Block 3574, lot 099
370 Shotwell St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 3
- Rooms
- 9 bedrooms, 6 bathrooms
- Building
- 4,125 sq ft
- Lot
- 3,292 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 370 Shotwell St | K O D Construction | (1) kitchen remodel: replacing in kind. update electrical and plumbing as needed.Details
(1) kitchen remodel: replacing in kind. update electrical and plumbing as needed. | $30,000 |
| Oct 18, 2023 | Completed final sign-off Dec 2023 | 370 Shotwell St | K O D Construction | 1 bathroom remodel, replace inkind update electrical and plumbing as neededDetails
1 bathroom remodel, replace inkind update electrical and plumbing as needed | $15,000 |
| Jun 16, 2023 | Completed final sign-off Jul 2023 | 370 Shotwell St | Olive Remodeling | remove and replace 800 sf w/ like for like siding, on south side of building. installing vapor barrier and fiber-cement (hardie) lap siding & remove (2) layers of siding.Details
remove and replace 800 sf w/ like for like siding, on south side of building. installing vapor barrier and fiber-cement (hardie) lap siding & remove (2) layers of siding. | $30,000 |
| Sep 9, 2020 | Completed final sign-off Jan 2021 | 374 Shotwell St | K O D Construction | remodel of (e) kitchen & bathroom areas, including new shower, relocating toilet & new tile in kitchen, new kitchen cabinets & applicances.Details
remodel of (e) kitchen & bathroom areas, including new shower, relocating toilet & new tile in kitchen, new kitchen cabinets & applicances. | $60,000 |
| Apr 18, 2018 | Completed final sign-off Jun 2018 | 374 Shotwell St | K O D Construction | updating plumbing for new tub and toilet. updating electrical for new vanity light new tile. no walls moved, removed, added or infilled. all layouts to remain unchanged.Details
updating plumbing for new tub and toilet. updating electrical for new vanity light new tile. no walls moved, removed, added or infilled. all layouts to remain unchanged. | $20,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 370 Shotwell St | remove trim and wood paneling at dining room. re-paint interior wallsDetails
remove trim and wood paneling at dining room. re-paint interior walls | $5,000 | |
| May 19, 2016 | Completed final sign-off Apr 2017 | 370 Shotwell St | Lingruen Associates | replace damaged terrazzo steps & landing at front of structure with new similar steps/landing less than 50%.perform repairs as per complaint 201567481,repairs to be done in kind.Details
replace damaged terrazzo steps & landing at front of structure with new similar steps/landing less than 50%.perform repairs as per complaint 201567481,repairs to be done in kind. | $41,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K O D Construction (4), Lingruen Associates, Olive Remodeling
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.