Ricardo Gonzalez
- Listed as
- architect, engineer
- Firm
- Pivot
- Based in
- Berkeley
- On San Francisco permits
- Feb 2008 to Dec 2025
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 4 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | In progress issued Aug 2026 | 79 Everson St | Cal Am Construction Inc. | construction of new type v-b, 1 story, 1 basement 820sf adu and installation of 620sf paved courtyard.Details
construction of new type v-b, 1 story, 1 basement 820sf adu and installation of 620sf paved courtyard. | $300,000 |
| Aug 21, 2025 | In progress issued Sep 2025 | 170 San Marcos Av | Front Street Builders | revision to pa# 202306281082: structural revisions are required - taller retaining wall due to contion of existing retaining walls previously assumed to be in good condition. (deck and landscaping in rear yard project)Details
revision to pa# 202306281082: structural revisions are required - taller retaining wall due to contion of existing retaining walls previously assumed to be in good condition. (deck and landscaping in rear yard project) | $90,000 |
| Jun 28, 2023 | In progress issued Dec 2024 | 170 San Marcos Av | Front Street Builders | new rear yard landscaping to include a deck with wind screen, new stair from lower level to deck, new elevated walkway, new perimeter fence, no work in house.Details
new rear yard landscaping to include a deck with wind screen, new stair from lower level to deck, new elevated walkway, new perimeter fence, no work in house. | $75,000 |
| Mar 22, 2023 | Never finaled issued Apr 2023, no final | 15 Crescent Av | Angotti & Reilly Inc. | revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings.Details
revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings. | $6,000 |
| Feb 26, 2020 | Completed final sign-off Sep 2021 | 101 Lombard St | interior remodel of (e) 2/f condo unit. infill existing floor opening, add walls to make office. interior work only. sprinkler/fire alarm under sep permit.Details
interior remodel of (e) 2/f condo unit. infill existing floor opening, add walls to make office. interior work only. sprinkler/fire alarm under sep permit. | $14,000 | |
| May 15, 2014 | Completed final sign-off Sep 2014 | 615 Peralta Av | Gil Construction & Assoc Inc. | remove and replace front beam per plans.Details
remove and replace front beam per plans. | $2,200 |
| May 1, 2014 | Completed final sign-off Oct 2014 | 176 Grattan St | M N Construction | kitchen remodel & removal of walls between kitchen, dining & living rooms.Details
kitchen remodel & removal of walls between kitchen, dining & living rooms. | $25,000 |
| Feb 4, 2008 | Completed final sign-off May 2008 | 1575 Burke Av | Mayta & Jensen | roof framing connection & street light pole foundation. (7) light pole foundation, relocation of 1 site light, dry rot repair at warehouse roof. str. pier foundation details provided. see delta 2.Details
roof framing connection & street light pole foundation. (7) light pole foundation, relocation of 1 site light, dry rot repair at warehouse roof. str. pier foundation details provided. see delta 2. | $20,000 |