Nerland Building And Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Apr 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 59 completed, 2 in progress, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
40 kitchen remodel permits: 30 completed, 2 in progress, 3 never finaled, 5 expired or cancelled. Typically 5 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| May 25, 2022 | Completed final sign-off Apr 2024 | 850 Treat Av | on main level, remove load bearing wall between entry hall and living room. remodel kitchen. add sink to half bath. add french doors to kitchen ext wall on upper level. remove load bearing wall between bedroom 2 & den. remodel bathroom. add shower. reconfigure non-load bearing walls.Details
on main level, remove load bearing wall between entry hall and living room. remodel kitchen. add sink to half bath. add french doors to kitchen ext wall on upper level. remove load bearing wall between bedroom 2 & den. remodel bathroom. add shower. reconfigure non-load bearing walls. | $55,000 |
| May 17, 2022 | Never finaled issued May 2022, no final | 3358 22nd St | 1/f: remodel ktichen & bathroom. like for like on 2/f. remodel kitchen & 2 bathrooms. like for like.Details
1/f: remodel ktichen & bathroom. like for like on 2/f. remodel kitchen & 2 bathrooms. like for like. | $50,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2025 | 416 Arguello Bl | rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks.Details
rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks. | $100,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2026 | 454 Elizabeth St | add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decksDetails
add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decks | $200,000 |
| Feb 2, 2021 | Expired or cancelled withdrawn Sep 2022 | 2145 Jackson St | remove load bearing wall in kitchen, remodel kitchen and add washer/dryer. remodel master bathroom.Details
remove load bearing wall in kitchen, remodel kitchen and add washer/dryer. remodel master bathroom. | $50,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2022 | 1615 09th Av | build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen.Details
build out garage to create 2nd unit which includes 2 bedrooms, a living room, a bathroom, and an efficiency kitchen. | $50,000 |
| Sep 18, 2019 | Completed final sign-off Jul 2020 | 594 19th Av | on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen.Details
on main level, remove load bearing wall between kitchen and dinning room. remodel kitchen, re-configure stairs from main to upper level. upper level: add mster bathroom and master closet, relocate washer/dryer. remodel existing kitchen. | $100,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 661 14th Av | remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining roomDetails
remodel kitchen and full bath, remodel half bath & add sink & tub, relocate w/d to closet under stairs; remove non-load bearing wall between kitchen & dining room | $100,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2024 | 2121 24th St | 1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location ofDetails
1st floor: new kitchen, dining, living layout with sliding doors on south wall. new stairs to 2nd level. new wall @ (e) living room & made into guest room/home office. addition of new 2nd floor: 2 new bedroom, baths & laundry. new window & skylights. basement: remove & add wall to change location of | $200,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 772 Guerrero St | remodel kitchen, remodel and re-configure bathroom, add bathroom, relocate washer and dryer, open wall between kitchen and living room on upper level, open wall between kichen and dining room in both units. n/a for maherDetails
remodel kitchen, remodel and re-configure bathroom, add bathroom, relocate washer and dryer, open wall between kitchen and living room on upper level, open wall between kichen and dining room in both units. n/a for maher | $100,000 |
| Nov 21, 2018 | Completed final sign-off Nov 2019 | 774 Guerrero St | kitchen remodel, add full bath, relocate washer dryer. no exterior work.Details
kitchen remodel, add full bath, relocate washer dryer. no exterior work. | $30,000 |
| Jun 26, 2018 | Expired or cancelled withdrawn Jun 2022 | 377 Elsie St | rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections.Details
rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections. | $75,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 44 Kate St | renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maherDetails
renovate kitchen and bath plus flooring and upper floor railing. railing will be metal 42" tall with no spaces greater than 4"; n/a maher | $25,000 |
| Sep 8, 2017 | Completed final sign-off Aug 2018 | 2225 Divisadero St | excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suiteDetails
excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suite | $150,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 479 Bartlett St | renovate kitchen, add bathroom, new window/door of dining rm is replacement window and door of existingDetails
renovate kitchen, add bathroom, new window/door of dining rm is replacement window and door of existing | $50,000 |
| May 17, 2017 | Completed final sign-off Mar 2022 | 54 Saturn St | (e) kitchen remodel at the 3rd story and removal at 2 load bearing walls. provide new beams and posts. en;arge (e) closet at the 2nd flrDetails
(e) kitchen remodel at the 3rd story and removal at 2 load bearing walls. provide new beams and posts. en;arge (e) closet at the 2nd flr | $55,000 |
| Feb 23, 2017 | Expired or cancelled cancelled Aug 2022 | 234 Bennington St | vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl.Details
vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl. | $100,000 |
| Dec 12, 2016 | Expired or cancelled cancelled Jan 2023 | 433 Baden St | extend rear of floor 1 only 3'10-3/32", enclose (e) mechanical room, create new family room/breakfast nook, remove 13'4-1/2" of load-bearing wall to open up family room, install steel and glass door on floor 1 leading to backyard, repair rear deck, minor kitchen renovation.Details
extend rear of floor 1 only 3'10-3/32", enclose (e) mechanical room, create new family room/breakfast nook, remove 13'4-1/2" of load-bearing wall to open up family room, install steel and glass door on floor 1 leading to backyard, repair rear deck, minor kitchen renovation. | $75,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2019 | 64 Sussex St | extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garageDetails
extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garage | $250,000 |
| May 11, 2016 | Completed final sign-off Feb 2017 | 1795 Green St | 1st floor: renovate kitchen and bathroom, convert bathroom to powder room, add bathroom, reconfigure non-load bearing walls.Details
1st floor: renovate kitchen and bathroom, convert bathroom to powder room, add bathroom, reconfigure non-load bearing walls. | $90,000 |
| Feb 22, 2016 | Never finaled filed Feb 2016, never issued | 122 Gambier St | horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs.Details
horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs. | $85,000 |
| Feb 22, 2016 | Completed final sign-off Sep 2016 | 74 Parker Av | renovate kitchen, 2 bathrooms and add powder room with a toilet and sink on 3rd floor.Details
renovate kitchen, 2 bathrooms and add powder room with a toilet and sink on 3rd floor. | $55,000 |
| Oct 13, 2015 | Expired or cancelled withdrawn Dec 2016 | 433 Baden St | horizontal & vertical addition on both lot 005 & 006, two lots will merge together. build 2 story addition w/ 2 car garage, rebuild existing garden shed in rear yard, renovate kitchen, add master bath, replace center load-bearing wall in existing structure w/ steel beam, open up/expand both bedrms.Details
horizontal & vertical addition on both lot 005 & 006, two lots will merge together. build 2 story addition w/ 2 car garage, rebuild existing garden shed in rear yard, renovate kitchen, add master bath, replace center load-bearing wall in existing structure w/ steel beam, open up/expand both bedrms. | $200,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2015 | 724 12th Av | add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floorDetails
add stairs between 1st & 2nd level to make 1st floor part of 2nd floor as unit #724. legalize 1st floor level bathroom & family room. remove illegal 1st floor level kitchen & cabinets. bring stairs from 1st floor to yard up to code. legalize family room on 1st floor | $5,000 |
| Mar 16, 2015 | Completed final sign-off Nov 2015 | 4640 17th St | remove load bearing wall and renovate kitchenDetails
remove load bearing wall and renovate kitchen | $30,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date.Details
rear horizontal addition of 2 living levels. add internal staircase. add small kitchen & bath downstairs. change of use from 1 unit to 2 units. engineer to submit structural drawings at later date. | $125,000 |
| Oct 22, 2014 | Completed final sign-off Jun 2016 | 66 Cook St | remodel and move kitchen and bathroom, add 1 bathroom on second floor. adding partition walls and utility room on 1st floor. replace brick foundation in front of the building.Details
remodel and move kitchen and bathroom, add 1 bathroom on second floor. adding partition walls and utility room on 1st floor. replace brick foundation in front of the building. | $100,000 |
| Jun 4, 2014 | Completed final sign-off Nov 2014 | 1547 Francisco St | renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor.Details
renovate kitchen and bath. remove 10'9" of load bearing wall at 3rd floor. | $60,000 |
| Apr 18, 2014 | Completed final sign-off Aug 2014 | 1267 Masonic Av | like for like kitchen & bath remodelDetails
like for like kitchen & bath remodel | $40,000 |
| Feb 28, 2014 | Completed final sign-off Jun 2014 | 225 Ewing Tr | renovate kitchen & convert split bathroom into 2 bathrooms.Details
renovate kitchen & convert split bathroom into 2 bathrooms. | $40,000 |
| Jan 10, 2014 | Completed final sign-off Jan 2015 | 722 12th Av | relocate kitchen in 2 units, add bath in 2 units. replace portion of load bearing wall on 3 levels with new beam/post/footingDetails
relocate kitchen in 2 units, add bath in 2 units. replace portion of load bearing wall on 3 levels with new beam/post/footing | $50,000 |
| Jul 24, 2013 | Completed final sign-off Feb 2015 | 1501 Plymouth Av | renovate kitchen and bath. open up 2 five foot openings in load bearing wall.connect kitchen hood and bath vent to existiing duct, all led lighting in kitchen bath lighting on occ sensDetails
renovate kitchen and bath. open up 2 five foot openings in load bearing wall.connect kitchen hood and bath vent to existiing duct, all led lighting in kitchen bath lighting on occ sens | $50,000 |
| Jul 19, 2013 | Completed final sign-off Nov 2013 | 3670 19th St | enlarge opening in load bearing wall, renovate kitchen, renovate bathroom & add 1 bathroomDetails
enlarge opening in load bearing wall, renovate kitchen, renovate bathroom & add 1 bathroom | $50,000 |
| Apr 8, 2013 | Completed final sign-off Jul 2013 | 650 Prentiss St | renovate kitchen, remove part of load-bearing wall, add deck.Details
renovate kitchen, remove part of load-bearing wall, add deck. | $50,000 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 506 16th Av | renovating kitchen. remove structural wall at kitchen and re-support by beam, post and new footing.Details
renovating kitchen. remove structural wall at kitchen and re-support by beam, post and new footing. | $20,000 |
| Jul 7, 2009 | Completed final sign-off Jul 2010 | 1621 Golden Gate Av | moving kitchen on both units. add back door on ground level. add 1/2 bath on upper level. convert (e) kitchen to bedroom on lower floor & convert (e) kitchen to family romm on upper floor.Details
moving kitchen on both units. add back door on ground level. add 1/2 bath on upper level. convert (e) kitchen to bedroom on lower floor & convert (e) kitchen to family romm on upper floor. | $50,000 |