Jose Olmos General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Nov 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2018 | Completed final sign-off Apr 2019 | 385 Magellan Av | replace existing footing with new footing along southwest side of building approx. 32 linear ft.Details
replace existing footing with new footing along southwest side of building approx. 32 linear ft. | $19,000 |
| May 29, 2018 | Completed final sign-off Feb 2019 | 919 Guerrero St | 919a guerrero st: interior remodel of hall bath, 3 bedrooms, living room & hall closet. change piping to and registers.Details
919a guerrero st: interior remodel of hall bath, 3 bedrooms, living room & hall closet. change piping to and registers. | $50,000 |
| Mar 3, 2017 | Completed final sign-off May 2017 | 2919 Mission St | repair wood framing damages as needed at exterior wallDetails
repair wood framing damages as needed at exterior wall | $22,000 |
| Jul 27, 2016 | Completed final sign-off Nov 2016 | 256 Crescent Av | kitchen remodeling new cabinet countertop stove.Details
kitchen remodeling new cabinet countertop stove. | $43,000 |
| Jul 22, 2016 | Completed final sign-off Nov 2016 | 256 Crescent Av | new opening in centerline bearing wall at 2nd floor kitchen. no exterior work and no change to extg egress or life safty.Details
new opening in centerline bearing wall at 2nd floor kitchen. no exterior work and no change to extg egress or life safty. | $5,000 |
| Mar 23, 2015 | Completed final sign-off Apr 2016 | 1026 Diamond St | interior remodel 1st floor include excavate to allow 8'-0" ceiling height with half bath, a new work studio and new utility area per plan. enlarge garage area and door per plan. no work on 2nd floor.Details
interior remodel 1st floor include excavate to allow 8'-0" ceiling height with half bath, a new work studio and new utility area per plan. enlarge garage area and door per plan. no work on 2nd floor. | $50,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 61 Mizpah St | revision to appl #2014.0912.6238: to cut new opening in existing non-structural interior wall. increase construction cost by $20,000.Details
revision to appl #2014.0912.6238: to cut new opening in existing non-structural interior wall. increase construction cost by $20,000. | $20,000 |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 61 Mizpah St | interior remodel of kitchen. new exterior door and windows at side of houseDetails
interior remodel of kitchen. new exterior door and windows at side of house | $20,000 |
| Jan 29, 2014 | Completed final sign-off Aug 2014 | 2554 16th Av | interior remodel to kitchen, bath and stairs. infill lightwell. replace windows.Details
interior remodel to kitchen, bath and stairs. infill lightwell. replace windows. | $85,000 |