Antoine Samra
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Tsa Structural Engineers
- Based in
- Burlingame
- On San Francisco permits
- May 2003 to Apr 2026
39 permits since 2000 (engineer on 34 permits, architect on 3 permits, authorized agent-others on 1 permit, designer on 1 permit): 29 completed, 1 in progress, 2 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2026 | In progress issued May 2026 | 158 15th Av | Edri Construction Inc *See Notes* | modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519Details
modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519 | $50,000 |
| Jan 21, 2026 | Completed final sign-off Apr 2026 | 454 Elizabeth St | Ams Construction | revision to permit 202107023685-s1. add 1 hour fire rated wall at roof skylight.Details
revision to permit 202107023685-s1. add 1 hour fire rated wall at roof skylight. | |
| May 10, 2022 | Completed final sign-off Jan 2024 | 82 Levant St | Little Feet Renovation | 3/f: replace (e) balcony with (n) balcony repair dry rot balcony to be replaced in kind no change in sizeDetails
3/f: replace (e) balcony with (n) balcony repair dry rot balcony to be replaced in kind no change in size | $30,000 |
| Jan 13, 2022 | Completed final sign-off Feb 2022 | 2765 16th St | Constructive Solutions Inc. | revisoin to pa 2021-0608-1938 to add shotcrete to north wall and memorialize correct and verified roof height dimensions. no added height to roof from approved scope under 2021-0608-1938Details
revisoin to pa 2021-0608-1938 to add shotcrete to north wall and memorialize correct and verified roof height dimensions. no added height to roof from approved scope under 2021-0608-1938 | |
| Dec 17, 2021 | Never finaled issued Dec 2021, no final | 544 Victoria St | Kalix Inc Dbalara Construction | add anchor bolts @ 1st floor sill plate to foundation/footing stemDetails
add anchor bolts @ 1st floor sill plate to foundation/footing stem | $4,200 |
| Dec 15, 2021 | Expired or cancelled withdrawn Apr 2022 | 734 Vermont St | Sunset Remodeling And Design Inc | comply with pid 202178091, bid 202185161, 202185289, 202178081. reconfiguration of stair to meet code. remodel 2 kitchen on 1/f and 2/f. remodel 1 bathroom on 1/f. add 1 bathroom on 1/f. relocate bathroom on 2/f.Details
comply with pid 202178091, bid 202185161, 202185289, 202178081. reconfiguration of stair to meet code. remodel 2 kitchen on 1/f and 2/f. remodel 1 bathroom on 1/f. add 1 bathroom on 1/f. relocate bathroom on 2/f. | $40,000 |
| Nov 30, 2021 | Completed final sign-off Apr 2023 | 734 Vermont St | Sunset Remodeling And Design Inc | reconfigure 1st flr addition approx. 134 sf. rear expansion infilled. remove front door (not visible from the street). 2/f: expand the back, 152 sf deck expansion in the bldg area less than 10' height and set in so as not require fire wall. 3/f: add rear deck above (e) 2nd fl roof 126 sf & 1 bathDetails
reconfigure 1st flr addition approx. 134 sf. rear expansion infilled. remove front door (not visible from the street). 2/f: expand the back, 152 sf deck expansion in the bldg area less than 10' height and set in so as not require fire wall. 3/f: add rear deck above (e) 2nd fl roof 126 sf & 1 bath | $17,450 |
| Apr 6, 2021 | Expired or cancelled cancelled Jul 2024 | 3470 Mission St | upgrading the egress from rear of the 1st floor.exterior elevation modification due to the seismic upgrade.repair & replace existing rear stair.Details
upgrading the egress from rear of the 1st floor.exterior elevation modification due to the seismic upgrade.repair & replace existing rear stair. | $200,000 | |
| Apr 2, 2021 | Completed final sign-off Aug 2021 | 460 Staples Av | Ibr Construction | exterior stair case replacmentDetails
exterior stair case replacment | $7,000 |
| Feb 2, 2021 | Completed final sign-off Nov 2021 | 62 San Gabriel Av | Palm Construction Inc | revision of pa 202007140161 - s3: foundation plan new concrete slab at grade, perimeter footing are underpinned added sq footings under interior columns.Details
revision of pa 202007140161 - s3: foundation plan new concrete slab at grade, perimeter footing are underpinned added sq footings under interior columns. | $10,000 |
| Jan 19, 2021 | Completed final sign-off Oct 2022 | 1366 40th Av | Excelsior Building Group | new kitchen and baths at 2/f. new bathroom and living space at 1/f. new exterior rear windows.Details
new kitchen and baths at 2/f. new bathroom and living space at 1/f. new exterior rear windows. | $195,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2022 | 1615 09th Av | Nerland Building And Restoration | build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen.Details
build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen. | $50,000 |
| Nov 19, 2019 | Expired or cancelled withdrawn Jul 2024 | 345 Moncada Wy | interior renovation and deck, kitchen and bath, remodel windows, relocate bath at gr flDetails
interior renovation and deck, kitchen and bath, remodel windows, relocate bath at gr fl | $150,000 | |
| Nov 7, 2019 | Never finaled issued Dec 2019, no final | 56 Mizpah St | voluntary lateral strengthening of garageDetails
voluntary lateral strengthening of garage | $10,000 | |
| Oct 3, 2019 | Completed final sign-off Nov 2019 | 305 Chenery St | Vi Tang Hinh | voluntary works: crawl space reinforcement not seismic upgrade. extg outdoor pier footing upgradeDetails
voluntary works: crawl space reinforcement not seismic upgrade. extg outdoor pier footing upgrade | $15,000 |
| Sep 18, 2019 | Completed final sign-off Jul 2020 | 594 19th Av | Nerland Building And Restoration | on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen.Details
on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen. | $100,000 |
| Jul 11, 2019 | Expired or cancelled cancelled Jan 2026 | 165 Broderick St | redo deck framingDetails
redo deck framing | $5,000 | |
| Feb 27, 2019 | Completed final sign-off Jan 2020 | 33 Cornwall St | Foundations R Us | to comply with nov# 201868951. revision to pa# 2018/04/04/5465. permit for over demolition of rear building.Details
to comply with nov# 201868951. revision to pa# 2018/04/04/5465. permit for over demolition of rear building. | $20,000 |
| Feb 19, 2019 | Completed final sign-off Dec 2019 | 901 Mendell St | revision to pa 2019-0122-0917 amendment of structural beamsDetails
revision to pa 2019-0122-0917 amendment of structural beams | ||
| Jan 28, 2019 | Completed final sign-off Jul 2019 | 808 London St | Nerland Building And Restoration | 1207revision to 201812077812 add new engineered drawings to account for foundation which is not deep enough on half of houseDetails
1207revision to 201812077812 add new engineered drawings to account for foundation which is not deep enough on half of house | |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 254 11th Av | Itu Construction | upgrade existing front steps per planDetails
upgrade existing front steps per plan | $5,000 |
| Nov 28, 2018 | Completed final sign-off Apr 2019 | 385 Magellan Av | Jose Olmos General Contractor | replace existing footing with new footing along southwest side of building approx. 32 linear ft.Details
replace existing footing with new footing along southwest side of building approx. 32 linear ft. | $19,000 |
| Oct 9, 2018 | Completed final sign-off Apr 2019 | 47 Rudden Av | revision to app#201808016148. add footing to bottom half of garage in order to lower slabDetails
revision to app#201808016148. add footing to bottom half of garage in order to lower slab | $3,000 | |
| Jul 13, 2018 | Completed final sign-off Nov 2018 | 145 Henry St | De Brus Construction Inc | revision to pa 2017-0413-3963, new 2' opening in shear wallDetails
revision to pa 2017-0413-3963, new 2' opening in shear wall | $500 |
| Apr 4, 2018 | Completed final sign-off Jan 2020 | 35 Cornwall St | Foundations R Us | replace sagging beams supporting rear dining room; replace decking surface & railing above dining room; replace 1 story rear staircase in-kind; repair interior staircase.Details
replace sagging beams supporting rear dining room; replace decking surface & railing above dining room; replace 1 story rear staircase in-kind; repair interior staircase. | $40,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2020 | 1454 Palou Av | Todd Zaionz Construction, Reliable Construction Inc | remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom.Details
remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom. | $30,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2018 | 830 Broderick St | Nieto Valle Construction | soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a **Details
soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a ** | $60,000 |
| Sep 14, 2017 | Expired or cancelled cancelled Jul 2020 | 500 Lisbon St | soft story upgrade per 2016 cebc a4Details
soft story upgrade per 2016 cebc a4 | $50,000 | |
| Sep 6, 2017 | Completed final sign-off Dec 2019 | 1 Henry Adams St | K Bali Construction | first time tenant improvement for restaurant. ** maher: n/a **Details
first time tenant improvement for restaurant. ** maher: n/a ** | $707,000 |
| Apr 25, 2017 | Completed final sign-off Jul 2017 | 327 Foote Av | Markoff Structural Pest Control | dry rot repair of stairs in kind of the treds & risers only. walls remain. less than 50% of total stairs entry. markoff structural termite report #16722 items #: 1,2,3,4.Details
dry rot repair of stairs in kind of the treds & risers only. walls remain. less than 50% of total stairs entry. markoff structural termite report #16722 items #: 1,2,3,4. | $30,000 |
| Apr 13, 2017 | Expired or cancelled expired Nov 2018 | 145 Henry St | De Brus Construction Inc | soft story upgrade - revision to app#201608054397: revise to part of the foundation plan; replace moment frame with shear wall.Details
soft story upgrade - revision to app#201608054397: revise to part of the foundation plan; replace moment frame with shear wall. | |
| May 23, 2016 | Completed final sign-off Feb 2018 | 4534 Mission St | Sincere Construction Company Inc, Bedrock Construction | seismic reinforcementDetails
seismic reinforcement | $100,000 |
| May 11, 2016 | Completed final sign-off Dec 2016 | 695 48th Av | Pionic Unit Construction Co | soft story retrofit per sfbc chapter 34b engineering criteria: other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria: other rational design. | $25,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | Nerland Building And Restoration | rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date.Details
rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date. | $125,000 |
| Jun 4, 2014 | Completed final sign-off Nov 2014 | 1547 Francisco St | Nerland Building And Restoration | renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor.Details
renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor. | $60,000 |
| Jun 14, 2013 | Completed final sign-off Dec 2013 | 1354 06th Av | add interior partition to divide single bedroom into 2. add washer/dryer closet. remodel extg bedroom into 2nd bathroom. add skylight.Details
add interior partition to divide single bedroom into 2. add washer/dryer closet. remodel extg bedroom into 2nd bathroom. add skylight. | $35,000 | |
| Dec 14, 2010 | Expired or cancelled expired Mar 2013 | 22 Costa St | Frederic Grasset Design-Build | new retaining wall at existing retaining wall on the property line.Details
new retaining wall at existing retaining wall on the property line. | $4,000 |
| Jul 1, 2010 | Completed final sign-off Dec 2010 | 80 Ashton Av | T N T Construction | detached garage. foundation replacement and dry rot repair thru out. no change to existing garage/structure envelope. seismic upgrade.Details
detached garage. foundation replacement and dry rot repair thru out. no change to existing garage/structure envelope. seismic upgrade. | $4,500 |
| May 28, 2003 | Completed final sign-off May 2005 | 968 Corbett Av | vertical addition-addition of new third story & roof deck above existing roof, addition into rear yaDetails
vertical addition-addition of new third story & roof deck above existing roof, addition into rear ya | $100,000 |