K O D Construction
- Based in
- Lafayette
- On San Francisco permits
- May 2016 to Jul 2026
- Last 24 months
- 5 permits filed
29 permits since 2000: 22 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Sep 2026 | 225 Ewing Tr | revision 202604239944- legalize ground floor wetbar, and bathroom at rear of houseDetails
revision 202604239944- legalize ground floor wetbar, and bathroom at rear of house | |
| Jun 1, 2026 | In progress issued Jun 2026 | 2060 Grove St | bathroom remodel to include new bathtub relocating toilet, replacing sink, adding closet to the existing entry hall.Details
bathroom remodel to include new bathtub relocating toilet, replacing sink, adding closet to the existing entry hall. | $40,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 225 Ewing Tr | bathroom remodel replacing in kind.Details
bathroom remodel replacing in kind. | $20,000 |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 316 Moraga St | unit 2: kitchen and bathroom remodel in kind like for like. no wall modifications.Details
unit 2: kitchen and bathroom remodel in kind like for like. no wall modifications. | $45,000 |
| Mar 10, 2025 | Completed final sign-off May 2025 | 3684 17th St | kitchen remodel replacing in kind. no walls to be removedDetails
kitchen remodel replacing in kind. no walls to be removed | $25,000 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 819 Florida St | add 4 skylights and redo roofDetails
add 4 skylights and redo roof | $35,000 |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 2051 Scott St | kitchen remodel replacing in kind.Details
kitchen remodel replacing in kind. | $30,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 1907 Leavenworth St | bathroom remodel replacing in kindDetails
bathroom remodel replacing in kind | $30,000 |
| Feb 21, 2024 | In progress issued Feb 2024 | 316 Moraga St | voluntary lateral strenghening. calculations not submitted and not reviewed. this permit application does not qualify for a seismic retrofit.Details
voluntary lateral strenghening. calculations not submitted and not reviewed. this permit application does not qualify for a seismic retrofit. | $35,000 |
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 370 Shotwell St | (1) kitchen remodel: replacing in kind. update electrical and plumbing as needed.Details
(1) kitchen remodel: replacing in kind. update electrical and plumbing as needed. | $30,000 |
| Oct 18, 2023 | Completed final sign-off Dec 2023 | 370 Shotwell St | 1 bathroom remodel, replace inkind update electrical and plumbing as neededDetails
1 bathroom remodel, replace inkind update electrical and plumbing as needed | $15,000 |
| Oct 12, 2023 | Completed final sign-off Jan 2024 | 251 Glenview Dr | bathroom remodel. replace in kind, updated plumbing amd electrical as neededDetails
bathroom remodel. replace in kind, updated plumbing amd electrical as needed | $25,000 |
| Jan 23, 2023 | Completed final sign-off Apr 2023 | 251 Glenview Dr | bathroom and kithen remodel in-kindDetails
bathroom and kithen remodel in-kind | $55,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 1069 14th St | int remodel of (e) unit on top fl (1071 14th st). (n) interior doors, finishes, fixtures, skylights & reconf interior walls. minor infill at rear of 1st fl below (e) rear pop-out. ext with (n) repl windows in-kind throughout. (n) solar panel on roof. (n) fence/gate at rear. solar under sep permit.Details
int remodel of (e) unit on top fl (1071 14th st). (n) interior doors, finishes, fixtures, skylights & reconf interior walls. minor infill at rear of 1st fl below (e) rear pop-out. ext with (n) repl windows in-kind throughout. (n) solar panel on roof. (n) fence/gate at rear. solar under sep permit. | $210,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 2051 Scott St | remodel bathrooom, relocate launtry into bathroom. no fire alarm & sprinklers modification. no structural work. new fixture in bathroom, new plumbing for laundry in bathroom.Details
remodel bathrooom, relocate launtry into bathroom. no fire alarm & sprinklers modification. no structural work. new fixture in bathroom, new plumbing for laundry in bathroom. | $35,000 |
| Sep 9, 2020 | Completed final sign-off Jan 2021 | 374 Shotwell St | remodel of (e) kitchen & bathroom areas, including new shower, relocating toilet & new tile in kitchen, new kitchen cabinets & applicances.Details
remodel of (e) kitchen & bathroom areas, including new shower, relocating toilet & new tile in kitchen, new kitchen cabinets & applicances. | $60,000 |
| May 24, 2019 | Completed final sign-off Jul 2019 | 160 Banks St | remodel (e) half bath to full bath.Details
remodel (e) half bath to full bath. | $2,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 2748 Harrison St | udating master & hallway bathrooms, adding new toilet shower area & vanity update electrical & plumbingDetails
udating master & hallway bathrooms, adding new toilet shower area & vanity update electrical & plumbing | $60,000 |
| Dec 10, 2018 | Completed final sign-off Jan 2019 | 87 Melrose Av | revision to app#200511228816 to relocate 2nd floor shearwall from living room to dining room.Details
revision to app#200511228816 to relocate 2nd floor shearwall from living room to dining room. | $4,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2018 | 3626 Vicente St | kitchen remodel: update lights, receptacles, move sink & gas line. update kitchen cabinerts & counter tops. replce 2 windows in-kind in 1 kitchen area & 1 dining area. no wall demo.Details
kitchen remodel: update lights, receptacles, move sink & gas line. update kitchen cabinerts & counter tops. replce 2 windows in-kind in 1 kitchen area & 1 dining area. no wall demo. | $30,000 |
| Jun 14, 2018 | Completed final sign-off May 2019 | 1755 Page St | adding cabinets & counter on wall, extending bottom cabinets, 42 inches. revision to pa# 201805239920Details
adding cabinets & counter on wall, extending bottom cabinets, 42 inches. revision to pa# 201805239920 | $2,000 |
| May 23, 2018 | Completed final sign-off Oct 2018 | 1755 Page St | remove non-bearing wall between kitchen and living room.Details
remove non-bearing wall between kitchen and living room. | $4,950 |
| Apr 18, 2018 | Completed final sign-off Jun 2018 | 374 Shotwell St | updating plumbing for new tub and toilet. updating electrical for new vanity light new tile. no walls moved, removed, added or infilled. all layouts to remain unchanged.Details
updating plumbing for new tub and toilet. updating electrical for new vanity light new tile. no walls moved, removed, added or infilled. all layouts to remain unchanged. | $20,000 |
| Dec 13, 2017 | Completed final sign-off Feb 2019 | 829 Oak St | remodel (e) 4-unit residental bldg. work includes window replacement on the back & 2 sides(no change in front elevation). reconfigure units, remove (e) ptns & add new walls, stairs, kitchens, & toilets. struct upgrade, new furnaces & water heaters. sep permit for mep & for fully sprinkler nfpa-13r.Details
remodel (e) 4-unit residental bldg. work includes window replacement on the back & 2 sides(no change in front elevation). reconfigure units, remove (e) ptns & add new walls, stairs, kitchens, & toilets. struct upgrade, new furnaces & water heaters. sep permit for mep & for fully sprinkler nfpa-13r. | $400,000 |
| Sep 7, 2017 | Never finaled issued Jun 2019, no final | 595 Noe St | revision to 2017-0125-7870, remove property line windows, remove ab009 requirement, remove fire sprinkler requirement, revise title 24 for altered sprinklersDetails
revision to 2017-0125-7870, remove property line windows, remove ab009 requirement, remove fire sprinkler requirement, revise title 24 for altered sprinklers | |
| May 22, 2017 | Completed final sign-off Jan 2018 | 197 Joost Av | demo (e) kit, bath & select walls. new kit (cabinets, counters, tile, flooring - repairs, lgtng) new bath (shower, toilet -at (e) waste line), sink, lighting) new partition & infill walls; replace (e) extdoors, ext lgtng gfci outlets, tanklesss w/h. replace portions of flr. new ele panelDetails
demo (e) kit, bath & select walls. new kit (cabinets, counters, tile, flooring - repairs, lgtng) new bath (shower, toilet -at (e) waste line), sink, lighting) new partition & infill walls; replace (e) extdoors, ext lgtng gfci outlets, tanklesss w/h. replace portions of flr. new ele panel | $99,000 |
| Nov 23, 2016 | Completed final sign-off Jan 2017 | 140 Hamerton Av | bathroom upgrade. (n) tile, vianty, mirror, sink, toilet, shower door & counter top.Details
bathroom upgrade. (n) tile, vianty, mirror, sink, toilet, shower door & counter top. | $14,000 |
| Sep 7, 2016 | Completed final sign-off Oct 2016 | 778 Spruce St | replace window (5x) in-kind (currently vinyl, replacing with same.)Details
replace window (5x) in-kind (currently vinyl, replacing with same.) | $7,000 |
| May 16, 2016 | Expired or cancelled cancelled Aug 2016 | 248 06th Av | replace in-kind wood shingle in front of the house.Details
replace in-kind wood shingle in front of the house. | $20,000 |