Permit
202209283367
Status
complete
Filed
Sep 28, 2022
Permit issued
Feb 22, 2023
Final sign-off
Nov 22, 2023
Declared cost
$3,500
Address
2250 Buchanan St

like for like replacement + 2023 mandate installation of fire alarm system in non sprinkered building to satisfy sffc 1103.7.6.1

Open the permit page

$3,500
Oct 7, 2020Never finaled
filed Oct 2020, never issued
2250 Buchanan Stadding two (2) units on first floor per ordinance 162-16. convert existing garage into new dwelling units within (e) envelope. four new bedrooms, three new bathrooms, two new dishwasher, four new washer/dryers. new windows facing the street.
Details
Permit
202010076077
Status
filed
Filed
Oct 7, 2020
Declared cost
$150,000
Address
2250 Buchanan St

adding two (2) units on first floor per ordinance 162-16. convert existing garage into new dwelling units within (e) envelope. four new bedrooms, three new bathrooms, two new dishwasher, four new washer/dryers. new windows facing the street.

Open the permit page

$150,000
Dec 4, 2017Never finaled
filed Dec 2017, never issued
2250 Buchanan Stremodel ground floor to accommodate (2) new adu apartment units per ordinance# 162-16.
Details
Permit
201712045403
Status
filed
Filed
Dec 4, 2017
Declared cost
$100,000
Address
2250 Buchanan St

remodel ground floor to accommodate (2) new adu apartment units per ordinance# 162-16.

Open the permit page

$100,000
Sep 25, 2017Never finaled
issued Apr 2018, no final
2250 Buchanan StSan Francisco Fire Protectionas built to pa#201707061115, install monitor module to tie-in (e) waterflow switch to new panel & relay module for 110v bell to reflect the job site.
Details
Permit
201709259483
Status
issued
Filed
Sep 25, 2017
Permit issued
Apr 16, 2018
Address
2250 Buchanan St

as built to pa#201707061115, install monitor module to tie-in (e) waterflow switch to new panel & relay module for 110v bell to reflect the job site.

Open the permit page

Jul 6, 2017Never finaled
issued Jul 2017, no final
2250 Buchanan StSan Francisco Fire Protectionlike for like voluntary local fire system replacement w/new control panel, smoke detectors & pull stations & annunciator panel at the same location. existing bells will be tie-in to new panel. will comply with new sffc by 2021.
Details
Permit
201707061115
Status
issued
Filed
Jul 6, 2017
Permit issued
Jul 6, 2017
Declared cost
$5,500
Address
2250 Buchanan St

like for like voluntary local fire system replacement w/new control panel, smoke detectors & pull stations & annunciator panel at the same location. existing bells will be tie-in to new panel. will comply with new sffc by 2021.

Open the permit page

$5,500
Mar 17, 2017Completed
final sign-off May 2017
2250 Buchanan StS L M Development Inc.revision to 201610190727: line up the moment frames and omit plywood sheathing in between, soft story retrofit per sfbc chapter 34b - 2012 iebc appendix a-4
Details
Permit
201703171764
Status
complete
Filed
Mar 17, 2017
Permit issued
Mar 17, 2017
Final sign-off
May 5, 2017
Address
2250 Buchanan St

revision to 201610190727: line up the moment frames and omit plywood sheathing in between, soft story retrofit per sfbc chapter 34b - 2012 iebc appendix a-4

Open the permit page

Dec 14, 2016Never finaled
issued Dec 2016, no final
2250 Buchanan Ststreet space permit
Details
Permit
M746647
Status
issued
Filed
Dec 14, 2016
Permit issued
Dec 14, 2016
Address
2250 Buchanan St

street space permit

Open the permit page

Oct 19, 2016Completed
final sign-off May 2017
2250 Buchanan StS L M Development Inc.soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4
Details
Permit
201610190727
Status
complete
Filed
Oct 19, 2016
Permit issued
Nov 8, 2016
Final sign-off
May 5, 2017
Declared cost
$60,000
Address
2250 Buchanan St

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4

Open the permit page

$60,000
Oct 11, 2016Never finaled
issued Oct 2016, no final
2250 Buchanan Stto comply with complaint #2016356624 for units 3,8, & 14 only. replace shower valve wall tiles, replace vanity, lav, faucet, mirror, tile, replace wall light
Details
Permit
201610110006
Status
issued
Filed
Oct 11, 2016
Permit issued
Oct 19, 2016
Declared cost
$10,000
Address
2250 Buchanan St

to comply with complaint #2016356624 for units 3,8, & 14 only. replace shower valve wall tiles, replace vanity, lav, faucet, mirror, tile, replace wall light

Open the permit page

$10,000
Jul 28, 2016Completed
final sign-off Aug 2016
2250 Buchanan StArt-Tek Buildersapt 9: bathroom & kitchen remodel - bathroom: replace shower valve & head, wall & pan tiles, shower door, vanity, lav, faucet, mirror cab & floor tiles, wall light. kitchen: replace 52in countertop, sink & faucet, floor itles, ceiing light fixture.
Details
Permit
201607283544
Status
complete
Filed
Jul 28, 2016
Permit issued
Jul 28, 2016
Final sign-off
Aug 31, 2016
Declared cost
$3,250
Address
2250 Buchanan St

apt 9: bathroom & kitchen remodel - bathroom: replace shower valve & head, wall & pan tiles, shower door, vanity, lav, faucet, mirror cab & floor tiles, wall light. kitchen: replace 52in countertop, sink & faucet, floor itles, ceiing light fixture.

Open the permit page

$3,250
Jul 7, 2015Never finaled
filed Jul 2015, never issued
2250 Buchanan Stinkind replacement of 40 street frontage windows with aluminimum sliders; replace 9 non-visible windows with vinyl; no open pc code enforcement cases or bbns.
Details
Permit
201507070760
Status
filed
Filed
Jul 7, 2015
Address
2250 Buchanan St

inkind replacement of 40 street frontage windows with aluminimum sliders; replace 9 non-visible windows with vinyl; no open pc code enforcement cases or bbns.

Open the permit page

Dec 4, 2002Completed
final sign-off Jan 2003
2250 Buchanan StAnderson Roofing & Sheet Metalreroofing
Details
Permit
200212042730
Status
complete
Filed
Dec 4, 2002
Permit issued
Dec 4, 2002
Final sign-off
Jan 27, 2003
Declared cost
$1,680
Address
2250 Buchanan St

reroofing

Open the permit page

$1,680

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Halyard Inc (2), S L M Development Inc. (2), San Francisco Fire Protection (2), Anderson Roofing & Sheet Metal, Art-Tek Builders
Architects
Heidi Liebes, Jacob Herczeg
Engineers
Ali Afrasiabi
Designers
Halyard Inc (See Note)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.