Back to kitchen remodel contractors
Gb Construction Company
- Based in
- Fairfield
- On San Francisco permits
- Jul 2010 to Jan 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 24 completed, 2 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2025 | In progress issued Dec 2025 | 2467 Harrison St | remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor.Details
remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor. | $75,000 |
| Oct 28, 2021 | Completed final sign-off Feb 2023 | 1324 Balboa St | 2 unit remodeling kitchen and bathrooms like for like: new electrical and new plumbingDetails
2 unit remodeling kitchen and bathrooms like for like: new electrical and new plumbing | $85,000 |
| Feb 26, 2021 | Completed final sign-off May 2021 | 619 Dorado Tr | kitchen remodeling in kind. no new wall & no(e) wall relocation. all plumbing fixtures remain at same location. new lighting, shall comply with cec 150.0(k)3Details
kitchen remodeling in kind. no new wall & no(e) wall relocation. all plumbing fixtures remain at same location. new lighting, shall comply with cec 150.0(k)3 | $12,500 |
| Nov 27, 2018 | Completed final sign-off May 2019 | 1521 Florida St | kitchen and bath remodeling, 150 sq kitchen each, 45 sq bath each. like for like.Details
kitchen and bath remodeling, 150 sq kitchen each, 45 sq bath each. like for like. | $30,000 |
| Feb 14, 2018 | Completed final sign-off Oct 2018 | 160 San Aleso Av | 2 bathroom and kitchen remodel. 1 bathroom damage dryrot, demo and remodel in basement. no exterior changingDetails
2 bathroom and kitchen remodel. 1 bathroom damage dryrot, demo and remodel in basement. no exterior changing | $34,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 300 03rd St | #414 -kitchen & bath remodeling like to like. no removal of walls.Details
#414 -kitchen & bath remodeling like to like. no removal of walls. | $35,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 428 Grove St | kitchen remodeling like to like, replace similar, upgrade electrical & install new countertop no moving or adding walls. at least 50% high efficency lighting by wattage, cec 150(k).Details
kitchen remodeling like to like, replace similar, upgrade electrical & install new countertop no moving or adding walls. at least 50% high efficency lighting by wattage, cec 150(k). | $12,650 |
| Jun 28, 2011 | Completed final sign-off Jul 2011 | 611 Ulloa St | kitchen remodeling, like for like:- replace cabinet and counter. add new lighting. at least 50% high efficacy (by wattage) lightingDetails
kitchen remodeling, like for like:- replace cabinet and counter. add new lighting. at least 50% high efficacy (by wattage) lighting | $22,500 |
| Sep 27, 2010 | Completed final sign-off Oct 2010 | 3965 Cesar Chavez St | kitchen remodeling. like to like. no electrical involved.only cabinets, counter tops, flooring. no walls to be removed. on 2nd floor.Details
kitchen remodeling. like to like. no electrical involved.only cabinets, counter tops, flooring. no walls to be removed. on 2nd floor. | $8,500 |