Gb Construction Company
- Based in
- Fairfield
- On San Francisco permits
- Jul 2010 to Jan 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 24 completed, 2 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2026 | In progress issued Apr 2026 | 2465 Harrison St | replace (e) rear yard deck/landings and exterior stairs with (n) deck and rear yard access stairs including a pre-fabricated steel, spiral staircase, and construction of new, shallow isolated pad footings.Details
replace (e) rear yard deck/landings and exterior stairs with (n) deck and rear yard access stairs including a pre-fabricated steel, spiral staircase, and construction of new, shallow isolated pad footings. | $20,000 |
| Nov 19, 2025 | In progress issued Dec 2025 | 2467 Harrison St | remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor.Details
remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor. | $75,000 |
| Jun 26, 2024 | Completed final sign-off Feb 2025 | 331 Hearst Av | to obtain a final inspection for work approved under pa# 201803143635 & 202010317931. all work is complete.Details
to obtain a final inspection for work approved under pa# 201803143635 & 202010317931. all work is complete. | |
| Mar 8, 2022 | Completed final sign-off Jul 2022 | 1838 32nd Av | water damage repair: replace new drywall approx 96 sf of wall. new flooring & new vanity in bathroom on ground. no wall or layout changes.Details
water damage repair: replace new drywall approx 96 sf of wall. new flooring & new vanity in bathroom on ground. no wall or layout changes. | $20,000 |
| Oct 28, 2021 | Completed final sign-off Feb 2023 | 1324 Balboa St | 2 unit remodeling kitchen and bathrooms like for like: new electrical and new plumbingDetails
2 unit remodeling kitchen and bathrooms like for like: new electrical and new plumbing | $85,000 |
| Feb 26, 2021 | Completed final sign-off May 2021 | 619 Dorado Tr | kitchen remodeling in kind. no new wall & no(e) wall relocation. all plumbing fixtures remain at same location. new lighting, shall comply with cec 150.0(k)3Details
kitchen remodeling in kind. no new wall & no(e) wall relocation. all plumbing fixtures remain at same location. new lighting, shall comply with cec 150.0(k)3 | $12,500 |
| Oct 31, 2020 | Expired or cancelled expired Feb 2025 | 331 Hearst Av | revision to alteration project bpa#201803143635, changes to front facade & interior layout. no change to building footprint, (1) new skylight. street-facing windows to be marvin al-clad wood interior.Details
revision to alteration project bpa#201803143635, changes to front facade & interior layout. no change to building footprint, (1) new skylight. street-facing windows to be marvin al-clad wood interior. | $30,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 158 Granville Wy | hallway bathroom remodel like for like. new electrical, drywall, plumbing, tile, fixturesDetails
hallway bathroom remodel like for like. new electrical, drywall, plumbing, tile, fixtures | $18,000 |
| Feb 4, 2020 | Completed final sign-off Jul 2020 | 355 Christopher Dr | add 471 sq ft. conditioned area within (e) garage of single family residence. new windows at side and rear facades not visible from street.Details
add 471 sq ft. conditioned area within (e) garage of single family residence. new windows at side and rear facades not visible from street. | $20,000 |
| Aug 16, 2019 | Completed final sign-off Aug 2019 | 2071 29th Av | front windows replacement like for like stucco refinish - wood interior aluminum exterior within existing openingsDetails
front windows replacement like for like stucco refinish - wood interior aluminum exterior within existing openings | $2,000 |
| Jan 30, 2019 | Never finaled issued Jan 2019, no final | 1521 Florida St | exterior work: remove and replace siding, exterior painting partial window and trim comply with complaint 201039598 item # 6. repair in kind. work not visible from public right of way.Details
exterior work: remove and replace siding, exterior painting partial window and trim comply with complaint 201039598 item # 6. repair in kind. work not visible from public right of way. | $18,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2019 | 1441 Oak St | to address dbi complaint 201921441 repair wood stairs at front < 50%, concrete pathway at side of house and interior garage work. no other work.Details
to address dbi complaint 201921441 repair wood stairs at front < 50%, concrete pathway at side of house and interior garage work. no other work. | $18,000 |
| Dec 7, 2018 | Never finaled issued Aug 2019, no final | 158 Granville Wy | 93 sq.ft second floor addition to single family home. new master bath. addition is minimally visible from streetDetails
93 sq.ft second floor addition to single family home. new master bath. addition is minimally visible from street | $30,000 |
| Nov 27, 2018 | Completed final sign-off May 2019 | 1521 Florida St | kitchen and bath remodeling, 150 sq kitchen each, 45 sq bath each. like for like.Details
kitchen and bath remodeling, 150 sq kitchen each, 45 sq bath each. like for like. | $30,000 |
| Oct 11, 2018 | Completed final sign-off Aug 2019 | 2071 29th Av | replace (2) back yard windows & (2) patio doors in-kind not visible from street. replace & patch stucco. like for like replacement.Details
replace (2) back yard windows & (2) patio doors in-kind not visible from street. replace & patch stucco. like for like replacement. | $3,000 |
| May 25, 2018 | Completed final sign-off Dec 2018 | 2465 Harrison St | hallway bathroom remodel like for like. 50 sq ft.Details
hallway bathroom remodel like for like. 50 sq ft. | $15,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 2071 29th Av | guest bathroom remodeling, hallway bathroom remodeling, master bath remodling like for like. relocate shower mixer, new tile in 3 bathrooms. 135 sqft total.Details
guest bathroom remodeling, hallway bathroom remodeling, master bath remodling like for like. relocate shower mixer, new tile in 3 bathrooms. 135 sqft total. | $35,000 |
| Mar 14, 2018 | Expired or cancelled expired Feb 2025 | 331 Hearst Av | alteration of a single family residential three-story bldg. expand bldg horizontail at rear on all three stories. remodel interior w/ new finishes & fixtures.Details
alteration of a single family residential three-story bldg. expand bldg horizontail at rear on all three stories. remodel interior w/ new finishes & fixtures. | $300,000 |
| Feb 16, 2018 | Completed final sign-off Feb 2018 | 2465 Harrison St | dbi permit revision to 201706068529: reduce scope of work not remodeling hallway bath.Details
dbi permit revision to 201706068529: reduce scope of work not remodeling hallway bath. | |
| Feb 14, 2018 | Completed final sign-off Oct 2018 | 160 San Aleso Av | 2 bathroom and kitchen remodel. 1 bathroom damage dryrot, demo and remodel in basement. no exterior changingDetails
2 bathroom and kitchen remodel. 1 bathroom damage dryrot, demo and remodel in basement. no exterior changing | $34,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 300 03rd St | #414 -kitchen & bath remodeling like to like. no removal of walls.Details
#414 -kitchen & bath remodeling like to like. no removal of walls. | $35,000 |
| Jun 6, 2017 | Completed final sign-off Dec 2017 | 2467 Harrison St | 2nd fl: remove fire place including wall. and new hallway closet.Details
2nd fl: remove fire place including wall. and new hallway closet. | $17,000 |
| Jun 6, 2017 | Completed final sign-off Feb 2018 | 2465 Harrison St | 3rd fl: remove fire place including wall. remodel hallway bathroom and add new full bath. add bedroom closet and new window for bathroom.Details
3rd fl: remove fire place including wall. remodel hallway bathroom and add new full bath. add bedroom closet and new window for bathroom. | $17,000 |
| May 2, 2017 | Never finaled issued May 2017, no final | 132 Gates St | master bathroom and hallway bathroom remodel, 1/2 bathroom - like for like (total 2-1/2 bathrooms) no structural work. no walls to be movedDetails
master bathroom and hallway bathroom remodel, 1/2 bathroom - like for like (total 2-1/2 bathrooms) no structural work. no walls to be moved | $35,000 |
| Dec 30, 2016 | Completed final sign-off May 2018 | 132 Gates St | remodel street facade only. install new alum clad wood windows, new integrally colored stucco siding, new lighting, new planter, new garage door and decorative trim; roof repairDetails
remodel street facade only. install new alum clad wood windows, new integrally colored stucco siding, new lighting, new planter, new garage door and decorative trim; roof repair | $15,000 |
| Aug 26, 2015 | Completed final sign-off Dec 2020 | 1922 34th Av | vertical & horizontal addition. renovation to 2nd story. 3 story addition with new roof deck. new courtyard and new landscaping of rer yard.Details
vertical & horizontal addition. renovation to 2nd story. 3 story addition with new roof deck. new courtyard and new landscaping of rer yard. | $173,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 428 Grove St | kitchen remodeling like to like, replace similar, upgrade electrical & install new countertop no moving or adding walls. at least 50% high efficency lighting by wattage, cec 150(k).Details
kitchen remodeling like to like, replace similar, upgrade electrical & install new countertop no moving or adding walls. at least 50% high efficency lighting by wattage, cec 150(k). | $12,650 |
| Jul 18, 2011 | Completed final sign-off Jul 2011 | 611 Ulloa St | revision for partial framing (dry rot repair) and replace/install new patio door, same size. revision to 201106289078Details
revision for partial framing (dry rot repair) and replace/install new patio door, same size. revision to 201106289078 | $1,500 |
| Jun 28, 2011 | Completed final sign-off Jul 2011 | 611 Ulloa St | kitchen remodeling, like for like:- replace cabinet and counter. add new lighting. at least 50% high efficacy (by wattage) lightingDetails
kitchen remodeling, like for like:- replace cabinet and counter. add new lighting. at least 50% high efficacy (by wattage) lighting | $22,500 |
| Sep 27, 2010 | Completed final sign-off Oct 2010 | 3965 Cesar Chavez St | kitchen remodeling. like to like. no electrical involved.only cabinets, counter tops, flooring. no walls to be removed. on 2nd floor.Details
kitchen remodeling. like to like. no electrical involved.only cabinets, counter tops, flooring. no walls to be removed. on 2nd floor. | $8,500 |
| Aug 2, 2010 | Completed final sign-off Jul 2011 | 238 29th Av | demo partial stucco, remove & repalce (monterey finish) damage member, replace existing windows like to like, partial drywall. all work at front of bldg. max u-factor 0.40 for windows.Details
demo partial stucco, remove & repalce (monterey finish) damage member, replace existing windows like to like, partial drywall. all work at front of bldg. max u-factor 0.40 for windows. | $17,500 |
| Jul 26, 2010 | Completed final sign-off Oct 2010 | 1521 Florida St | to comply with nov# 201039598 dated 4/2/2010. dry rot repair to rear egress stair , more than 50% repacement.Details
to comply with nov# 201039598 dated 4/2/2010. dry rot repair to rear egress stair , more than 50% repacement. | $8,000 |