Block 2149, lot 002A
2071 29th Ave
- City’s use
- Single Family Residential
- Built
- 1939
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,250 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2023 | Completed final sign-off Jun 2023 | 2071 29th Av | C F Y Construction Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,750 |
| Aug 16, 2019 | Completed final sign-off Aug 2019 | 2071 29th Av | Gb Construction Company | front windows replacement like for like stucco refinish - wood interior aluminum exterior within existing openingsDetails
front windows replacement like for like stucco refinish - wood interior aluminum exterior within existing openings | $2,000 |
| Oct 11, 2018 | Completed final sign-off Aug 2019 | 2071 29th Av | Gb Construction Company | replace (2) back yard windows & (2) patio doors in-kind not visible from street. replace & patch stucco. like for like replacement.Details
replace (2) back yard windows & (2) patio doors in-kind not visible from street. replace & patch stucco. like for like replacement. | $3,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 2071 29th Av | Gb Construction Company | guest bathroom remodeling, hallway bathroom remodeling, master bath remodling like for like. relocate shower mixer, new tile in 3 bathrooms. 135 sqft total.Details
guest bathroom remodeling, hallway bathroom remodeling, master bath remodling like for like. relocate shower mixer, new tile in 3 bathrooms. 135 sqft total. | $35,000 |
| Jun 18, 2015 | Completed final sign-off Jul 2015 | 2071 29th Av | Jin Qing Construction Co. | as built floor plans to approved application #201501145779 and 201503272088.Details
as built floor plans to approved application #201501145779 and 201503272088. | $2,000 |
| Mar 27, 2015 | Completed final sign-off Jul 2015 | 2071 29th Av | Jin Qing Construction Co. | add one bedroom, one full bath and family room at 1st floor. add deck at rear on 2nd floor per plan.Details
add one bedroom, one full bath and family room at 1st floor. add deck at rear on 2nd floor per plan. | $36,500 |
| Jan 14, 2015 | Completed final sign-off Jul 2015 | 2071 29th Av | Jin Qing Construction Co. | remodel kitchen, (2) bathrooms, replace bedroom interior finishes with 5/8" type "x" gyp bd. no walls to remove ;no structural workDetails
remodel kitchen, (2) bathrooms, replace bedroom interior finishes with 5/8" type "x" gyp bd. no walls to remove ;no structural work | $32,600 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 2071 29th Av | replace kitchen cabinets, tile, floor, add ac outlets. replace bath tile, floor/walls, replace faucets. remodel stall shower and open wall connecting to closet. add toilet and sink, add fan to create separate bath.Details
replace kitchen cabinets, tile, floor, add ac outlets. replace bath tile, floor/walls, replace faucets. remodel stall shower and open wall connecting to closet. add toilet and sink, add fan to create separate bath. | $12,000 | |
| May 17, 2010 | Completed final sign-off May 2010 | 2071 29th Av | New City Construction Group Inc | reroofingDetails
reroofing | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gb Construction Company (3), Jin Qing Construction Co. (3), C F Y Construction Inc, New City Construction Group Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.