From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 14, 2022 | Completed final sign-off Sep 2022 | 2075 Mission St | Golden Gate Sign Company Inc. | intalling (1) projecting sign "union station"Details
intalling (1) projecting sign "union station" | $10,000 |
| Nov 24, 2021 | Completed final sign-off Dec 2021 | 2075 Mission St | Integrity Air Systems Corporation | revised mechanical plans to 202009093749Details
revised mechanical plans to 202009093749 | |
| Oct 20, 2021 | Completed final sign-off Dec 2021 | 2075 Mission St | San Francisco Fire Protection | as-builts to pa 202103045881. delete 1 strobe on mezzanine, replace 4 wall mount strobes and 2 horn/strobes with ceiling mount at the same location. install new monitor modules to monitor 3 duct detectors.Details
as-builts to pa 202103045881. delete 1 strobe on mezzanine, replace 4 wall mount strobes and 2 horn/strobes with ceiling mount at the same location. install new monitor modules to monitor 3 duct detectors. | $2,000 |
| Jun 28, 2021 | Never finaled issued Jul 2021, no final | 2075 Mission St | Aquamatic Fire Protection | relocate 14 pendent heads, add 25 pendents and repl 8 heads for new walls being installed. total 47 heads. repl 70' of 1.5" to 2" pipe. install new 3" and 4" pipes to supply new heads.Details
relocate 14 pendent heads, add 25 pendents and repl 8 heads for new walls being installed. total 47 heads. repl 70' of 1.5" to 2" pipe. install new 3" and 4" pipes to supply new heads. | $16,000 |
| Mar 4, 2021 | Never finaled issued Apr 2021, no final | 2075 Mission St | San Francisco Fire Protection | add on to existing fire alarm system due to new tenant on ground & mezzanine level. install new notification devices thru-out for complete coverage & tie-in to existing control panel on ground floor # 2017-0104-6470, # 2020-0909-3749Details
add on to existing fire alarm system due to new tenant on ground & mezzanine level. install new notification devices thru-out for complete coverage & tie-in to existing control panel on ground floor # 2017-0104-6470, # 2020-0909-3749 | $5,000 |
| Nov 30, 2020 | Expired or cancelled cancelled Nov 2024 | 2075 Mission St | Hasz Construction Inc | remove existing finishes. no structural. ab017.Details
remove existing finishes. no structural. ab017. | $2,000 |
| Nov 24, 2020 | Never finaled filed Nov 2020, never issued | 2075 Mission St | Golden Gate Sign Company Inc. | refurb/reface (e) signage. illuminated projecting double-faced blade sign. "union station"Details
refurb/reface (e) signage. illuminated projecting double-faced blade sign. "union station" | $10,000 |
| Sep 9, 2020 | Completed final sign-off Dec 2021 | 2075 Mission St | Hasz Construction Inc | per cua 2019-004451prj tenant build out cannabis retail consumption lounge, mill work, storage, locker, shower rooms, office, existing restroom to be ada compliant, relocate doors at entry, new finishes, lighting.Details
per cua 2019-004451prj tenant build out cannabis retail consumption lounge, mill work, storage, locker, shower rooms, office, existing restroom to be ada compliant, relocate doors at entry, new finishes, lighting. | $420,000 |
| May 12, 2017 | Never finaled issued May 2017, no final | 180 Capp St | Aquamatic Fire Protection | replace 156 upright sprinklers and 9 pendnent sprinklers due to old sprinklers. upgrade eqrthquake bracing, and branch line restraints. no underground work. deficiency work only - no ti to referenceDetails
replace 156 upright sprinklers and 9 pendnent sprinklers due to old sprinklers. upgrade eqrthquake bracing, and branch line restraints. no underground work. deficiency work only - no ti to reference | $16,000 |
| Jan 4, 2017 | Completed final sign-off Aug 2017 | 180 Capp St | San Francisco Fire Protection | sprinkler water flow & supervisory system. install control panel, smoke detector, pull station & aes radio on ground floor. install monitor modules to tie-in existing water flow & tamper switches. ref pa 2016-110-2495Details
sprinkler water flow & supervisory system. install control panel, smoke detector, pull station & aes radio on ground floor. install monitor modules to tie-in existing water flow & tamper switches. ref pa 2016-110-2495 | $2,700 |
| Nov 10, 2016 | Completed final sign-off Sep 2018 | 180 Capp St | removal of non-bearing walls at 3rd level only. no exterior work under this permit.Details
removal of non-bearing walls at 3rd level only. no exterior work under this permit. | $10,000 | |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 2073 Mission St | to obtain final inspection for work approved under pa# 200411129037. all work is complete.Details
to obtain final inspection for work approved under pa# 200411129037. all work is complete. | ||
| Nov 20, 2013 | Completed final sign-off Jan 2014 | 2073 Mission St | to obtain final inspection for work approved under pa# 200504018921. all work is complete.Details
to obtain final inspection for work approved under pa# 200504018921. all work is complete. | ||
| May 16, 2005 | Completed final sign-off Nov 2013 | 2073 Mission St | reviside coridor location at levels 2 & 3, revised use of office suits 202 & 302 with in b occupancyDetails
reviside coridor location at levels 2 & 3, revised use of office suits 202 & 302 with in b occupancy | ||
| Apr 1, 2005 | Expired or cancelled expired Dec 2006 | 2073 Mission St | Jupiter Enterprises Inc | install ventilation systems for cosmotology school. mep. onlyDetails
install ventilation systems for cosmotology school. mep. only | $1,000 |
| Feb 14, 2005 | Never finaled issued Feb 2005, no final | 2073 Mission St | streetspaceDetails
streetspace | ||
| Feb 1, 2005 | Completed final sign-off May 2005 | 2073 Mission St | revised app#200411129037. 1st floor only.nc-3 personal service 712.89 ref.790.116 from maushel art&Details
revised app#200411129037. 1st floor only.nc-3 personal service 712.89 ref.790.116 from maushel art& | ||
| Nov 12, 2004 | Expired or cancelled expired Dec 2006 | 2073 Mission St | barrier removal/new entry of mission st, toilets/new fire escape to be submitted separated per ab019Details
barrier removal/new entry of mission st, toilets/new fire escape to be submitted separated per ab019 | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (3), Aquamatic Fire Protection (2), Golden Gate Sign Company Inc. (2), Hasz Construction Inc (2), Integrity Air Systems Corporation, Jupiter Enterprises Inc
- Architects
- Rony Rolnizky
- Engineers
- Kathryn Briggs, Mk Engineers Inc Steve H Kang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.