Block 6517, lot 013
958 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 4
- Rooms
- 8 bedrooms, 5 bathrooms
- Building
- 3,912 sq ft
- Lot
- 4,024 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | revision to application 202509094906, install new stair guardrail in existing location.Details
revision to application 202509094906, install new stair guardrail in existing location. | $2,000 |
| Sep 9, 2025 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroomDetails
interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroom | $58,000 |
| Nov 24, 2021 | Completed final sign-off Feb 2023 | 962 Capp St | Hon's Construction Inc. | rev to pa# 202008212311: new powder room at ground fl.Details
rev to pa# 202008212311: new powder room at ground fl. | |
| Aug 21, 2020 | Completed final sign-off Mar 2023 | 962 Capp St | Hon's Construction Inc. | interior remodel and small rear addition of existing 2nd flr apt unit.Details
interior remodel and small rear addition of existing 2nd flr apt unit. | $115,000 |
| Dec 13, 2019 | Completed final sign-off Jan 2020 | 962 Capp St | Pop Construction A Parnership | dry rot repair of ext apt ext stair to comply with nov #201985601. repair not to exceed 50% of entire stair structure. per district inspector's request, additional structural detail required. ref pa #201910154440.Details
dry rot repair of ext apt ext stair to comply with nov #201985601. repair not to exceed 50% of entire stair structure. per district inspector's request, additional structural detail required. ref pa #201910154440. | $2,000 |
| Oct 15, 2019 | Completed final sign-off Jan 2020 | 962 Capp St | Pop Construction A Parnership | dry rot repair of (e) apt exit stair, to comply with nov 201985601 dated 9/20/2019, repair only, not to exceed 50% of entire stair structure.Details
dry rot repair of (e) apt exit stair, to comply with nov 201985601 dated 9/20/2019, repair only, not to exceed 50% of entire stair structure. | $2,000 |
| Mar 15, 2012 | Never finaled issued Mar 2012, no final | 958 Capp St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $17,400 |
| Jan 26, 2011 | Completed final sign-off Aug 2011 | 958 Capp St | Cristian Rotoro | revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairsDetails
revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairs | $5,000 |
| Jan 14, 2011 | Completed final sign-off Aug 2011 | 960 Capp St | revision to pa# 2010-1001-2134 to clarify top floor sunroom at back of building envolope (n) landing & door at 2nd floor rear sunporch. add (n) window at 2nd floor rear sunporch.Details
revision to pa# 2010-1001-2134 to clarify top floor sunroom at back of building envolope (n) landing & door at 2nd floor rear sunporch. add (n) window at 2nd floor rear sunporch. | $5,000 | |
| Oct 4, 2010 | Completed final sign-off Apr 2011 | 958 Capp St | Madera Design & Construction | existing bathrooms ( 1 bath per unit) in 2 northern units relocated from existing sun porch location to eat in kitchen locationDetails
existing bathrooms ( 1 bath per unit) in 2 northern units relocated from existing sun porch location to eat in kitchen location | $20,000 |
| Oct 1, 2010 | Completed final sign-off Apr 2011 | 958 Capp St | Madera Design & Construction | new foundation at rear storage units. lower floor level 12", pour (n) concrete slab. replace (e) deck and stair at rear of units. reframe (e) sun-porches at floor 2, reframe (e) office (north) at floor 3.Details
new foundation at rear storage units. lower floor level 12", pour (n) concrete slab. replace (e) deck and stair at rear of units. reframe (e) sun-porches at floor 2, reframe (e) office (north) at floor 3. | $20,000 |
| Sep 30, 2010 | Completed final sign-off Oct 2010 | 958 Capp St | Madera Design & Construction | replace in kind existing wooden entry stairs @ both sides of buildingDetails
replace in kind existing wooden entry stairs @ both sides of building | $2,000 |
| Sep 8, 2010 | Completed final sign-off Apr 2011 | 958 Capp St | foundation replacement at rear, structural work only. no fire inspection required.Details
foundation replacement at rear, structural work only. no fire inspection required. | $22,000 | |
| Sep 1, 2010 | Completed final sign-off Apr 2011 | 964 Capp St | mechanical, electrical & plumbing upgrade, laundry, kitchen & bathroom remodel, new bath added. per nov #200454678 dated 11/10/04.remove gas line to kitchen ceiling, light & capp gas line. under separate permit...provide heating to habitable spaceDetails
mechanical, electrical & plumbing upgrade, laundry, kitchen & bathroom remodel, new bath added. per nov #200454678 dated 11/10/04.remove gas line to kitchen ceiling, light & capp gas line. under separate permit...provide heating to habitable space | $75,000 | |
| Jul 26, 2010 | Never finaled issued Jul 2010, no final | 958 Capp St | Madera Design & Construction | replace dry rot stair tread on button of stairs 964 capp st, repair rot in side rail reattach side wall to stair treat, comply with nov 20044791 item 2Details
replace dry rot stair tread on button of stairs 964 capp st, repair rot in side rail reattach side wall to stair treat, comply with nov 20044791 item 2 | $2,000 |
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 958 Capp St | rear building. renew pa# 2003/12/31/3239 's'.Details
rear building. renew pa# 2003/12/31/3239 's'. | $25,100 | |
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 962 Capp St | renew pa# 2000/08/30/9272.Details
renew pa# 2000/08/30/9272. | $25,100 | |
| Aug 9, 2007 | Never finaled issued Aug 2007, no final | 958 Capp St | curb cut (s)Details
curb cut (s) | ||
| Dec 31, 2003 | Never finaled issued Mar 2005, no final | 958 Capp St | erect 3 story 2 unit residential bldg-(rear bldg)Details
erect 3 story 2 unit residential bldg-(rear bldg) | $300,000 | |
| Aug 30, 2000 | Expired or cancelled expired Dec 2010 | 958 Capp St | Rpe Construction | remodel of building & seismic upgrade partialy voluntary per plans.convertto 2 units,r-3 occupancy.Details
remodel of building & seismic upgrade partialy voluntary per plans.convertto 2 units,r-3 occupancy. | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hon's Construction Inc. (4), Madera Design & Construction (4), Pop Construction A Parnership (2), Cristian Rotoro, Gateway Roofing And Water Proofing Inc, Rpe Construction
- Architects
- Heidi Liebes (5)
- Engineers
- Donald David (2), Alex Rood, Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.