Nerland Building And Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Apr 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 59 completed, 2 in progress, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 9 completed, 1 in progress, 1 expired or cancelled. Typically 120 days from filing to permit and 348 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| Sep 18, 2019 | Completed final sign-off Jul 2020 | 594 19th Av | on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen.Details
on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen. | $100,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 661 14th Av | remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining roomDetails
remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining room | $100,000 |
| Jun 27, 2019 | Completed final sign-off May 2022 | 772 Guerrero St | build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place.Details
build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place. | $15,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2024 | 2121 24th St | 1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location ofDetails
1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location of | $200,000 |
| Feb 23, 2017 | Completed final sign-off Nov 2017 | 135 Ewing Tr | build out lower garage level and add bedroom, bath, family room, laundry room, office, and mechanical room. remove post with larger beam. re-build stairs between lower level and 2nd flr. enlarge opening between hall and dining rm. two new large ext. sliders.Details
build out lower garage level and add bedroom, bath, family room, laundry room, office, and mechanical room. remove post with larger beam. re-build stairs between lower level and 2nd flr. enlarge opening between hall and dining rm. two new large ext. sliders. | $100,000 |
| Feb 23, 2017 | Expired or cancelled cancelled Aug 2022 | 234 Bennington St | vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl.Details
vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl. | $100,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2019 | 64 Sussex St | extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garageDetails
extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garage | $250,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2015 | 724 12th Av | add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floorDetails
add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floor | $5,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date.Details
rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date. | $125,000 |
| Jul 29, 2010 | Completed final sign-off Sep 2011 | 1621 Golden Gate Av | upper level: convert laundry room to bath, move and rebuild stairs and deck, add new rear door. lower level: infill under 2nd fl for new bath.Details
upper level: convert laundry room to bath, move and rebuild stairs and deck, add new rear door. lower level: infill under 2nd fl for new bath. | $20,000 |