Sun Wu Liu Dba Golden Wu Construction In
- Based in
- Daly City
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 53 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2025 | Completed final sign-off Jan 2025 | 330 Hamilton St | apt# 2 & 3: a) repair the wall behind the original rain gutters. b) use iron corner sheaths to build and paste on the wall behind the original rain gutters.Details
apt# 2 & 3: a) repair the wall behind the original rain gutters. b) use iron corner sheaths to build and paste on the wall behind the original rain gutters. | $500 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 330 Hamilton St | apt 2 & 3 remove stucco 100sq ft the back wall.revision to 202405283112Details
apt 2 & 3 remove stucco 100sq ft the back wall.revision to 202405283112 | $1,000 |
| May 28, 2024 | Completed final sign-off Sep 2024 | 330 Hamilton St | apt 2 & apt 3: remove stucco and siding (around window)from the back wall of these two units. change 36x96 window for apt 2 bedroom window. not facing street. u=.30maxDetails
apt 2 & apt 3: remove stucco and siding (around window)from the back wall of these two units. change 36x96 window for apt 2 bedroom window. not facing street. u=.30max | $3,500 |
| Mar 11, 2024 | Completed final sign-off May 2024 | 445 35th Av | to comply with nov: 202316726 items# 5& 6. 1. repair stairs @ lightwell less than 50% and 2. remove roodf access wooden utlity ladder.Details
to comply with nov: 202316726 items# 5& 6. 1. repair stairs @ lightwell less than 50% and 2. remove roodf access wooden utlity ladder. | $500 |
| Nov 22, 2021 | Completed final sign-off Dec 2022 | 1878 24th Av | revision to approved permit 202106283352 to revise bathrooms dimension at 2nd floor per plan.Details
revision to approved permit 202106283352 to revise bathrooms dimension at 2nd floor per plan. | |
| Jun 28, 2021 | Completed final sign-off Dec 2022 | 1878 24th Av | revision to pa 2020-1106-8402 to reconfigure bathroom layout and add 3 new skylights at 2nd floorDetails
revision to pa 2020-1106-8402 to reconfigure bathroom layout and add 3 new skylights at 2nd floor | $10,000 |
| Jun 1, 2021 | Completed final sign-off Aug 2021 | 4543 Lincoln Wy | unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings.Details
unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings. | $9,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishesDetails
to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishes | $83,000 |
| Nov 6, 2020 | Completed final sign-off Dec 2022 | 1878 24th Av | 2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl.Details
2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl. | $39,000 |
| Oct 30, 2020 | Completed final sign-off Feb 2021 | 1743 San Jose Av | bathroom remodel: change lights, toilet, sink, bath tub, tile.Details
bathroom remodel: change lights, toilet, sink, bath tub, tile. | $5,000 |
| Oct 5, 2020 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | revision to approved permit: 2018-0910-9504 and 2019-0925-2664-existing window at laundry to remain-change door to sliding door-shift stair toward yard per planDetails
revision to approved permit: 2018-0910-9504 and 2019-0925-2664-existing window at laundry to remain-change door to sliding door-shift stair toward yard per plan | $1,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 1454 20th Av | remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit.Details
remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit. | $50,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2022 | 1878 24th Av | 1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14.Details
1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14. | $50,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | revision to bpa# 2018-0910-9504; at basement level. remove (e) concrete slab and lower ceiling from 7'-4" to 7'-8", consgtruct new bedroom, stucy and relocate laundry and bathroom.Details
revision to bpa# 2018-0910-9504; at basement level. remove (e) concrete slab and lower ceiling from 7'-4" to 7'-8", consgtruct new bedroom, stucy and relocate laundry and bathroom. | $40,000 |
| Sep 13, 2019 | Completed final sign-off Aug 2021 | 165 Laura St | comply w/ n.o.v 201937521. remove rooms at garage and restore to previous legal condition. remove bathtub, walls, doorsDetails
comply w/ n.o.v 201937521. remove rooms at garage and restore to previous legal condition. remove bathtub, walls, doors | $500 |
| Apr 26, 2019 | Completed final sign-off Jun 2019 | 184 London St | to comply with complaint 201643183. install 6ft high fence 7 gate with 75% opening at front yard. replace (3) windows in-kind at front with aluminium clad wood.Details
to comply with complaint 201643183. install 6ft high fence 7 gate with 75% opening at front yard. replace (3) windows in-kind at front with aluminium clad wood. | $3,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2020 | 543 40th Av | kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door.Details
kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door. | $8,000 |
| Dec 28, 2018 | Completed final sign-off Jan 2019 | 1227 Hampshire St | unit 41: comply with nov 201801661. repair damaged bedroom ceiling, modling and lighting.Details
unit 41: comply with nov 201801661. repair damaged bedroom ceiling, modling and lighting. | $500 |
| Sep 10, 2018 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry.Details
basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry. | $89,000 |
| Aug 31, 2018 | Completed final sign-off Feb 2019 | 2458 40th Av | construct 1 level wood deck from 2nd flr. demo window and patch wall at (e) windowDetails
construct 1 level wood deck from 2nd flr. demo window and patch wall at (e) window | $13,000 |
| Oct 23, 2017 | Completed final sign-off Dec 2019 | 279 Niagara Av | excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard.Details
excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard. | $90,000 |
| Jun 9, 2016 | Completed final sign-off Feb 2017 | 184 London St | replace partial foundation on lower floor per plan.Details
replace partial foundation on lower floor per plan. | $5,000 |
| Mar 16, 2016 | Completed final sign-off Jul 2017 | 182 London St | legalize as built unit on lower floor per plan. ordinance 43-14.Details
legalize as built unit on lower floor per plan. ordinance 43-14. | $20,000 |
| Mar 7, 2016 | Completed final sign-off Feb 2017 | 184 London St | repair siding (not visible from the street), less than 30%Details
repair siding (not visible from the street), less than 30% | $2,500 |
| Dec 23, 2015 | Never finaled issued Jan 2016, no final | 229 Tara St | 1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard.Details
1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard. | $50,000 |
| Sep 18, 2015 | Completed final sign-off Apr 2016 | 6521 California St | to comply w/his nov #201030163 dated 1/5/2010 - convert & remove ground floor kitchen back to permitted playroom. (e) area under (e) porch to be verify in field. no change to upper floor. ref #200404131104 & 200405113514.Details
to comply w/his nov #201030163 dated 1/5/2010 - convert & remove ground floor kitchen back to permitted playroom. (e) area under (e) porch to be verify in field. no change to upper floor. ref #200404131104 & 200405113514. | $1,500 |
| Sep 11, 2015 | Completed final sign-off Sep 2015 | 143 Waverly Pl | to comply with nov # 201564801. item #6. the 4th floor of the toilet room installed 2 grab bars and shower room one grab bar. the 3rd floor of the toilet room installed 2 grab bars and shower room one grab bar.Details
to comply with nov # 201564801. item #6. the 4th floor of the toilet room installed 2 grab bars and shower room one grab bar. the 3rd floor of the toilet room installed 2 grab bars and shower room one grab bar. | $300 |
| Jun 17, 2015 | Completed final sign-off Nov 2015 | 460 Brussels St | add one bedroom & two bathrooms on 1st floor per plan. add lighting fixtures on 1st floor per plan.Details
add one bedroom & two bathrooms on 1st floor per plan. add lighting fixtures on 1st floor per plan. | $30,000 |
| May 18, 2015 | Completed final sign-off Aug 2015 | 2747 Polk St | unit a - kitchen remdol - change sink faucet. countertoip, cabinets; toilket room remodel - change toilet tiles paint. shower room remodel - chang tiles paint. to comply with cec150.0(k)3 & 5Details
unit a - kitchen remdol - change sink faucet. countertoip, cabinets; toilket room remodel - change toilet tiles paint. shower room remodel - chang tiles paint. to comply with cec150.0(k)3 & 5 | $8,000 |
| Mar 17, 2015 | Completed final sign-off Feb 2019 | 2458 40th Av | comply with nov# 200005872. 2-story rear extension to the (e) single family house, with 1 play room, 1 bedroom, 1 full bathroom on ground floor, and 1 study, 1 bedroom, 1 full bathroom on upper floor.Details
comply with nov# 200005872. 2-story rear extension to the (e) single family house, with 1 play room, 1 bedroom, 1 full bathroom on ground floor, and 1 study, 1 bedroom, 1 full bathroom on upper floor. | $150,000 |
| Feb 12, 2015 | Completed final sign-off Mar 2015 | 2127 34th Av | revision to app#201501206039 shift location of door and window.Details
revision to app#201501206039 shift location of door and window. | |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 2127 34th Av | at ground floor lobby, construct a non-bearing wall with door and windows.Details
at ground floor lobby, construct a non-bearing wall with door and windows. | $500 |
| Jan 6, 2015 | Completed final sign-off Nov 2015 | 1042 Montgomery St | to comply with nov # 201405391. revision to previous plan app# 2013.0114.7913 replace (e) mezzanine. relocate spiral stair and resize windows per plan.Details
to comply with nov # 201405391. revision to previous plan app# 2013.0114.7913 replace (e) mezzanine. relocate spiral stair and resize windows per plan. | $20,000 |
| Nov 13, 2014 | Completed final sign-off Dec 2014 | 1463 Valencia St | kitchen ceiling repair approx. 2'-0" x 2'-0", replace back with 5/8" type x gypsum board and finish to match existing.Details
kitchen ceiling repair approx. 2'-0" x 2'-0", replace back with 5/8" type x gypsum board and finish to match existing. | $90 |
| Sep 12, 2014 | Completed final sign-off Nov 2014 | 1457 Valencia St | comply w/nov #201485063,201485062,& 201485071 - repair existing front deteroirated stairs, size, material & profile match (e) & reuse all material if applicable in kind. n/a maher ordinanceDetails
comply w/nov #201485063,201485062,& 201485071 - repair existing front deteroirated stairs, size, material & profile match (e) & reuse all material if applicable in kind. n/a maher ordinance | $2,000 |
| Jul 10, 2014 | Completed final sign-off Nov 2014 | 22 Arleta Av | 1)remodel kitchen and add one bath on 3rd floor per plan.Details
1)remodel kitchen and add one bath on 3rd floor per plan. | $20,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 59 Annapolis Tr | remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors.Details
remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors. | $8,000 |
| May 13, 2014 | Completed final sign-off Nov 2014 | 22 Arleta Av | bathroom remodeling:change bathtub, toilet, wash sink, floor tiles and switches.Details
bathroom remodeling:change bathtub, toilet, wash sink, floor tiles and switches. | $9,037 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 1471 Jackson St | unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13Details
unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13 | $8,000 |
| Jul 23, 2013 | Completed final sign-off Jan 2014 | 219 Prague St | comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircaseDetails
comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircase | $500 |
| Jun 18, 2013 | Completed final sign-off Sep 2013 | 166 Scotia Av | legalize family room, study room & a bathroom downstair on ground floor.Details
legalize family room, study room & a bathroom downstair on ground floor. | $30,000 |
| Jan 14, 2013 | Completed final sign-off Oct 2015 | 1042 Montgomery St | add 2 powder rooms, utility room and repair interior walls at storage area at basementDetails
add 2 powder rooms, utility room and repair interior walls at storage area at basement | $28,000 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 1926 45th Av | remove and replace stucco at entire frontDetails
remove and replace stucco at entire front | $3,500 |
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 278 Chester Av | remodel kitchen. change cabinets, sink, floor tile, granite coutner tops. all new lighting must comply with cec 150 k 8. no strucutral workDetails
remodel kitchen. change cabinets, sink, floor tile, granite coutner tops. all new lighting must comply with cec 150 k 8. no strucutral work | $5,000 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 601 Randolph St | add living space at (e) ground/garage floor incl. new fam.rm, study rm and a full bathrm. relocate w/d, sink in grg. new furnace and w/h in garageDetails
add living space at (e) ground/garage floor incl. new fam.rm, study rm and a full bathrm. relocate w/d, sink in grg. new furnace and w/h in garage | $30,000 |
| May 24, 2010 | Completed final sign-off May 2010 | 4349 18th St | revision to pa 201001044129 (unit 4351); remove toilet room remodel and electrical work in toilet room from scope of permitDetails
revision to pa 201001044129 (unit 4351); remove toilet room remodel and electrical work in toilet room from scope of permit | |
| May 5, 2010 | Completed final sign-off Jul 2010 | 545 Randolph St | interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor.Details
interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor. | $30,000 |
| Jan 4, 2010 | Completed final sign-off May 2010 | 4349 18th St | 4351 only:1)add furnace. 2)toilet room remodel.change one lights and one switches.Details
4351 only:1)add furnace. 2)toilet room remodel.change one lights and one switches. | $5,000 |
| May 4, 2009 | Completed final sign-off Oct 2009 | 2022 34th Av | to add one family room, one full bathroom & one storage on existing ground floor.Details
to add one family room, one full bathroom & one storage on existing ground floor. | $20,000 |
| Mar 4, 2009 | Completed final sign-off Sep 2009 | 819 44th Av | second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind.Details
second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind. | $40,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 1271 33rd Av | kitchen remodel in unit 1273 only. kitchen renovation: cabinets, sink, countertop, electrical outlet. no structural work. walls to remain in place. 2 furnace replacement in same location for both units.Details
kitchen remodel in unit 1273 only. kitchen renovation: cabinets, sink, countertop, electrical outlet. no structural work. walls to remain in place. 2 furnace replacement in same location for both units. | $8,000 |
| Jun 16, 2008 | Completed final sign-off Nov 2008 | 457 Monterey Bl | legalize 1/2 bath at the rear of garage #1. install washer and dryer in garages 1 and 2 per plan. create a storage room at rear of garage #2. revise pa 200608290890.Details
legalize 1/2 bath at the rear of garage #1. install washer and dryer in garages 1 and 2 per plan. create a storage room at rear of garage #2. revise pa 200608290890. | $2,000 |
| Jun 10, 2008 | Completed final sign-off Sep 2008 | 158 Boutwell St | interior ground floor addition --convert a portion of ex. garage into 1 bedroom, study, bathroom and storage.Details
interior ground floor addition --convert a portion of ex. garage into 1 bedroom, study, bathroom and storage. | $12,000 |
| Oct 12, 2007 | Never finaled issued Oct 2007, no final | 164 Mount Vernon Av | renew 200610316444 for final inspectionDetails
renew 200610316444 for final inspection | $5,000 |
| Apr 24, 2007 | Completed final sign-off Oct 2007 | 164 Mount Vernon Av | revision of appl#200610316444 repair dry rotten conc. foundation at the rear (bedroom & study room). reinforce foudnaion at the right size of the bedroom at the g/f, rearrange storage room and laundry area. relocate (e) furnace & (e) water heater.Details
revision of appl#200610316444 repair dry rotten conc. foundation at the rear (bedroom & study room). reinforce foudnaion at the right size of the bedroom at the g/f, rearrange storage room and laundry area. relocate (e) furnace & (e) water heater. | $3,000 |
| Dec 28, 2006 | Completed final sign-off Jun 2007 | 1515 25th Av | convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building.Details
convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building. | $25,000 |