Block 1110, lot 005D
225 Ewing Ter
- City’s use
- Single Family Residential
- Built
- 1940
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,500 sq ft
- Lot
- 2,073 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Sep 2026 | 225 Ewing Tr | K O D Construction | revision 202604239944- legalize ground floor wetbar, and bathroom at rear of houseDetails
revision 202604239944- legalize ground floor wetbar, and bathroom at rear of house | |
| Apr 23, 2026 | In progress issued Apr 2026 | 225 Ewing Tr | K O D Construction | bathroom remodel replacing in kind.Details
bathroom remodel replacing in kind. | $20,000 |
| Apr 22, 2021 | Completed final sign-off Mar 2022 | 225 Ewing Tr | Kevin Cooper Construction | replace 6 front windows. all wood. match (e). same size & same location.Details
replace 6 front windows. all wood. match (e). same size & same location. | $8,000 |
| Jun 24, 2016 | Completed final sign-off Apr 2017 | 225 Ewing Tr | replacement of beams supporting decorative balcony on front of house since beams currently have some dry rot. also, if needed, replace any decking on decorative balcony which may require replacement if dry rot is found. replace in kind less than 50% all are exterior pressure treated material.Details
replacement of beams supporting decorative balcony on front of house since beams currently have some dry rot. also, if needed, replace any decking on decorative balcony which may require replacement if dry rot is found. replace in kind less than 50% all are exterior pressure treated material. | $1,500 | |
| Feb 28, 2014 | Completed final sign-off Jun 2014 | 225 Ewing Tr | Nerland Building And Restoration | renovate kitchen & convert split bathroom into 2 bathrooms.Details
renovate kitchen & convert split bathroom into 2 bathrooms. | $40,000 |
| Sep 17, 2009 | Never finaled issued Sep 2009, no final | 225 Ewing Tr | Shaughnessy Roofing Inc | reroofingDetails
reroofing | $11,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K O D Construction (2), Kevin Cooper Construction, Nerland Building And Restoration, Shaughnessy Roofing Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.