75 permits since 2000: 59 completed, 2 in progress, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| May 25, 2022 | Completed final sign-off Apr 2024 | 850 Treat Av | on main level, remove load bearing wall between entry hall and living room. remodel kitchen. add sink to half bath. add french doors to kitchen ext wall on upper level. remove load bearing wall between bedroom 2 & den. remodel bathroom. add shower. reconfigure non-load bearing walls.Details
on main level, remove load bearing wall between entry hall and living room. remodel kitchen. add sink to half bath. add french doors to kitchen ext wall on upper level. remove load bearing wall between bedroom 2 & den. remodel bathroom. add shower. reconfigure non-load bearing walls. | $55,000 |
| May 17, 2022 | Never finaled issued May 2022, no final | 3358 22nd St | 1/f: remodel ktichen & bathroom. like for like on 2/f. remodel kitchen & 2 bathrooms. like for like.Details
1/f: remodel ktichen & bathroom. like for like on 2/f. remodel kitchen & 2 bathrooms. like for like. | $50,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2025 | 416 Arguello Bl | rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks.Details
rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks. | $100,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2026 | 454 Elizabeth St | add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decksDetails
add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decks | $200,000 |
| Feb 2, 2021 | Expired or cancelled cancelled Jan 2026 | 55 Capistrano Av | on main floor: open load bearing wallbetween dinging and bedroom,relocate 15ft of load bearing wall at rear of prop, renovate ktichen & bath on upper floor, remove 15ft of load bearing wall/relocate; renovate bath to create master suite.Details
on main floor: open load bearing wallbetween dinging and bedroom,relocate 15ft of load bearing wall at rear of prop, renovate ktichen & bath on upper floor, remove 15ft of load bearing wall/relocate; renovate bath to create master suite. | $75,000 |
| Feb 2, 2021 | Expired or cancelled withdrawn Sep 2022 | 2145 Jackson St | remove load bearing wall in kitchen, remodel kitchen and add washer/dryer. remodel master bathroom.Details
remove load bearing wall in kitchen, remodel kitchen and add washer/dryer. remodel master bathroom. | $50,000 |
| Jan 28, 2021 | Never finaled issued Jan 2021, no final | 442 Arlington St | bathroom remodel fixtures, same locations. 1st floor.Details
bathroom remodel fixtures, same locations. 1st floor. | $5,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2022 | 1615 09th Av | build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen.Details
build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen. | $50,000 |
| Dec 15, 2020 | Never finaled issued Mar 2021, no final | 3358 22nd St | in basement, replace brick foundation & ensure 7'6" ceiling height. on 1st fl unit, remove load-being wall in living room, add half bathDetails
in basement, replace brick foundation & ensure 7'6" ceiling height. on 1st fl unit, remove load-being wall in living room, add half bath | $50,000 |
| Oct 19, 2020 | Completed final sign-off May 2022 | 54 Saturn St | remodel 2 bathrooms. no layout changes.Details
remodel 2 bathrooms. no layout changes. | $10,000 |
| Jan 17, 2020 | Completed final sign-off Dec 2020 | 130 21st Av | build out basement/garage level to include bedroom, living room and bathroomDetails
build out basement/garage level to include bedroom, living room and bathroom | $50,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 774 Guerrero St | replace nine wood windows having og lugs to be replaced in kind wood for wood with og lugs to match the google 2018/ 2019 photo.Details
replace nine wood windows having og lugs to be replaced in kind wood for wood with og lugs to match the google 2018/ 2019 photo. | $5,000 |
| Sep 18, 2019 | Completed final sign-off Jul 2020 | 594 19th Av | on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen.Details
on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen. | $100,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 661 14th Av | remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining roomDetails
remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining room | $100,000 |
| Jun 27, 2019 | Completed final sign-off May 2022 | 772 Guerrero St | build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place.Details
build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place. | $15,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 772 Guerrero St | remodel kitchen, remodel and re-configure bathroom, add bathroom, relocate washer and dryer, open wall between kitchen and living room on upper level, open wall between kichen and dining room in both units. n/a for maherDetails
remodel kitchen, remodel and re-configure bathroom, add bathroom, relocate washer and dryer, open wall between kitchen and living room on upper level, open wall between kichen and dining room in both units. n/a for maher | $100,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2024 | 2121 24th St | 1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location ofDetails
1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location of | $200,000 |
| Mar 18, 2019 | Completed final sign-off Jun 2019 | 333 Pierce St | remodel 2 bathrooms. minor reconfiguating of 3 non-load bearing walls.Details
remodel 2 bathrooms. minor reconfiguating of 3 non-load bearing walls. | $20,000 |
| Jan 28, 2019 | Completed final sign-off Jul 2019 | 808 London St | 1207revision to 201812077812 add new engineered drawings to account for foundation which is not deep enough on half of houseDetails
1207revision to 201812077812 add new engineered drawings to account for foundation which is not deep enough on half of house | |
| Dec 7, 2018 | Completed final sign-off Jul 2019 | 808 London St | excavate (e) basement from current 7'1" to 7'6" finished ceiling height and create bedroom, office, bathroom and laundry rm. excavation less than 50 cu yards.Details
excavate (e) basement from current 7'1" to 7'6" finished ceiling height and create bedroom, office, bathroom and laundry rm. excavation less than 50 cu yards. | $75,000 |
| Nov 21, 2018 | Completed final sign-off Nov 2019 | 774 Guerrero St | kitchen remodel, add full bath, relocate washer dryer. no exterior work.Details
kitchen remodel, add full bath, relocate washer dryer. no exterior work. | $30,000 |
| Oct 29, 2018 | Never finaled issued Mar 2022, no final | 2471 47th Av | create 16'6" 2 story addition at rear of bldg. add wetbar, bathroom, bedroom to lower level. reconfigure both bedroms and add bath to upper levelDetails
create 16'6" 2 story addition at rear of bldg. add wetbar, bathroom, bedroom to lower level. reconfigure both bedroms and add bath to upper level | $100,000 |
| Jun 26, 2018 | Completed final sign-off Oct 2018 | 496 Crestlake Dr | interior bath remodel and 6 window replacements: at front - small 2nd story bathroom window replaced in-kind w/double hung alum clad wood w/true divided lites and ogees; 2nd floor double casements w/true divided lites; at side pop-out, (n) fixed window with divided lites. 3 rear window replacements.Details
interior bath remodel and 6 window replacements: at front - small 2nd story bathroom window replaced in-kind w/double hung alum clad wood w/true divided lites and ogees; 2nd floor double casements w/true divided lites; at side pop-out, (n) fixed window with divided lites. 3 rear window replacements. | $30,000 |
| Jun 26, 2018 | Expired or cancelled withdrawn Jun 2022 | 377 Elsie St | rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections.Details
rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections. | $75,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| May 3, 2018 | Completed final sign-off May 2018 | 650 Prentiss St | alteration to 201702219766 changing a door to an egress windowDetails
alteration to 201702219766 changing a door to an egress window | $200 |
| Sep 8, 2017 | Completed final sign-off Aug 2018 | 2225 Divisadero St | excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suiteDetails
excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suite | $150,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 479 Bartlett St | renovate kitchen, add bathroom, new window/door of dining rm is replacement window and door of existingDetails
renovate kitchen, add bathroom, new window/door of dining rm is replacement window and door of existing | $50,000 |
| May 17, 2017 | Completed final sign-off Mar 2022 | 54 Saturn St | (e) kitchen remodel at the 3rd story and removal at 2 load bearing walls. provide new beams and posts. en;arge (e) closet at the 2nd flrDetails
(e) kitchen remodel at the 3rd story and removal at 2 load bearing walls. provide new beams and posts. en;arge (e) closet at the 2nd flr | $55,000 |
| Feb 23, 2017 | Completed final sign-off Nov 2017 | 135 Ewing Tr | build out lower garage level and add bedroom, bath, family room, laundry room, office, and mechanical room. remove post with larger beam. re-build stairs between lower level and 2nd flr. enlarge opening between hall and dining rm. two new large ext. sliders.Details
build out lower garage level and add bedroom, bath, family room, laundry room, office, and mechanical room. remove post with larger beam. re-build stairs between lower level and 2nd flr. enlarge opening between hall and dining rm. two new large ext. sliders. | $100,000 |
| Feb 23, 2017 | Expired or cancelled cancelled Aug 2022 | 234 Bennington St | vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl.Details
vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl. | $100,000 |
| Feb 21, 2017 | Completed final sign-off May 2018 | 650 Prentiss St | excavate a portion of garage 6" to allow for a hallway, bedroom, bathroom with 8' ceiling height. add door leading to rear yard & move window in bathroom & make smaller. restore floor 2 exterior to the original stucco from 1993 vinyl siding project & replace two windows like for like.Details
excavate a portion of garage 6" to allow for a hallway, bedroom, bathroom with 8' ceiling height. add door leading to rear yard & move window in bathroom & make smaller. restore floor 2 exterior to the original stucco from 1993 vinyl siding project & replace two windows like for like. | $45,000 |
| Dec 12, 2016 | Expired or cancelled cancelled Jan 2023 | 433 Baden St | extend rear of floor 1 only 3'10-3/32", enclose (e) mechanical room, create new family room/breakfast nook, remove 13'4-1/2" of load-bearing wall to open up family room, install steel and glass door on floor 1 leading to backyard, repair rear deck, minor kitchen renovation.Details
extend rear of floor 1 only 3'10-3/32", enclose (e) mechanical room, create new family room/breakfast nook, remove 13'4-1/2" of load-bearing wall to open up family room, install steel and glass door on floor 1 leading to backyard, repair rear deck, minor kitchen renovation. | $75,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2016 | 1267 Masonic Av | renovate a bathroom - fixtures & finishes. no structural work, no wall modification.Details
renovate a bathroom - fixtures & finishes. no structural work, no wall modification. | $10,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2019 | 64 Sussex St | extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garageDetails
extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garage | $250,000 |
| May 11, 2016 | Completed final sign-off Feb 2017 | 1795 Green St | 1st floor: renovate kitchen and bathroom, convert bathroom to powder room, add bathroom, reconfigure non-load bearing walls.Details
1st floor: renovate kitchen and bathroom, convert bathroom to powder room, add bathroom, reconfigure non-load bearing walls. | $90,000 |
| Feb 22, 2016 | Never finaled filed Feb 2016, never issued | 122 Gambier St | horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs.Details
horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs. | $85,000 |
| Feb 22, 2016 | Completed final sign-off Sep 2016 | 74 Parker Av | renovate kitchen, 2 bathrooms and add powder room with a toilet and sink on 3rd floor.Details
renovate kitchen, 2 bathrooms and add powder room with a toilet and sink on 3rd floor. | $55,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2015 | 722 12th Av | to comply with physical inspection report #cc-7540Details
to comply with physical inspection report #cc-7540 | |
| Oct 13, 2015 | Expired or cancelled withdrawn Dec 2016 | 433 Baden St | horizontal & vertical addition on both lot 005 & 006, two lots will merge together. build 2 story addition w/ 2 car garage, rebuild existing garden shed in rear yard, renovate kitchen, add master bath, replace center load-bearing wall in existing structure w/ steel beam, open up/expand both bedrms.Details
horizontal & vertical addition on both lot 005 & 006, two lots will merge together. build 2 story addition w/ 2 car garage, rebuild existing garden shed in rear yard, renovate kitchen, add master bath, replace center load-bearing wall in existing structure w/ steel beam, open up/expand both bedrms. | $200,000 |
| Sep 17, 2015 | Completed final sign-off Dec 2015 | 728 24th Av | construct deck on floor 2 rear within buildable area.Details
construct deck on floor 2 rear within buildable area. | $5,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2015 | 724 12th Av | add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floorDetails
add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floor | $5,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 722 12th Av | move wall in conjuncture with bath remodel in both units. revision to pa 201501095316Details
move wall in conjuncture with bath remodel in both units. revision to pa 201501095316 | |
| Apr 1, 2015 | Completed final sign-off May 2015 | 650 Prentiss St | bathroom remodel. replace in-kind. no structural work.Details
bathroom remodel. replace in-kind. no structural work. | $5,000 |
| Mar 16, 2015 | Completed final sign-off Nov 2015 | 4640 17th St | remove load bearing wall and renovate kitchenDetails
remove load bearing wall and renovate kitchen | $30,000 |
| Jan 9, 2015 | Completed final sign-off Sep 2015 | 722 12th Av | remodel 2 bathrooms, one on each level/in each ubit. no structural work. 2 new shower pans.Details
remodel 2 bathrooms, one on each level/in each ubit. no structural work. 2 new shower pans. | $20,000 |
| Dec 3, 2014 | Completed final sign-off Mar 2015 | 129 07th Av | remodel bath and add 1/2 bath at 3rd flDetails
remodel bath and add 1/2 bath at 3rd fl | $40,000 |
| Nov 24, 2014 | Completed final sign-off Oct 2015 | 925 Fulton St | deck repair dry rot; repair in kind less than 50% (front); maher n/aDetails
deck repair dry rot; repair in kind less than 50% (front); maher n/a | $500 |
| Nov 17, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date.Details
rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date. | $125,000 |
| Oct 22, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | remodel and move kitchen and bathroom, add 1 bathroom on second floor. adding partition walls and utility room on 1st floor. replace brick foundation in front of the building.Details
remodel and move kitchen and bathroom, add 1 bathroom on second floor. adding partition walls and utility room on 1st floor. replace brick foundation in front of the building. | $100,000 |
| Oct 20, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | exploratory permit to 3 deconstruct approx 20 sq ft areas in garage to expose structural members to access engineering/construction requirement. replace fire resistive rating after exploratory work is complete (if no future work is done).Details
exploratory permit to 3 deconstruct approx 20 sq ft areas in garage to expose structural members to access engineering/construction requirement. replace fire resistive rating after exploratory work is complete (if no future work is done). | $250 |
| Jun 4, 2014 | Completed final sign-off Nov 2014 | 1547 Francisco St | renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor.Details
renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor. | $60,000 |
| Apr 18, 2014 | Completed final sign-off Aug 2014 | 1267 Masonic Av | like for like kitchen & bath remodelDetails
like for like kitchen & bath remodel | $40,000 |
| Feb 28, 2014 | Completed final sign-off Jun 2014 | 225 Ewing Tr | renovate kitchen & convert split bathroom into 2 bathrooms.Details
renovate kitchen & convert split bathroom into 2 bathrooms. | $40,000 |
| Jan 10, 2014 | Completed final sign-off Jan 2015 | 722 12th Av | relocate kitchen in 2 units, add bath in 2 units. replace portion of load bearing wall on 3 levels with new beam/post/footingDetails
relocate kitchen in 2 units, add bath in 2 units. replace portion of load bearing wall on 3 levels with new beam/post/footing | $50,000 |
| Dec 12, 2013 | Never finaled issued Sep 2014, no final | 2510 Diamond St | rear horizontal addition for 2 living space areas, one 10' x 10' roof deck and 2 new bathrooms.Details
rear horizontal addition for 2 living space areas, one 10' x 10' roof deck and 2 new bathrooms. | $95,000 |
| Dec 4, 2013 | Completed final sign-off Jan 2015 | 722 12th Av | exploratory permit to deconstruct area in garage to expose structural members for future remodel under seperate permit.Details
exploratory permit to deconstruct area in garage to expose structural members for future remodel under seperate permit. | $800 |
| Jul 24, 2013 | Completed final sign-off Feb 2015 | 1501 Plymouth Av | renovate kitchen and bath. open up 2 five foot openings in load bearing wall.connect kitchen hood and bath vent to existiing duct, all led lighting in kitchen bath lighting on occ sensDetails
renovate kitchen and bath. open up 2 five foot openings in load bearing wall.connect kitchen hood and bath vent to existiing duct, all led lighting in kitchen bath lighting on occ sens | $50,000 |
| Jul 19, 2013 | Completed final sign-off Nov 2013 | 3670 19th St | enlarge opening in load bearing wall, renovate kitchen, renovate bathroom & add 1 bathroomDetails
enlarge opening in load bearing wall, renovate kitchen, renovate bathroom & add 1 bathroom | $50,000 |
| Apr 23, 2013 | Completed final sign-off Jun 2013 | 247 Lake St | remodel 2 bathrooms, no structural same locationDetails
remodel 2 bathrooms, no structural same location | $20,000 |
| Apr 8, 2013 | Completed final sign-off Jul 2013 | 650 Prentiss St | renovate kitchen, remove part of load-bearing wall, add deck.Details
renovate kitchen, remove part of load-bearing wall, add deck. | $50,000 |
| Mar 12, 2013 | Completed final sign-off May 2013 | 2219 12th Av | bathroom renovation all plumbing the same, provide high efficacy lights unless they are controlled by manual on occupancy sensorsDetails
bathroom renovation all plumbing the same, provide high efficacy lights unless they are controlled by manual on occupancy sensors | $10,000 |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 506 16th Av | one bathroom remodel: all fixtures stay in same place. on top level - no change in wall and openiong layout. permanent bathroom lighting shall be high efficacy or controlled by manuel on occupancy sensor.Details
one bathroom remodel: all fixtures stay in same place. on top level - no change in wall and openiong layout. permanent bathroom lighting shall be high efficacy or controlled by manuel on occupancy sensor. | $7,000 |
| Nov 19, 2012 | Completed final sign-off Nov 2013 | 6138 Fulton St | replace (5) aluminum single glazed with 5 fiberglass clad wooden windows. all in top level bldg. front. u-factor less or greater than 0.4Details
replace (5) aluminum single glazed with 5 fiberglass clad wooden windows. all in top level bldg. front. u-factor less or greater than 0.4 | $3,000 |
| Oct 1, 2012 | Completed final sign-off Nov 2012 | 161 Marview Wy | 2 bathrooms all firxtures to be in same placeDetails
2 bathrooms all firxtures to be in same place | $18,000 |
| Sep 4, 2012 | Completed final sign-off Nov 2012 | 161 Marview Wy | removal of load bearing wall to be replaced with steel i-beamDetails
removal of load bearing wall to be replaced with steel i-beam | $5,000 |
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 506 16th Av | new deck at rear.Details
new deck at rear. | $5,000 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 506 16th Av | renovating kitchen. remove structural wall at kitchen and re-support by beam, post and new footing.Details
renovating kitchen. remove structural wall at kitchen and re-support by beam, post and new footing. | $20,000 |
| Jul 29, 2010 | Completed final sign-off Sep 2011 | 1621 Golden Gate Av | upper level: convert laundry room to bath, move and rebuild stairs and deck, add new rear door. lower level: infill under 2nd fl for new bath.Details
upper level: convert laundry room to bath, move and rebuild stairs and deck, add new rear door. lower level: infill under 2nd fl for new bath. | $20,000 |
| Aug 21, 2009 | Completed final sign-off Aug 2011 | 1621 Golden Gate Av | remove portion of bearing walls at second and third floors.Details
remove portion of bearing walls at second and third floors. | $2,000 |
| Jul 7, 2009 | Completed final sign-off Jul 2010 | 1621 Golden Gate Av | moving kitchen on both units. add back door on ground level. add 1/2 bath on upper level. convert (e) kitchen to bedroom on lower floor & convert (e) kitchen to family romm on upper floor.Details
moving kitchen on both units. add back door on ground level. add 1/2 bath on upper level. convert (e) kitchen to bedroom on lower floor & convert (e) kitchen to family romm on upper floor. | $50,000 |