Block 7035, lot 017
325 Howth St
- City’s use
- Single Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,736 sq ft
- Lot
- 3,876 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2023 | Completed final sign-off Nov 2023 | 325 Howth St | Bradshaw Roofing Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,000 |
| Jun 13, 2016 | Completed final sign-off Jun 2017 | 325 Howth St | partial conversion of unconditioned attic space into 2nd floor bedroom and bath with electrical work. a new stair will also be constructed along with structural upgrades. exterior work. replacement of an extg fixed window with casement window. relocation of an extg basement access door.Details
partial conversion of unconditioned attic space into 2nd floor bedroom and bath with electrical work. a new stair will also be constructed along with structural upgrades. exterior work. replacement of an extg fixed window with casement window. relocation of an extg basement access door. | $90,000 | |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 325 Howth St | street space and sidewak repairDetails
street space and sidewak repair | ||
| Jul 25, 2014 | Completed final sign-off Oct 2014 | 325 Howth St | American Construction | bathroom remodel, installnew shower/tub valve, new tile on flooring & shower wall. install new fan gfi outlet & switch & light in fan. frame door open 28" between bedroom & bath into wall space.Details
bathroom remodel, installnew shower/tub valve, new tile on flooring & shower wall. install new fan gfi outlet & switch & light in fan. frame door open 28" between bedroom & bath into wall space. | $10,000 |
| Apr 30, 2014 | Completed final sign-off Jun 2017 | 325 Howth St | All Window & Door | six bay windows visable from the street replace windows with wood hung within existing openings. u-factor .4Details
six bay windows visable from the street replace windows with wood hung within existing openings. u-factor .4 | $4,700 |
| Apr 30, 2014 | Completed final sign-off Jun 2017 | 325 Howth St | All Window & Door | 6 window at rear and side of house; not visible from street; replaced with milgard double hung; u factor .4Details
6 window at rear and side of house; not visible from street; replaced with milgard double hung; u factor .4 | $3,500 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 325 Howth St | excavater 8x17 area in ground floor for use as bath & laundry area area presently lalnundry area of no wwalkDetails
excavater 8x17 area in ground floor for use as bath & laundry area area presently lalnundry area of no wwalk | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- All Window & Door (2), American Construction, Bradshaw Roofing Inc
- Architects
- Chad Hamilton
- Engineers
- Susan G. Aitken
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.