Back to kitchen remodel contractors
Sun Wu Liu Dba Golden Wu Construction In
- Based in
- Daly City
- On San Francisco permits
- Dec 2006 to Jan 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 53 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 2 never finaled. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2021 | Completed final sign-off Aug 2021 | 4543 Lincoln Wy | unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings.Details
unit 4: kitchen remodel. replace sink, faucet, countertop cabinets. 2 bathroom remodeling replace sink toilet, shower room. no change to layout of walls and openings. | $9,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishesDetails
to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishes | $83,000 |
| Nov 6, 2020 | Completed final sign-off Dec 2022 | 1878 24th Av | 2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl.Details
2nd fl add another bathroom with toilet, sink & shower. remodel/alterating kitchen on 2nd fl. infill lightwell on 2nd fl. | $39,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 1454 20th Av | remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit.Details
remodel kitchen & 4 full bathrooms with all new fixtures & finish. call for building inspection upon issuance of this permit. | $50,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2022 | 1878 24th Av | 1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14.Details
1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14. | $50,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2020 | 543 40th Av | kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door.Details
kitchen remodeling: change sink, faucet, counter top, cabinets. install the new island. all new lightss. led. bathroom remodeling: change sink, toilet, shower room. remodeling living room & two bedrooms. change sheetrock and ceiling lights. no alteration of wall, window and door. | $8,000 |
| Dec 23, 2015 | Never finaled issued Jan 2016, no final | 229 Tara St | 1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard.Details
1st fl:convert (e) spaces to have a bedroom, family room, full bath. 2nd fl: remodel (e) kitchen, full bath, stair down to backyard. | $50,000 |
| Sep 18, 2015 | Completed final sign-off Apr 2016 | 6521 California St | to comply w/his nov #201030163 dated 1/5/2010 - convert & remove ground floor kitchen back to permitted playroom. (e) area under (e) porch to be verify in field. no change to upper floor. ref #200404131104 & 200405113514.Details
to comply w/his nov #201030163 dated 1/5/2010 - convert & remove ground floor kitchen back to permitted playroom. (e) area under (e) porch to be verify in field. no change to upper floor. ref #200404131104 & 200405113514. | $1,500 |
| May 18, 2015 | Completed final sign-off Aug 2015 | 2747 Polk St | unit a - kitchen remdol - change sink faucet. countertoip, cabinets; toilket room remodel - change toilet tiles paint. shower room remodel - chang tiles paint. to comply with cec150.0(k)3 & 5Details
unit a - kitchen remdol - change sink faucet. countertoip, cabinets; toilket room remodel - change toilet tiles paint. shower room remodel - chang tiles paint. to comply with cec150.0(k)3 & 5 | $8,000 |
| Nov 13, 2014 | Completed final sign-off Dec 2014 | 1463 Valencia St | kitchen ceiling repair approx. 2'-0" x 2'-0", replace back with 5/8" type x gypsum board and finish to match existing.Details
kitchen ceiling repair approx. 2'-0" x 2'-0", replace back with 5/8" type x gypsum board and finish to match existing. | $90 |
| Jul 10, 2014 | Completed final sign-off Nov 2014 | 22 Arleta Av | 1)remodel kitchen and add one bath on 3rd floor per plan.Details
1)remodel kitchen and add one bath on 3rd floor per plan. | $20,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 59 Annapolis Tr | remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors.Details
remodel kitchen: change cabinets, sink, countertops, floor tiles. remodel bathroom: change sink, toilet, floor and wall tiles. kitchen lighting, 50% high efficacy. bathroom: provide occupancy sensors. | $8,000 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 1471 Jackson St | unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13Details
unit 5: kitchen and bathroom remodeling. kitchen: replace cabinets and counter top and floor tile. bath: repalce (e) bathtub,toilet and floor tile. install sensor for lighting. n/a maher ordinance # 155-13 | $8,000 |
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 278 Chester Av | remodel kitchen. change cabinets, sink, floor tile, granite coutner tops. all new lighting must comply with cec 150 k 8. no strucutral workDetails
remodel kitchen. change cabinets, sink, floor tile, granite coutner tops. all new lighting must comply with cec 150 k 8. no strucutral work | $5,000 |
| Mar 4, 2009 | Completed final sign-off Sep 2009 | 819 44th Av | second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind.Details
second floor remodel 2 1/2 bathroom and 1 kitchen. remodel in kind. | $40,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 1271 33rd Av | kitchen remodel in unit 1273 only. kitchen renovation: cabinets, sink, countertop, electrical outlet. no structural work. walls to remain in place. 2 furnace replacement in same location for both units.Details
kitchen remodel in unit 1273 only. kitchen renovation: cabinets, sink, countertop, electrical outlet. no structural work. walls to remain in place. 2 furnace replacement in same location for both units. | $8,000 |