Susan Aitken
- Listed as
- architect, engineer
- Firm
- Hamilton & Aitken Arch.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Jul 2026
41 permits since 2000 (architect on 40 permits, engineer on 1 permit): 27 completed, 6 in progress, 6 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 1504 Jerrold Av | revision to pa# 202107023732: construction of a 3' x 11' landing with fixed planters on the the public sidewalk side of the building entry. includes sidewalk demo.Details
revision to pa# 202107023732: construction of a 3' x 11' landing with fixed planters on the the public sidewalk side of the building entry. includes sidewalk demo. | $5,500 | |
| Feb 9, 2026 | In progress issued Feb 2026 | 1607 Howard St | Universe Alliance Inc Dba Universe Cons | 40 fl : revision to pa # 202405162245: changing locations of posts from the center stairway.Details
40 fl : revision to pa # 202405162245: changing locations of posts from the center stairway. | |
| Oct 3, 2025 | In progress issued Oct 2025 | 1607 Howard St | Universe Alliance Inc Dba Universe Cons | revision to 202405162245. revised foundations to span to avoid sewer. modify slope of flatwork to provide drainage away from foundation. clarify maximum riser at east stair.Details
revision to 202405162245. revised foundations to span to avoid sewer. modify slope of flatwork to provide drainage away from foundation. clarify maximum riser at east stair. | |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 1601 Howard St | Universe Painting Inc | repair exterior siding, add blocking and framing as needed. not visable from the street.Details
repair exterior siding, add blocking and framing as needed. not visable from the street. | $20,000 |
| Aug 1, 2024 | In progress issued Sep 2024 | 1504 Jerrold Av | Ever Grande Construction Inc | revision to pa # 2021-0702-3732 remove proposed fire sprinkler from scope from original projectDetails
revision to pa # 2021-0702-3732 remove proposed fire sprinkler from scope from original project | |
| May 16, 2024 | In progress issued Apr 2025 | 1607 Howard St | Universe Alliance Inc Dba Universe Cons | remove (e) winder stairs and porches at central and east lightwells. construct (n) wood stairs in w/straight runs, handrails on one side, guardrails on open sides. replace (e) back door at each of the apartments with soild core wood door and hardware. repair handrail at (e) stair at west lightwellDetails
remove (e) winder stairs and porches at central and east lightwells. construct (n) wood stairs in w/straight runs, handrails on one side, guardrails on open sides. replace (e) back door at each of the apartments with soild core wood door and hardware. repair handrail at (e) stair at west lightwell | $96,000 |
| Apr 25, 2024 | In progress filed Apr 2024, not yet issued | 222 Moncada Wy | renovation of an existing detached, unconditioned garage, including new exterior and interior finishes, new roof covering, new window and new doors in existing openings. in kind. demo (e) storage shed adjacent to (e) garage.Details
renovation of an existing detached, unconditioned garage, including new exterior and interior finishes, new roof covering, new window and new doors in existing openings. in kind. demo (e) storage shed adjacent to (e) garage. | $37,000 | |
| Mar 5, 2024 | Completed final sign-off Jan 2026 | 601 Van Ness Av | Mission Home Remodeling Inc | unit 804 8th floor - remodel kitchen and bathroom to include removal and replacing of bathroom walls, kitchen appliances, casework, fixtures and finishesDetails
unit 804 8th floor - remodel kitchen and bathroom to include removal and replacing of bathroom walls, kitchen appliances, casework, fixtures and finishes | $80,000 |
| Mar 5, 2024 | Completed final sign-off Jan 2026 | 601 Van Ness Av | Mission Home Remodeling Inc | unit 803 on 8th floor- remodel and relocate (e) kitchen within the same area. convert (e) kitchen space into a closetDetails
unit 803 on 8th floor- remodel and relocate (e) kitchen within the same area. convert (e) kitchen space into a closet | $30,000 |
| Apr 27, 2023 | Never finaled issued May 2023, no final | 15 Crescent Av | Angotti & Reilly Inc. | rev to pa# 202103096181; to comply w/ nov 202306896 replace the (e) 2nd fl. framing with new wood fl. framing between grid lines a&bDetails
rev to pa# 202103096181; to comply w/ nov 202306896 replace the (e) 2nd fl. framing with new wood fl. framing between grid lines a&b | $3,000 |
| Apr 10, 2023 | Completed final sign-off Oct 2024 | 15 Crescent Av | Angotti & Reilly Inc. | revision to bpa#202103096181-s1, repair/rebuild (e) wood framed property line wall w/new 1-hour rating assembly, repair/rebuild (e) concrete planter to match (e) planterDetails
revision to bpa#202103096181-s1, repair/rebuild (e) wood framed property line wall w/new 1-hour rating assembly, repair/rebuild (e) concrete planter to match (e) planter | $6,000 |
| Mar 22, 2023 | Never finaled issued Apr 2023, no final | 15 Crescent Av | Angotti & Reilly Inc. | revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings.Details
revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings. | $6,000 |
| Jun 2, 2022 | Completed final sign-off Dec 2025 | 1201 Church St | Skye's The Limit Construction | 1st flr - accessible ada compliant upgrades to (e) bathroom including expansion of space to allow for accessible clearances and addition of a storage room adjacent to accessible bathroom.Details
1st flr - accessible ada compliant upgrades to (e) bathroom including expansion of space to allow for accessible clearances and addition of a storage room adjacent to accessible bathroom. | $35,973 |
| Mar 31, 2022 | Never finaled filed Mar 2022, never issued | 3025 23rd St | interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system. domestic water heatersDetails
interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system. domestic water heaters | $746,583 | |
| Mar 23, 2022 | Never finaled filed Mar 2022, never issued | 3019 23rd St | interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system.Details
interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system. | $746,583 | |
| Mar 9, 2022 | Completed final sign-off May 2023 | 422 Valencia St | D & H Construction | exterior rehab, replace siding east elevation, (e) light wells. in kind window replacement, roof deck repair. dry rot &roof repair. interior rehab in-kind of all shared bath & toilet facilities, include accessibility upgrades & accessible restrooms. in kind rehab of all shared kitchens accessiblity.Details
exterior rehab, replace siding east elevation, (e) light wells. in kind window replacement, roof deck repair. dry rot &roof repair. interior rehab in-kind of all shared bath & toilet facilities, include accessibility upgrades & accessible restrooms. in kind rehab of all shared kitchens accessiblity. | $1,678,491 |
| Jul 2, 2021 | Never finaled issued Dec 2022, no final | 1504 Jerrold Av | Ever Grande Construction Inc | renovate 2-story home. add (n)3/f w/ (n)kit & bathrm. exterior finish replacement, re-grading (e)sidewalk at entry, rebuild (e)low rear yard. retaining wall, (n)rear yard flat-work, install solar roof system. structural work -full seismic upgrade for vert addition. mep.Details
renovate 2-story home. add (n)3/f w/ (n)kit & bathrm. exterior finish replacement, re-grading (e)sidewalk at entry, rebuild (e)low rear yard. retaining wall, (n)rear yard flat-work, install solar roof system. structural work -full seismic upgrade for vert addition. mep. | $618,210 |
| Mar 12, 2021 | Completed final sign-off Jan 2023 | 525 Brannan St | Field Construction Inc. | interior design of lobby at ground level of an office building. scope includes interior finishes and replacement of exterior door.Details
interior design of lobby at ground level of an office building. scope includes interior finishes and replacement of exterior door. | $50,000 |
| Dec 17, 2020 | Completed final sign-off Dec 2025 | 1201 Church St | Skye's The Limit Construction | to comply with accessible business entrance program per ord 51-16. accessible ada compliant upgrades to 3 commercial store entries, including installation of automatic door openers, door leafs, & re-grading of (e) sidewalk to conform with slope requirements at 2 entrances.Details
to comply with accessible business entrance program per ord 51-16. accessible ada compliant upgrades to 3 commercial store entries, including installation of automatic door openers, door leafs, & re-grading of (e) sidewalk to conform with slope requirements at 2 entrances. | $15,000 |
| Dec 3, 2020 | Completed final sign-off Aug 2021 | 480 Funston Av | A M C Builders Inc. | 3/f: renovation of kitchen & bathroom with electrical & mechanical work, window removal & replacement (non-street visible). r/r k&t wiring, replacement of fau in (e) garage with new mini-split heat pump system.Details
3/f: renovation of kitchen & bathroom with electrical & mechanical work, window removal & replacement (non-street visible). r/r k&t wiring, replacement of fau in (e) garage with new mini-split heat pump system. | $62,454 |
| May 26, 2020 | Completed final sign-off Mar 2021 | 222 Moncada Wy | Home Redomelers Design & Build Inc | revision to pa 201908280058. repair of (e) wood framing due to dry-rot and install concrete foundation under a one-story portion of the (e) home. (n) foundation will be similar to the new foundation work approved under prev applicationDetails
revision to pa 201908280058. repair of (e) wood framing due to dry-rot and install concrete foundation under a one-story portion of the (e) home. (n) foundation will be similar to the new foundation work approved under prev application | $11,534 |
| Mar 12, 2020 | Completed final sign-off Dec 2020 | 474 Valencia St | Flying Colors | revision to pa #2018-1012-3000: removes the notation indicating toilet clear space under the barrier removal scope, as well as adds an accessible bathroom stall and shows an existing janitor closet being removed.Details
revision to pa #2018-1012-3000: removes the notation indicating toilet clear space under the barrier removal scope, as well as adds an accessible bathroom stall and shows an existing janitor closet being removed. | $5,000 |
| Aug 28, 2019 | Completed final sign-off Mar 2021 | 222 Moncada Wy | Home Redomelers Design & Build Inc | demo and replace (e) wood basement wall & footins w/n concrete foundation wall & footing. replace (e) alum windows with n/wood french doors. demo in kind reconstruct of patio, patio stairs & retaining wall, and new built in bench and sitting wall. brick repair at frnt facade. int finish & casework.Details
demo and replace (e) wood basement wall & footins w/n concrete foundation wall & footing. replace (e) alum windows with n/wood french doors. demo in kind reconstruct of patio, patio stairs & retaining wall, and new built in bench and sitting wall. brick repair at frnt facade. int finish & casework. | $57,433 |
| Feb 16, 2017 | Never finaled filed Feb 2017, never issued | 3590 19th St | to comply with nov 201642701 to legalize office constructionDetails
to comply with nov 201642701 to legalize office construction | $10,000 | |
| Sep 16, 2016 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13Details
revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13 | |
| Apr 10, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | repairs to building envelope including roofing, shingle replacement, waterproffing, framing repair at dryrot. enengy improvments to heating and ventilation, furnaces and fan replacements. replacment of water heats, lighting, power, phone. replacement of finishes, flooring, cabinets. f/a under sep.Details
repairs to building envelope including roofing, shingle replacement, waterproffing, framing repair at dryrot. enengy improvments to heating and ventilation, furnaces and fan replacements. replacment of water heats, lighting, power, phone. replacement of finishes, flooring, cabinets. f/a under sep. | $7,500,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2018 | 210 Jones St | Gene Catania Construction | change ownership to (e) restaurant - cafe equipment & finishes update in 1st floor. alteration of kitchen partition & countertop, type 1 exhaust hood. n/a maher ordinanceDetails
change ownership to (e) restaurant - cafe equipment & finishes update in 1st floor. alteration of kitchen partition & countertop, type 1 exhaust hood. n/a maher ordinance | $137,000 |
| Oct 21, 2014 | Completed final sign-off May 2015 | 733 Kearny St | Chiang C M Construction Inc. | revision to ap #2013.1127.2982 - revisions include additional grade beam rebar, landscape wall layout, downspouts, access panel locations. n/a maher ordinanceDetails
revision to ap #2013.1127.2982 - revisions include additional grade beam rebar, landscape wall layout, downspouts, access panel locations. n/a maher ordinance | $5,000 |
| Nov 27, 2013 | Completed final sign-off May 2015 | 733 Kearny St | to erect 1 story, no basement, public restrooms.Details
to erect 1 story, no basement, public restrooms. | $650,000 | |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 733 Kearny St | demolish old restroom & build a new one. (corner of portsmouth square)Details
demolish old restroom & build a new one. (corner of portsmouth square) | $20,000 | |
| Jul 8, 2013 | Completed final sign-off Mar 2016 | 646 Dolores St | erect type 1, 1 story restroom.Details
erect type 1, 1 story restroom. | $800,000 | |
| Jul 8, 2013 | Completed final sign-off Nov 2015 | 598 Dolores St | bldg 2: erect type 1, 1 story restroom.Details
bldg 2: erect type 1, 1 story restroom. | $600,000 | |
| Jul 8, 2013 | Completed final sign-off Nov 2015 | 598 Dolores St | erect type 1, one story office .Details
erect type 1, one story office . | $600,000 | |
| Jul 3, 2013 | Expired or cancelled withdrawn May 2014 | 280 Gates St | new dormer and bathroom, extend 2nd floor over exist 1/f (enlarge bedroom) deck, remodel 1st floor kitchen/bath/laundry, replace selected windowsDetails
new dormer and bathroom, extend 2nd floor over exist 1/f (enlarge bedroom) deck, remodel 1st floor kitchen/bath/laundry, replace selected windows | $145,000 | |
| Nov 23, 2010 | Completed final sign-off Feb 2012 | 216 Eddy St | Ncr Construction Inc | complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair.Details
complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair. | $29,900 |
| Jan 27, 2010 | Completed final sign-off Sep 2010 | 1617 Howard St | Ncr Construction Inc | replace existing common exterior stair with new stair. work at 1617 howardDetails
replace existing common exterior stair with new stair. work at 1617 howard | $70,000 |
| Apr 18, 2007 | Completed final sign-off May 2007 | 179 Hernandez Av | Kevin Sullivan Construction Inc. | rebuild front stair, smaller, move it away from driveway. prior bldg. appl#200511047428, prior permit sidewalk 061e-0418. sidewalk permit/driveway work & street space under previous permit.Details
rebuild front stair, smaller, move it away from driveway. prior bldg. appl#200511047428, prior permit sidewalk 061e-0418. sidewalk permit/driveway work & street space under previous permit. | $8,000 |
| Aug 22, 2006 | Expired or cancelled withdrawn Sep 2006 | 255 Henry St | remodel of rear garden stucture. raise part of roof. no habitable space.Details
remodel of rear garden stucture. raise part of roof. no habitable space. | $20,000 | |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 325 Howth St | excavater 8x17 area in ground floor for use as bath & laundry area area presently lalnundry area of no wwalkDetails
excavater 8x17 area in ground floor for use as bath & laundry area area presently lalnundry area of no wwalk | $2,500 | |
| May 16, 2006 | Completed final sign-off Aug 2007 | 255 Henry St | reframe roof, re-roof, add skylight, build interior stair, build powder room/plumbing. paint, repair siding, replace window.Details
reframe roof, re-roof, add skylight, build interior stair, build powder room/plumbing. paint, repair siding, replace window. | $25,000 | |
| Feb 8, 2005 | Completed final sign-off Oct 2005 | 940 Grove St | Spacesaver Designs Inc. | concrete walkway, replace some exterior sewer pipe. replace wood retaining wall, handrails,Details
concrete walkway, replace some exterior sewer pipe. replace wood retaining wall, handrails, | $35,000 |