Permit GraphShortlistSan Francisco building permits since 2000

Block 6769, lot 032

298 Baden St

City’s use
Multi-Family Residential
Built
1908
Stories
1
Units
3
Rooms
3 bathrooms
Building
2,750 sq ft
Lot
2,495 sq ft
Zoning
RH1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

10 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 12, 2021Completed
final sign-off Mar 2021
298 Baden Strevision to permit #202103096066. replace front door 36x8d. reduce scope - no longer replacing windows (4).
Details
Permit
202103126457
Status
complete
Filed
Mar 12, 2021
Permit issued
Mar 12, 2021
Final sign-off
Mar 18, 2021
Address
298 Baden St

revision to permit #202103096066. replace front door 36x8d. reduce scope - no longer replacing windows (4).

Open the permit page

Mar 8, 2021Completed
final sign-off Mar 2021
298 Baden Stfront door and window replacement of same kind. property front. 2 windows 60x48. 2 windows 30x48. front door 36x80. (four windows with new aluminum-clad wood windows and replace front door with new composite door.)
Details
Permit
202103086066
Status
complete
Filed
Mar 8, 2021
Permit issued
Mar 8, 2021
Final sign-off
Mar 18, 2021
Declared cost
$1,200
Address
298 Baden St

front door and window replacement of same kind. property front. 2 windows 60x48. 2 windows 30x48. front door 36x80. (four windows with new aluminum-clad wood windows and replace front door with new composite door.)

Open the permit page

$1,200
May 21, 2019Completed
final sign-off Jan 2020
298 Baden Stadding quietrock to ceiling. no drywall coming down. sound proofing kitchen/living room by adding 5/8" quietrock to existing ceiling. layer of green glue sound proofing caulking will be added between for better sound proofing.
Details
Permit
201905211207
Status
complete
Filed
May 21, 2019
Permit issued
May 21, 2019
Final sign-off
Jan 31, 2020
Declared cost
$3,000
Address
298 Baden St

adding quietrock to ceiling. no drywall coming down. sound proofing kitchen/living room by adding 5/8" quietrock to existing ceiling. layer of green glue sound proofing caulking will be added between for better sound proofing.

Open the permit page

$3,000
Nov 10, 2017Never finaled
issued Nov 2017, no final
197 Joost Avstreet space
Details
Permit
M854527
Status
issued
Filed
Nov 10, 2017
Permit issued
Nov 10, 2017
Address
197 Joost Av

street space

Open the permit page

Aug 2, 2017Never finaled
issued Aug 2017, no final
197 Joost AvGalaxy Building Constructionremodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unit
Details
Permit
201708023711
Status
issued
Filed
Aug 2, 2017
Permit issued
Aug 2, 2017
Declared cost
$60,000
Address
197 Joost Av

remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unit

Open the permit page

$60,000
Jul 28, 2017Never finaled
issued Jul 2017, no final
197 Joost Avstreet space
Details
Permit
M814627
Status
issued
Filed
Jul 28, 2017
Permit issued
Jul 28, 2017
Address
197 Joost Av

street space

Open the permit page

Jul 3, 2017Completed
final sign-off Jul 2018
199 Joost AvMt Tam Construction, Kayann Builderbathroom remodel: remove bathtub and install a shower. remove and replace toilet, vanity, top, sink, exaust fan, tile and paint. add heat blower and washer and dryer.
Details
Permit
201707030961
Status
complete
Filed
Jul 3, 2017
Permit issued
Jul 3, 2017
Final sign-off
Jul 5, 2018
Declared cost
$20,000
Address
199 Joost Av

bathroom remodel: remove bathtub and install a shower. remove and replace toilet, vanity, top, sink, exaust fan, tile and paint. add heat blower and washer and dryer.

Open the permit page

$20,000
May 22, 2017Completed
final sign-off Jan 2018
197 Joost AvK O D Constructiondemo (e) kit, bath & select walls. new kit (cabinets, counters, tile, flooring - repairs, lgtng) new bath (shower, toilet -at (e) waste line), sink, lighting) new partition & infill walls; replace (e) extdoors, ext lgtng gfci outlets, tanklesss w/h. replace portions of flr. new ele panel
Details
Permit
201705227278
Status
complete
Filed
May 22, 2017
Permit issued
May 26, 2017
Final sign-off
Jan 12, 2018
Declared cost
$99,000
Address
197 Joost Av

demo (e) kit, bath & select walls. new kit (cabinets, counters, tile, flooring - repairs, lgtng) new bath (shower, toilet -at (e) waste line), sink, lighting) new partition & infill walls; replace (e) extdoors, ext lgtng gfci outlets, tanklesss w/h. replace portions of flr. new ele panel

Open the permit page

$99,000
Feb 6, 2015Completed
final sign-off Feb 2015
197 Joost AvB Y C Construction Inc.re-roofing
Details
Permit
201502067727
Status
complete
Filed
Feb 6, 2015
Permit issued
Feb 6, 2015
Final sign-off
Feb 9, 2015
Declared cost
$8,000
Address
197 Joost Av

re-roofing

Open the permit page

$8,000
Mar 12, 2008Never finaled
issued Mar 2008, no final
199 Joost Avstreet space & sidewalk repair
Details
Permit
M111764
Status
issued
Filed
Mar 12, 2008
Permit issued
Mar 12, 2008
Address
199 Joost Av

street space & sidewalk repair

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
B Y C Construction Inc., Galaxy Building Construction, K O D Construction, Kayann Builder, Mt Tam Construction

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.