Block 4265, lot 026
1227 Hampshire St
- City’s use
- Multi-Family Residential
- Built
- 1978
- Stories
- 3
- Units
- 50
- Rooms
- 50 bathrooms
- Building
- 60,404 sq ft
- Lot
- 39,500 sq ft
- Zoning
- RM3/C2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2018 | Completed final sign-off Jan 2019 | 1227 Hampshire St | Sun Wu Liu Dba Golden Wu Construction In | unit 41: comply with nov 201801661. repair damaged bedroom ceiling, modling and lighting.Details
unit 41: comply with nov 201801661. repair damaged bedroom ceiling, modling and lighting. | $500 |
| Sep 16, 2016 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13Details
revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13 | |
| Jun 6, 2016 | Never finaled issued Jun 2016, no final | 1200 Potrero Av | street spaceDetails
street space | ||
| Jun 1, 2016 | Never finaled issued Jun 2016, no final | 1227 Hampshire St | street spaceDetails
street space | ||
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 1200 Potrero Av | street spaceDetails
street space | ||
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 1227 Hampshire St | Intrepid Electronic Systems Inc | (n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits.Details
(n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits. | $100,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 1200 Potrero Av | street spaceDetails
street space | ||
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 1227 Hampshire St | street space & sidewalkDetails
street space & sidewalk | ||
| Oct 5, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | revision to app#201504214149. soft story seismic retrofit at garage/parking. n/a for maher.Details
revision to app#201504214149. soft story seismic retrofit at garage/parking. n/a for maher. | |
| Apr 21, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | soft story retrofit and wall repair. asce 41-06. n/a for the maher.Details
soft story retrofit and wall repair. asce 41-06. n/a for the maher. | $200,000 |
| Apr 10, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | repairs to building envelope including roofing, shingle replacement, waterproffing, framing repair at dryrot. enengy improvments to heating and ventilation, furnaces and fan replacements. replacment of water heats, lighting, power, phone. replacement of finishes, flooring, cabinets. f/a under sep.Details
repairs to building envelope including roofing, shingle replacement, waterproffing, framing repair at dryrot. enengy improvments to heating and ventilation, furnaces and fan replacements. replacment of water heats, lighting, power, phone. replacement of finishes, flooring, cabinets. f/a under sep. | $7,500,000 |
| Feb 27, 2013 | Never finaled issued Feb 2013, no final | 1227 Hampshire St | Maap Corp Dba Save Energy Co | replace 28 aluminum patio door & 3 windows in-kind with white vinyl - u.4 max. not visible from streetDetails
replace 28 aluminum patio door & 3 windows in-kind with white vinyl - u.4 max. not visible from street | $36,000 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 1227 Hampshire St | Maap Corp Dba Save Energy Co | replace 284 windows in kind, 96 visable from street, no structural changes, max u factor 0.4. aluminum to vinyl frame.Details
replace 284 windows in kind, 96 visable from street, no structural changes, max u factor 0.4. aluminum to vinyl frame. | $104,000 |
| Jul 27, 2010 | Completed final sign-off Mar 2012 | 1200 Potrero Av | remove general advertising sign #2742 12'x25' north facing per dcp nov 10785.Details
remove general advertising sign #2742 12'x25' north facing per dcp nov 10785. | $1,500 | |
| Nov 27, 2006 | Never finaled issued Nov 2006, no final | 1200 Potrero Av | street space & sidewalkDetails
street space & sidewalk | ||
| Jul 27, 2005 | Completed final sign-off Aug 2005 | 1227 Hampshire St | Zebra Awning Co Inc | sign permit - painted lettering onto awning .Details
sign permit - painted lettering onto awning . | |
| Jul 27, 2005 | Completed final sign-off Aug 2005 | 1227 Hampshire St | Zebra Awning Co Inc | fabricate &install 1 new convex style awning w/graphics on frt.awning will cover exist wood overheadDetails
fabricate &install 1 new convex style awning w/graphics on frt.awning will cover exist wood overhead | $900 |
| Feb 11, 2003 | Never finaled issued Feb 2003, no final | 1200 Potrero Av | sidewalkDetails
sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (4), Maap Corp Dba Save Energy Co (2), Zebra Awning Co Inc (2), Intrepid Electronic Systems Inc, Sun Wu Liu Dba Golden Wu Construction In
- Architects
- Susan Aitken (2)
- Engineers
- Alex Rood (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.