Sun Wu Liu Dba Golden Wu Construction In
- Based in
- Daly City
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 53 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 15 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2024 | Completed final sign-off May 2024 | 445 35th Av | to comply with nov: 202316726 items# 5& 6. 1. repair stairs @ lightwell less than 50% and 2. remove roodf access wooden utlity ladder.Details
to comply with nov: 202316726 items# 5& 6. 1. repair stairs @ lightwell less than 50% and 2. remove roodf access wooden utlity ladder. | $500 |
| Oct 5, 2020 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | revision to approved permit: 2018-0910-9504 and 2019-0925-2664-existing window at laundry to remain-change door to sliding door-shift stair toward yard per planDetails
revision to approved permit: 2018-0910-9504 and 2019-0925-2664-existing window at laundry to remain-change door to sliding door-shift stair toward yard per plan | $1,000 |
| Sep 10, 2018 | Completed final sign-off Sep 2021 | 260 Santa Clara Av | basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry.Details
basement - (n) bathroom; (n) opening from basement to yard. 1st fl - expand (e) deck, & new stair; 2nd fl - modify (e) bathroom & laundry. | $89,000 |
| Oct 23, 2017 | Completed final sign-off Dec 2019 | 279 Niagara Av | excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard.Details
excavation @ 1st floor to provide 8' ceiling height in new study, guest bedroom & bath @ 1st floor. new interior stair. new sliding glass door, 2 new egress windows, new skylight, new conc retaining walls, planters, patio & area drain proposed for the rear yard. | $90,000 |
| Dec 23, 2015 | Never finaled issued Jan 2016, no final | 229 Tara St | 1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard.Details
1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard. | $50,000 |
| Jan 6, 2015 | Completed final sign-off Nov 2015 | 1042 Montgomery St | to comply with nov # 201405391. revision to previous plan app# 2013.0114.7913 replace (e) mezzanine. relocate spiral stair and resize windows per plan.Details
to comply with nov # 201405391. revision to previous plan app# 2013.0114.7913 replace (e) mezzanine. relocate spiral stair and resize windows per plan. | $20,000 |
| Sep 12, 2014 | Completed final sign-off Nov 2014 | 1457 Valencia St | comply w/nov #201485063,201485062,& 201485071 - repair existing front deteroirated stairs, size, material & profile match (e) & reuse all material if applicable in kind. n/a maher ordinanceDetails
comply w/nov #201485063,201485062,& 201485071 - repair existing front deteroirated stairs, size, material & profile match (e) & reuse all material if applicable in kind. n/a maher ordinance | $2,000 |
| Jul 23, 2013 | Completed final sign-off Jan 2014 | 219 Prague St | comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircaseDetails
comply with nov 201307501. legalize e skylights at hallway and bathroom on 2nd fl. remove illegal window at bathroom on 2nd fl. remove illegal structure framing at entrance lightwell. return bac to open staircase | $500 |
| Dec 28, 2006 | Completed final sign-off Jun 2007 | 1515 25th Av | convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building.Details
convert rear part of garage into bedroom / bathroom & storage. add interier stairway to 2 floor, new franch door & 2 windows, new furnaces & tankless water heater with interior connecting stairs. no other exterior changes. replace franch door in the rear of the building. | $25,000 |