Nerland Building And Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Apr 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 59 completed, 2 in progress, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
6 roof deck permits: 2 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 448 days from filing to permit and 723 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2025 | 416 Arguello Bl | rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks.Details
rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks. | $100,000 |
| Feb 23, 2017 | Expired or cancelled cancelled Aug 2022 | 234 Bennington St | vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl.Details
vertical addition.garage level-excavate portion incl shop&storage.move garage fr newman to benington to allow side by side parking.remove secondary newman entrance,remodel kitchen &3rd fl.add stairs to 3rd fl.add 3 brs, 2 baths,laundry, 2 roof decks to 3/fl. | $100,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2019 | 64 Sussex St | extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garageDetails
extend horizontal rear of building. excavate basement floor to allow 8' ceiling height , add family room & bath to 1st flr with internal stairs to 2nd flr. remove & move kitchen & bath on 1st flr, change roof on 2nd flr from peaked to flat to allow for 3 br's & 2 baths, add roof deck on garage | $250,000 |
| Feb 22, 2016 | Never finaled filed Feb 2016, never issued | 122 Gambier St | horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs.Details
horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs. | $85,000 |
| Dec 12, 2013 | Never finaled issued Sep 2014, no final | 2510 Diamond St | rear horizontal addition for 2 living space areas, one 10' x 10' roof deck and 2 new bathrooms.Details
rear horizontal addition for 2 living space areas, one 10' x 10' roof deck and 2 new bathrooms. | $95,000 |