Turner Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 31 permits filed
944 permits since 2000: 674 completed, 21 in progress, 114 never finaled, 135 expired or cancelled.
Of the 114 never-finaled permits, 8 are 3 to 5 years old, 35 are 5 to 10 years old, 71 are over 10 years old. 9 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
30 stairs permits: 22 completed, 1 in progress, 4 never finaled, 3 expired or cancelled. Typically 35 days from filing to permit and 398 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | In progress issued Apr 2026 | 1 Beach St | 3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferredDetails
3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred | $1,809,790 |
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | 1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.Details
1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers. | $2,236,032 |
| Jun 29, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | rev to pa 202006198935 to address new stair landings. exterior work.Details
rev to pa 202006198935 to address new stair landings. exterior work. | |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935Details
replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935 | |
| Nov 1, 2022 | Completed final sign-off May 2023 | 101 California St | metal stairs deferred submittal for 202106283370Details
metal stairs deferred submittal for 202106283370 | $152,000 |
| Aug 26, 2022 | Completed final sign-off Feb 2024 | 33 Tehama St | to comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35,Details
to comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35, | $1,000,000 |
| Jul 18, 2022 | Completed final sign-off Feb 2024 | 33 Tehama St | comply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35,Details
comply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35, | |
| Aug 26, 2021 | Completed final sign-off May 2023 | 101 California St | 8/f: hvac & electrical modifications for new elevator and stairsDetails
8/f: hvac & electrical modifications for new elevator and stairs | $11,000 |
| Jun 28, 2021 | Completed final sign-off May 2023 | 101 California St | modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layerDetails
modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layer | $4,669,527 |
| Jun 19, 2020 | Never finaled issued Jul 2021, no final | 101 California St | improvements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop.Details
improvements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop. | $31,349,352 |
| Dec 5, 2018 | Completed final sign-off Oct 2023 | 1 Post St | non-structural demolition within the building foorprint on g/f. access to lobby space, required entries & stair exits to be maintained. area of work to remain vacant until all accessible feature are restore per ab-017.Details
non-structural demolition within the building foorprint on g/f. access to lobby space, required entries & stair exits to be maintained. area of work to remain vacant until all accessible feature are restore per ab-017. | $25,000 |
| Feb 2, 2016 | Never finaled issued Jul 2016, no final | 75 Hawthorne St | arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair.Details
arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair. | $880,000 |
| May 19, 2015 | Completed final sign-off Jan 2020 | 69 Maiden Ln | currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit.Details
currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit. | $500,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 600 California St | 7th & 8th floor: demo (e) non structural partiiions, door/frames, furniture millwork, pluming, ceiling grid and tile, soffits, lighting, power, floor finishes and remove interconnecting stair and infill the opening on 8th floor. for ab-017 and t.i. under separate permit. maher n/a.Details
7th & 8th floor: demo (e) non structural partiiions, door/frames, furniture millwork, pluming, ceiling grid and tile, soffits, lighting, power, floor finishes and remove interconnecting stair and infill the opening on 8th floor. for ab-017 and t.i. under separate permit. maher n/a. | $25,000 |
| Jul 22, 2014 | Completed final sign-off Apr 2015 | 560 Mission St | 23rd floor interior t.i.including demolition per plan. existing core elevator, stairs, restrooms to remain. existing shell to remain. maher n/a.Details
23rd floor interior t.i.including demolition per plan. existing core elevator, stairs, restrooms to remain. existing shell to remain. maher n/a. | $2,677,868 |
| Dec 18, 2013 | Completed final sign-off Jan 2017 | 75 Hawthorne St | floors 1-20. stair upgrade. provide new lighting in stairwell for each floors 1-20. new striping & painting.Details
floors 1-20. stair upgrade. provide new lighting in stairwell for each floors 1-20. new striping & painting. | $416,053 |
| Feb 4, 2013 | Never finaled issued Feb 2013, no final | 75 Hawthorne St | assessibility improvements related to path of travel-including parking re-stripping, parking signage, elevator signage, exterior ramp. ramp & stair handrails & stair nosing. relocate fdc as needed for ramp modificationsDetails
assessibility improvements related to path of travel-including parking re-stripping, parking signage, elevator signage, exterior ramp. ramp & stair handrails & stair nosing. relocate fdc as needed for ramp modifications | $108,000 |
| Nov 29, 2011 | Completed final sign-off Jan 2012 | 201 Spear St | evacuation sign only for floors 5-8. note: 7th floor "west stairs" will be on separate permit.Details
evacuation sign only for floors 5-8. note: 7th floor "west stairs" will be on separate permit. | $3,900 |
| Nov 8, 2010 | Completed final sign-off Oct 2012 | 555 California St | office ti on the 45th fl incl. new walls, finishes, ceiling work n stair infill and associated mech. and elec. work.Details
office ti on the 45th fl incl. new walls, finishes, ceiling work n stair infill and associated mech. and elec. work. | $1,923,305 |
| Mar 23, 2009 | Completed final sign-off Jan 2010 | 275 Battery St | demo of (e) non-structural partitions, clgs. & light fix. & finishes, demo of convience/interconnecting stairway w/ infill of conc. flr. slab @ this location. assoc. mech., elec., & life safety mod. under separate permit. restrm. upgrade on 29th. flr. consist of relocatin toilet partitios to widen aDetails
demo of (e) non-structural partitions, clgs. & light fix. & finishes, demo of convience/interconnecting stairway w/ infill of conc. flr. slab @ this location. assoc. mech., elec., & life safety mod. under separate permit. restrm. upgrade on 29th. flr. consist of relocatin toilet partitios to widen a | $30,000 |
| Oct 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of recordDetails
this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of record | $225,000 |
| Jul 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.)Details
ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.) | $150,000 |
| Oct 24, 2007 | Completed final sign-off Nov 2009 | 640 Sutter St | work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing.Details
work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing. | $3,000 |
| Mar 14, 2007 | Completed final sign-off Aug 2008 | 1201 Ortega St | basement 1st and 2nd floor; demo, remodel and restoration of interior space at 1st and 2nd floor;basement scope update toilet room accessories and remodel of exit stair to meet curent bldg code requiremnt. sets include bldg architecturals structural electrical t-24Details
basement 1st and 2nd floor; demo, remodel and restoration of interior space at 1st and 2nd floor;basement scope update toilet room accessories and remodel of exit stair to meet curent bldg code requiremnt. sets include bldg architecturals structural electrical t-24 | $1,200,000 |
| Sep 8, 2006 | Never finaled issued Feb 2007, no final | 201 Mission St | demolish (e) finishes, communicating stair, portion of storefront, selected lighting, etc. build back new finishes, portion of storefront, sanitary facilities, water features, sidewalk, lighting. re-work hvac, lifesafety, fire sprinklers as required. scope of work limited to basemnt, 1st & 2nd floorDetails
demolish (e) finishes, communicating stair, portion of storefront, selected lighting, etc. build back new finishes, portion of storefront, sanitary facilities, water features, sidewalk, lighting. re-work hvac, lifesafety, fire sprinklers as required. scope of work limited to basemnt, 1st & 2nd floor | $4,000,000 |
| Aug 19, 2004 | Completed final sign-off Jun 2005 | 560 Mission St | rev. to structural - ref. pa#2004/05/27/5041 for stair per b. guitronDetails
rev. to structural - ref. pa#2004/05/27/5041 for stair per b. guitron | |
| May 27, 2004 | Completed final sign-off Jun 2005 | 560 Mission St | 27th & 28th/f- stair,unendosed between 27th & 28th floors- communicating stairs only (not for exitinDetails
27th & 28th/f- stair,unendosed between 27th & 28th floors- communicating stairs only (not for exitin | $120,000 |
| Jan 7, 2004 | Expired or cancelled expired Jul 2006 | 1 Market St | interconnecting stair between floors 31 & 32 w/same tenant, t.i. & ada are under separate oti permitDetails
interconnecting stair between floors 31 & 32 w/same tenant, t.i. & ada are under separate oti permit | $100,000 |
| Oct 17, 2003 | Completed final sign-off Jul 2004 | 560 Mission St | structural - intervening stair- between 30 th & 31st floors ref #30/f 2003/10/15/7478Details
structural - intervening stair- between 30 th & 31st floors ref #30/f 2003/10/15/7478 | $90,000 |
| Nov 13, 2002 | Completed final sign-off Jan 2003 | 1399 Mcallister St | emergency shoring of staircase- separate permit for permanent repairDetails
emergency shoring of staircase- separate permit for permanent repair | $1,000 |