Hoffs Handyman
- Based in
- San Francisco
- On San Francisco permits
- May 2023 to May 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2024 | Completed final sign-off May 2024 | 3862 24th St | rev to pa# 2023-0523-8361; mechanical all unneccessary items for final sign off (a/c) will happen at future dateDetails
rev to pa# 2023-0523-8361; mechanical all unneccessary items for final sign off (a/c) will happen at future date | $154,062 |
| Feb 28, 2024 | In progress issued Feb 2024 | 3862 24th St | dry rot repair of ground floor office room adj. to east lightwell. add concrete curb to elevate stud wall above exterior slab.Details
dry rot repair of ground floor office room adj. to east lightwell. add concrete curb to elevate stud wall above exterior slab. | $3,000 |
| May 23, 2023 | Completed final sign-off May 2024 | 3862 24th St | t.i. and change of use to retail food, convert (e) commercial unit (m) into retail food cafe (b) minor physical alterations to interior to ccommodte frozen yogurt shop w/ retail include installation (n) equipment, fixtures, finishes and servicesDetails
t.i. and change of use to retail food, convert (e) commercial unit (m) into retail food cafe (b) minor physical alterations to interior to ccommodte frozen yogurt shop w/ retail include installation (n) equipment, fixtures, finishes and services | $154,062 |
| May 1, 2023 | Completed final sign-off Feb 2024 | 3862 24th St | g/f: new ada bathroom for commercial space.Details
g/f: new ada bathroom for commercial space. | $22,000 |