Block 0228, lot 009
558 Sacramento St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 4
- Units
- 1
- Rooms
- 8 bathrooms
- Building
- 11,500 sq ft
- Lot
- 2,390 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2016 | Never finaled issued May 2016, no final | 558 Sacramento St | San Francisco Fire Protection | as builts to pa 2014-0815-3968, install new monitor modules to tie-in new flow & tamper swtches to existing panel. revised device point # to reflect the job site. maher naDetails
as builts to pa 2014-0815-3968, install new monitor modules to tie-in new flow & tamper swtches to existing panel. revised device point # to reflect the job site. maher na | |
| Apr 26, 2016 | Expired or cancelled cancelled Jan 2026 | 558 Sacramento St | Faith N Jason Construction Llc | revision to app#2014031810550 includes 2 new fire station pulls, one new smoke detectors emergency lighting and new horn strobe. n/a for maher. fire alrm and sprinklers separte permitDetails
revision to app#2014031810550 includes 2 new fire station pulls, one new smoke detectors emergency lighting and new horn strobe. n/a for maher. fire alrm and sprinklers separte permit | $200 |
| Apr 5, 2016 | Completed final sign-off Oct 2017 | 558 Sacramento St | Faith N Jason Construction Llc | enlarge (e) electrical room at (e) 4 story restaurant. relocate toilet ref pa 201403181050Details
enlarge (e) electrical room at (e) 4 story restaurant. relocate toilet ref pa 201403181050 | $6,000 |
| Feb 4, 2016 | Never finaled issued Feb 2016, no final | 558 Sacramento St | Faith N Jason Construction Llc | revision to 201403181050, new wall at offices, new lights new closetDetails
revision to 201403181050, new wall at offices, new lights new closet | |
| Apr 17, 2015 | Completed final sign-off Jul 2016 | 558 Sacramento St | San Francisco Fire Protection | revision to pa# 201408153968. add complete 4th floor plan. no changes on device locations.Details
revision to pa# 201408153968. add complete 4th floor plan. no changes on device locations. | |
| Feb 27, 2015 | Completed final sign-off Jul 2016 | 558 Sacramento St | J R Wagner Fire Protection | 3rd and 4th floor t.i.: addition of fire sprinklers to fully sprinkler the building. entire fourth floor and new sprinklers on third floor to be added to (e) sprinkler system. upgrading fire service from two inch to four inch w/new underground. re-route fdc piping to connect to system side.Details
3rd and 4th floor t.i.: addition of fire sprinklers to fully sprinkler the building. entire fourth floor and new sprinklers on third floor to be added to (e) sprinkler system. upgrading fire service from two inch to four inch w/new underground. re-route fdc piping to connect to system side. | $10,000 |
| Aug 15, 2014 | Completed final sign-off Jul 2016 | 558 Sacramento St | San Francisco Fire Protection | like for like voluntary fire system replacement with new devices at the same location. install new modules to monitor extg waterflow tamper switch and ansul system. install new control modules for elevator control. tie-in extg notification devices to new panel. n/a for the maher. replace 9 smokes,Details
like for like voluntary fire system replacement with new devices at the same location. install new modules to monitor extg waterflow tamper switch and ansul system. install new control modules for elevator control. tie-in extg notification devices to new panel. n/a for the maher. replace 9 smokes, | $15,800 |
| Mar 18, 2014 | Completed final sign-off Jul 2016 | 558 Sacramento St | Make Ready Maintenance Inc, Faith N Jason Construction Llc | interior remodel of the 4th fl of existing 4 story building that is mostly restaurant. 4th fl is being renovated from office to restaurant. 3rd floor to be permitted for dining. sprinklers thorughout and f/a under separate permit. maher-compliance with ordinance no.155-13 not required.Details
interior remodel of the 4th fl of existing 4 story building that is mostly restaurant. 4th fl is being renovated from office to restaurant. 3rd floor to be permitted for dining. sprinklers thorughout and f/a under separate permit. maher-compliance with ordinance no.155-13 not required. | $73,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2016 | 558 Sacramento St | Make Ready Maintenance Inc, Faith N Jason Construction Llc | new skylight in (e) 4 story restaurant. ** maher: compliance with ordinance no# 155-13 not required **Details
new skylight in (e) 4 story restaurant. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |
| Jun 23, 2010 | Completed final sign-off Jul 2010 | 558 Sacramento St | for administrative purposes only, disabled access checklist and haedships being resubmitted. the documents were approved for pa# 2009.09.03.6144 but lost before record management scanning occured.Details
for administrative purposes only, disabled access checklist and haedships being resubmitted. the documents were approved for pa# 2009.09.03.6144 but lost before record management scanning occured. | ||
| May 28, 2010 | Never finaled issued May 2010, no final | 558 Sacramento St | street space permitDetails
street space permit | ||
| May 10, 2010 | Completed final sign-off Jul 2010 | 558 Sacramento St | Gateway Framing Inc | evacuation signage approval only for 1st floor main lobby and 4th floor only.Details
evacuation signage approval only for 1st floor main lobby and 4th floor only. | $100 |
| May 3, 2010 | Never finaled issued May 2010, no final | 558 Sacramento St | Nielson Mechanical Inc. | upgrade fire supression systems to existing restaurant wayfare restaurantDetails
upgrade fire supression systems to existing restaurant wayfare restaurant | $9,300 |
| Mar 11, 2010 | Never finaled issued Apr 2010, no final | 558 Sacramento St | Diversified Fire Products | fire alarm retrofit for wayfair tavern, replacement of hardwired system with addressable system.Details
fire alarm retrofit for wayfair tavern, replacement of hardwired system with addressable system. | $20,260 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 558 Sacramento St | Zebra Awning Co Inc | fabricat & install 6-awnings: (4) 4'-10" @ 2nd. & 3rd. flr. (2) 6'-10" @ ground at sacramento st.Details
fabricat & install 6-awnings: (4) 4'-10" @ 2nd. & 3rd. flr. (2) 6'-10" @ ground at sacramento st. | $4,000 |
| Oct 26, 2009 | Completed final sign-off Jul 2010 | 558 Sacramento St | Gateway Framing Inc | demolition of interior space of restaurant to be converted into a new restaurant space. removal of floor coverings, remove (e) kitchen equipment, remove wall coverings & various cosemetic items. pa# 2009-0903-6144-application for future restaurant renovationsDetails
demolition of interior space of restaurant to be converted into a new restaurant space. removal of floor coverings, remove (e) kitchen equipment, remove wall coverings & various cosemetic items. pa# 2009-0903-6144-application for future restaurant renovations | $25,000 |
| Sep 3, 2009 | Completed final sign-off Jul 2010 | 558 Sacramento St | Gateway Framing Inc | remodel existing restaurant space to include new finishes, replace kitchen equip, new employee restroom, locker room, changing room. new direct vent fireplace, repair to exist bar wall, updated restrooms, awning,exterior seating, and lighting.Details
remodel existing restaurant space to include new finishes, replace kitchen equip, new employee restroom, locker room, changing room. new direct vent fireplace, repair to exist bar wall, updated restrooms, awning,exterior seating, and lighting. | $485,000 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 558 Sacramento St | Tyco Integrated Security | replace non-functioning dialer panel w/(n) dialer panel in basement next to (e) fire control panel. install (n) smoke detector above (n) panel pull station & horn detectors next to it. connect ex. panel to (n) dialer to monitor alarm & trouble condition.Details
replace non-functioning dialer panel w/(n) dialer panel in basement next to (e) fire control panel. install (n) smoke detector above (n) panel pull station & horn detectors next to it. connect ex. panel to (n) dialer to monitor alarm & trouble condition. | $2,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Faith N Jason Construction Llc (5), Gateway Framing Inc (3), San Francisco Fire Protection (3), Make Ready Maintenance Inc (2), Diversified Fire Products, J R Wagner Fire Protection, Nielson Mechanical Inc., Tyco Integrated Security, Zebra Awning Co Inc
- Architects
- Heidi Liebes (4)
Find contractors for work like this