Grace Orourke
- Listed as
- architect, authorized agent-others
- Firm
- 444 Architects
- Based in
- Clarksville
- On San Francisco permits
- Dec 2019 to Sep 2026
37 permits since 2000 (architect on 36 permits, authorized agent-others on 3 permits): 14 completed, 17 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 718 Moultrie St | add bathroom to 1st floor.Details
add bathroom to 1st floor. | $50,000 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 149 Anderson St | Edri Construction Inc *See Notes* | add a bathroom to the basement.Details
add a bathroom to the basement. | $150,000 |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 216 Ellsworth St | remodel existing ground floor storage into mudroom, laundry, bedroom, and office.Details
remodel existing ground floor storage into mudroom, laundry, bedroom, and office. | $200,000 | |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 747 19th Av | add a ground floor adu to what was previously storage space. no structural work to be done, addition of an interior partition wall.Details
add a ground floor adu to what was previously storage space. no structural work to be done, addition of an interior partition wall. | $50,000 | |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 209 Anderson St | interior remodel adding bedroom and bathroom to the 1st fl. infill a lightwell, enclosing a small deck on the 2nd fl, adding a dormer.Details
interior remodel adding bedroom and bathroom to the 1st fl. infill a lightwell, enclosing a small deck on the 2nd fl, adding a dormer. | $250,000 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 20 Santa Marina St | Edri Construction Inc *See Notes* | revision to permit no : 202501087939. lightwell infill, glass block on 1st floor and rated wall on 2nd floor, concrete foundation rev. add 2 new skylightsDetails
revision to permit no : 202501087939. lightwell infill, glass block on 1st floor and rated wall on 2nd floor, concrete foundation rev. add 2 new skylights | $2,000 |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 371 Banks St | Edri Construction Inc *See Notes* | 1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entryDetails
1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entry | $250,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 2339 45th Av | remove (e) eletric stove and legalize (e) bathroom in basement. remedy nov#202541547.Details
remove (e) eletric stove and legalize (e) bathroom in basement. remedy nov#202541547. | $10,000 | |
| Apr 7, 2026 | In progress filed Apr 2026, not yet issued | 115 Navajo Av | recify nov 202429598. remove interior walls, remove bathroom, remove kitchen stove, remove any unpermitted electrical work @ garage levelDetails
recify nov 202429598. remove interior walls, remove bathroom, remove kitchen stove, remove any unpermitted electrical work @ garage level | $15,000 | |
| Mar 11, 2026 | In progress filed Mar 2026, not yet issued | 214 States St | Edri Construction Inc *See Notes* | remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy.Details
remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy. | $874,500 |
| Feb 26, 2026 | In progress issued Feb 2026 | 255 Anderson St | repair existing entry stairs and railingDetails
repair existing entry stairs and railing | $8,000 | |
| Nov 24, 2025 | In progress issued Nov 2025 | 3485 Jackson St | remodel (e) rooms at basement, no changes to the exterior no change to structure no added conditioned space. all (e) bearing walls to remain. adjusting interior non structrual partition wallsDetails
remodel (e) rooms at basement, no changes to the exterior no change to structure no added conditioned space. all (e) bearing walls to remain. adjusting interior non structrual partition walls | $80,000 | |
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 20 Santa Marina St | Edri Construction Inc *See Notes* | structural revision to permit 202501087939. foundation repair to add another section of foundation to replace old brick foundation.Details
structural revision to permit 202501087939. foundation repair to add another section of foundation to replace old brick foundation. | |
| Sep 4, 2025 | In progress issued Sep 2025 | 3485 Jackson St | kitchen remodel and primary bath remodel to include (n) windows and doors at rear of property. not visible from street.Details
kitchen remodel and primary bath remodel to include (n) windows and doors at rear of property. not visible from street. | $250,000 | |
| Jul 28, 2025 | In progress issued Mar 2026 | 311 Vienna St | Nelson Jameson Construction Inc | state adu program- convert garage space into adu.Details
state adu program- convert garage space into adu. | $100,000 |
| Jun 24, 2025 | In progress issued Feb 2026 | 4998 Mission St | convert (e) storage space on g/f into dwelling unit.Details
convert (e) storage space on g/f into dwelling unit. | $125,000 | |
| Feb 24, 2025 | In progress filed Feb 2025, not yet issued | 1317 Hyde St | install a fan & a 2 burner electric cooktop for unit#2Details
install a fan & a 2 burner electric cooktop for unit#2 | $2,000 | |
| Jan 29, 2025 | Completed final sign-off Oct 2025 | 605 Cortland Av | Cookline Construction Inc | replace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification.Details
replace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification. | $50,000 |
| Jan 28, 2025 | Completed final sign-off Oct 2025 | 2298 03rd St | Edri Construction Inc *See Notes* | first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred.Details
first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred. | $30,000 |
| Oct 17, 2024 | Expired or cancelled cancelled Nov 2024 | 20 Santa Marina St | demolishing the 2 story rear yard deck, combining the existing 20 santa marina with 22 santa marina, and creating a 1 story studio addition to the rear yard to replace the existing 20 santa marina.the top floor will now being corporated as part of 22 santa marina and...Details
demolishing the 2 story rear yard deck, combining the existing 20 santa marina with 22 santa marina, and creating a 1 story studio addition to the rear yard to replace the existing 20 santa marina.the top floor will now being corporated as part of 22 santa marina and... | $250,000 | |
| Aug 8, 2024 | Completed final sign-off Apr 2025 | 11 Roscoe St | to comply with nov #202419740 expansion of existing 2 story balconyDetails
to comply with nov #202419740 expansion of existing 2 story balcony | $5,000 | |
| Jun 4, 2024 | Completed final sign-off Dec 2024 | 2026 46th Av | Edgewood Builders Inc | replace e windows, new stucco at fromt. new sliding at rear,larger opening between living rm and kitchen, small punch openings between living rm and stair, new skylight in living rm.Details
replace e windows, new stucco at fromt. new sliding at rear,larger opening between living rm and kitchen, small punch openings between living rm and stair, new skylight in living rm. | $40,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 637 29th Av | O'reilly Construction | remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls.Details
remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls. | $80,000 |
| May 10, 2024 | Completed final sign-off Jun 2024 | 222 Winfield St | Edri Construction Inc *See Notes* | revisin to permit 202311281473. remove pouring of new foundation. existing foundations sufficient for the scope of work of the project. revised special inspection sheet to reflect this change.Details
revisin to permit 202311281473. remove pouring of new foundation. existing foundations sufficient for the scope of work of the project. revised special inspection sheet to reflect this change. | $2,000 |
| Mar 15, 2024 | Completed final sign-off Jul 2024 | 30 Grand View Tr | Mission Home Remodeling Inc | remodel existing kitchen and primary bathroom on 3rd fl. remove 1 non structural wall in kitchenDetails
remodel existing kitchen and primary bathroom on 3rd fl. remove 1 non structural wall in kitchen | $55,000 |
| Nov 28, 2023 | Completed final sign-off Jun 2024 | 222 Winfield St | Edri Construction Inc *See Notes* | demolish a portion of the wall in the kitchen. add a new wall, beam & footings. new counters and cabinets, parital kitchen remdoel.Details
demolish a portion of the wall in the kitchen. add a new wall, beam & footings. new counters and cabinets, parital kitchen remdoel. | $12,000 |
| Oct 4, 2023 | Expired or cancelled cancelled Aug 2024 | 11 Roscoe St | Mission Home Remodeling Inc | to comply w/ complaint # 202313628, repair existing rear balconies inkind, add structural bracing to make them stronger.Details
to comply w/ complaint # 202313628, repair existing rear balconies inkind, add structural bracing to make them stronger. | $2,000 |
| Jul 26, 2023 | Never finaled filed Jul 2023, never issued | 70 Ellsworth St | add small bathroom and two rooms to basement total of 470 sq ft of altered habitable space.Details
add small bathroom and two rooms to basement total of 470 sq ft of altered habitable space. | $30,000 | |
| Jun 22, 2023 | Completed final sign-off Jul 2023 | 30 Grand View Tr | Mission Home Remodeling Inc | revision to pa# 202303143641. replacing existing rotten rim joist at exterior balcony. like to likeDetails
revision to pa# 202303143641. replacing existing rotten rim joist at exterior balcony. like to like | |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 52 Pleasant St | Mission Home Remodeling Inc | modifying one full bathroom & one half bathroom into 2 full bathroomsDetails
modifying one full bathroom & one half bathroom into 2 full bathrooms | $45,000 |
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 70 Ellsworth St | remodel (e) bathroom. add new bathroom upstairs. remove a wall between kitchen & dining room. replace (e) rear doors.Details
remodel (e) bathroom. add new bathroom upstairs. remove a wall between kitchen & dining room. replace (e) rear doors. | $15,000 | |
| May 10, 2023 | Completed final sign-off Sep 2023 | 205 Coleridge St | Edri Construction Inc *See Notes* | remodel existing bathroom, add a small bath. all work on 3rd floor.Details
remodel existing bathroom, add a small bath. all work on 3rd floor. | $20,000 |
| Nov 2, 2022 | Never finaled filed Nov 2022, never issued | 175 Anderson St | remodeling existing ground fl of the single family home,remodeling 2nd floor and adding a 3rd floor,a small roof deck and a room.Details
remodeling existing ground fl of the single family home,remodeling 2nd floor and adding a 3rd floor,a small roof deck and a room. | $100,000 | |
| Apr 26, 2022 | Completed final sign-off May 2025 | 2547 42nd Av | Vidal Alfredo Construction, Reliable Construction Inc | 1st flr rear addition w/ roof deck above. remodel of interior upstairs. the purpose of this is to create habitable living space on the ground floor for increase access for a disabled client. new windows, doors, stucco, garage door, trash enclosure at front.Details
1st flr rear addition w/ roof deck above. remodel of interior upstairs. the purpose of this is to create habitable living space on the ground floor for increase access for a disabled client. new windows, doors, stucco, garage door, trash enclosure at front. | $500,000 |
| Jul 21, 2021 | Expired or cancelled cancelled Dec 2024 | 2360 Pacific Av | convert 724 sf of existing unconditioned mechanical space on the roof into an adu. 6 story multi-family existing building, mechanical room is not visable from the street.Details
convert 724 sf of existing unconditioned mechanical space on the roof into an adu. 6 story multi-family existing building, mechanical room is not visable from the street. | $85,000 | |
| Oct 7, 2020 | Completed final sign-off Jun 2021 | 45 Longview Ct | Tako Studios Llc. | build new bathroom on level 1 basement per plans with toilet, sink & shower. remodel (e) level 2 bathroom in same location with (n) fixture locations per plans.Details
build new bathroom on level 1 basement per plans with toilet, sink & shower. remodel (e) level 2 bathroom in same location with (n) fixture locations per plans. | $26,500 |
| Dec 20, 2019 | Completed final sign-off May 2020 | 4809 Mission St | change of use from retail to restaurant (sweet treats). develop ground floor by installing tile floors. 3 sinks, hand sink, 3 compartment sink, prep sink, prep area partition wall and drainsDetails
change of use from retail to restaurant (sweet treats). develop ground floor by installing tile floors. 3 sinks, hand sink, 3 compartment sink, prep sink, prep area partition wall and drains | $22,000 |