Back to bathroom remodel contractors
Sun Wu Liu Dba Golden Wu Construction In
- Based in
- Daly City
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 53 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 25 completed, 2 never finaled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2021 | Completed final sign-off Dec 2022 | 1878 24th Av | revision to approved permit 202106283352 to revise bathrooms dimension at 2nd floor per plan.Details
revision to approved permit 202106283352 to revise bathrooms dimension at 2nd floor per plan. | |
| Jun 28, 2021 | Completed final sign-off Dec 2022 | 1878 24th Av | revision to pa 2020-1106-8402 to reconfigure bathroom layout and add 3 new skylights at 2nd floorDetails
revision to pa 2020-1106-8402 to reconfigure bathroom layout and add 3 new skylights at 2nd floor | $10,000 |
| Jun 1, 2021 | Completed final sign-off Aug 2021 | 4543 Lincoln Wy | unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings.Details
unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings. | $9,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishesDetails
to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishes | $83,000 |
| Nov 6, 2020 | Completed final sign-off Dec 2022 | 1878 24th Av | 2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl.Details
2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl. | $39,000 |
| Oct 30, 2020 | Completed final sign-off Feb 2021 | 1743 San Jose Av | bathroom remodel: change lights, toilet, sink, bath tub, tile.Details
bathroom remodel: change lights, toilet, sink, bath tub, tile. | $5,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 1454 20th Av | remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit.Details
remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit. | $50,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2022 | 1878 24th Av | 1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14.Details
1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14. | $50,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | revision to bpa# 2018-0910-9504; at basement level. remove (e) concrete slab and lower ceiling from 7'-4" to 7'-8", consgtruct new bedroom, stucy and relocate laundry and bathroom.Details
revision to bpa# 2018-0910-9504; at basement level. remove (e) concrete slab and lower ceiling from 7'-4" to 7'-8", consgtruct new bedroom, stucy and relocate laundry and bathroom. | $40,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2020 | 543 40th Av | kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door.Details
kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door. | $8,000 |
| Sep 10, 2018 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry.Details
basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry. | $89,000 |
| Oct 23, 2017 | Completed final sign-off Dec 2019 | 279 Niagara Av | excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard.Details
excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard. | $90,000 |
| Dec 23, 2015 | Never finaled issued Jan 2016, no final | 229 Tara St | 1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard.Details
1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard. | $50,000 |
| Jun 17, 2015 | Completed final sign-off Nov 2015 | 460 Brussels St | add one bedroom & two bathrooms on 1st floor per plan. add lighting fixtures on 1st floor per plan.Details
add one bedroom & two bathrooms on 1st floor per plan. add lighting fixtures on 1st floor per plan. | $30,000 |
| Mar 17, 2015 | Completed final sign-off Feb 2019 | 2458 40th Av | comply with nov# 200005872. 2-story rear extension to the (e) single family house, with 1 play room, 1 bedroom, 1 full bathroom on ground floor, and 1 study, 1 bedroom, 1 full bathroom on upper floor.Details
comply with nov# 200005872. 2-story rear extension to the (e) single family house, with 1 play room, 1 bedroom, 1 full bathroom on ground floor, and 1 study, 1 bedroom, 1 full bathroom on upper floor. | $150,000 |
| Jul 10, 2014 | Completed final sign-off Nov 2014 | 22 Arleta Av | 1)remodel kitchen and add one bath on 3rd floor per plan.Details
1)remodel kitchen and add one bath on 3rd floor per plan. | $20,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 59 Annapolis Tr | remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors.Details
remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors. | $8,000 |
| May 13, 2014 | Completed final sign-off Nov 2014 | 22 Arleta Av | bathroom remodeling:change bathtub, toilet, wash sink, floor tiles and switches.Details
bathroom remodeling:change bathtub, toilet, wash sink, floor tiles and switches. | $9,037 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 1471 Jackson St | unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13Details
unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13 | $8,000 |
| Jul 23, 2013 | Completed final sign-off Jan 2014 | 219 Prague St | comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircaseDetails
comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircase | $500 |
| Jun 18, 2013 | Completed final sign-off Sep 2013 | 166 Scotia Av | legalize family room, study room & a bathroom downstair on ground floor.Details
legalize family room, study room & a bathroom downstair on ground floor. | $30,000 |
| May 5, 2010 | Completed final sign-off Jul 2010 | 545 Randolph St | interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor.Details
interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor. | $30,000 |
| May 4, 2009 | Completed final sign-off Oct 2009 | 2022 34th Av | to add one family room, one full bathroom & one storage on existing ground floor.Details
to add one family room, one full bathroom & one storage on existing ground floor. | $20,000 |
| Mar 4, 2009 | Completed final sign-off Sep 2009 | 819 44th Av | second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind.Details
second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind. | $40,000 |
| Jun 16, 2008 | Completed final sign-off Nov 2008 | 457 Monterey Bl | legalize 1/2 bath at the rear of garage #1. install washer and dryer in garages 1 and 2 per plan. create a storage room at rear of garage #2. revise pa 200608290890.Details
legalize 1/2 bath at the rear of garage #1. install washer and dryer in garages 1 and 2 per plan. create a storage room at rear of garage #2. revise pa 200608290890. | $2,000 |
| Jun 10, 2008 | Completed final sign-off Sep 2008 | 158 Boutwell St | interior ground floor addition --convert a portion of ex. garage into 1 bedroom, study, bathroom and storage.Details
interior ground floor addition --convert a portion of ex. garage into 1 bedroom, study, bathroom and storage. | $12,000 |
| Dec 28, 2006 | Completed final sign-off Jun 2007 | 1515 25th Av | convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building.Details
convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building. | $25,000 |