Jan 23, 2007Expired or cancelled
cancelled Sep 2007
560 Mission Stapplication for site permit to confirm that code section 1120b.1 exception 2 applies to installing a non accessible mezzanine of no more than 25% of total seating area that one exit is required from the mezzanine with an occupant load of less than 50 per table 10a. no work under this permit
Details
Permit
200701232293
Status
cancelled
Filed
Jan 23, 2007
Address
560 Mission St

application for site permit to confirm that code section 1120b.1 exception 2 applies to installing a non accessible mezzanine of no more than 25% of total seating area that one exit is required from the mezzanine with an occupant load of less than 50 per table 10a. no work under this permit

Open the permit page

Jan 11, 2007Completed
final sign-off Apr 2007
560 Mission StRedwood Electric Group Incoti-2, jp morgan, 3rd floor, ls
Details
Permit
200701111484
Status
complete
Filed
Jan 11, 2007
Permit issued
Jan 11, 2007
Final sign-off
Apr 13, 2007
Declared cost
$26,000
Address
560 Mission St

oti-2, jp morgan, 3rd floor, ls

Open the permit page

$26,000
Dec 19, 2006Expired or cancelled
expired Apr 2008
560 Mission StRfi Enterprises Inc.replacement of electrinic access control devices (cared reader) on 14th, 15th 16th & 17th floors.
Details
Permit
200612190140
Status
expired
Filed
Dec 19, 2006
Permit issued
Dec 19, 2006
Declared cost
$4,000
Address
560 Mission St

replacement of electrinic access control devices (cared reader) on 14th, 15th 16th & 17th floors.

Open the permit page

$4,000
Nov 17, 2006Completed
final sign-off Apr 2007
560 Mission Stoti-2 rev. 3rd floor, el, me
Details
Permit
200611178046
Status
complete
Filed
Nov 17, 2006
Permit issued
Nov 17, 2006
Final sign-off
Apr 13, 2007
Address
560 Mission St

oti-2 rev. 3rd floor, el, me

Open the permit page

Nov 17, 2006Completed
final sign-off Apr 2007
560 Mission Stoti-1 rev. el, me 3rd floor
Details
Permit
200611178044
Status
complete
Filed
Nov 17, 2006
Permit issued
Nov 17, 2006
Final sign-off
Apr 13, 2007
Address
560 Mission St

oti-1 rev. el, me 3rd floor

Open the permit page

Nov 9, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-3, 3rd floor, sp.
Details
Permit
200611097306
Status
complete
Filed
Nov 9, 2006
Permit issued
Nov 9, 2006
Final sign-off
Apr 13, 2007
Declared cost
$30,041
Address
560 Mission St

oti-3, 3rd floor, sp.

Open the permit page

$30,041
Oct 16, 2006Completed
final sign-off Apr 2007
560 Mission Stoti-1, 3rd floor, me, el, sp. ls.
Details
Permit
200610165128
Status
complete
Filed
Oct 16, 2006
Permit issued
Nov 9, 2006
Final sign-off
Apr 13, 2007
Declared cost
$260,000
Address
560 Mission St

oti-1, 3rd floor, me, el, sp. ls.

Open the permit page

$260,000
Oct 16, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-2: me, el, ls, 3rd floor
Details
Permit
200610165132
Status
complete
Filed
Oct 16, 2006
Permit issued
Nov 9, 2006
Final sign-off
Apr 13, 2007
Declared cost
$190,000
Address
560 Mission St

oti-2: me, el, ls, 3rd floor

Open the permit page

$190,000
Sep 26, 2006Completed
final sign-off Nov 2006
560 Mission StCapitol Electric Constrelocate two (2) existing strobe lights
Details
Permit
200609263297
Status
complete
Filed
Sep 26, 2006
Permit issued
Sep 26, 2006
Final sign-off
Nov 8, 2006
Declared cost
$800
Address
560 Mission St

relocate two (2) existing strobe lights

Open the permit page

$800
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StRedwood Electric Group Incoti-2, 18th floor, ls.
Details
Permit
200609111871
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 4, 2006
Final sign-off
Apr 13, 2007
Declared cost
$15,000
Address
560 Mission St

oti-2, 18th floor, ls.

Open the permit page

$15,000
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StRedwood Electric Group Incoti-3, 19th floor, ls.
Details
Permit
200609111869
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 18, 2006
Final sign-off
Apr 16, 2007
Declared cost
$30,000
Address
560 Mission St

oti-3, 19th floor, ls.

Open the permit page

$30,000
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-4, 2nd floor, sp.
Details
Permit
200609111911
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 4, 2006
Final sign-off
Apr 13, 2007
Declared cost
$20,000
Address
560 Mission St

oti-4, 2nd floor, sp.

Open the permit page

$20,000
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-4 19th fl, sp
Details
Permit
200609111908
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 4, 2006
Final sign-off
Apr 16, 2007
Declared cost
$20,000
Address
560 Mission St

oti-4 19th fl, sp

Open the permit page

$20,000
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StRedwood Electric Group Incoti-3, 2nd floor, ls.
Details
Permit
200609111866
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 4, 2006
Final sign-off
Apr 13, 2007
Declared cost
$15,000
Address
560 Mission St

oti-3, 2nd floor, ls.

Open the permit page

$15,000
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-4, 5th floor, sp.
Details
Permit
200609111904
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 18, 2006
Final sign-off
Apr 20, 2007
Declared cost
$20,412
Address
560 Mission St

oti-4, 5th floor, sp.

Open the permit page

$20,412
Sep 11, 2006Completed
final sign-off Apr 2007
560 Mission StRedwood Electric Group Incoti-2, 5th floor, ls.
Details
Permit
200609111870
Status
complete
Filed
Sep 11, 2006
Permit issued
Oct 18, 2006
Final sign-off
Apr 20, 2007
Declared cost
$30,000
Address
560 Mission St

oti-2, 5th floor, ls.

Open the permit page

$30,000
Sep 7, 2006Completed
final sign-off Apr 2007
560 Mission StAyoob & Peery Plumbing Co Increlocate fire sprinklers for ti, 10 heads
Details
Permit
200609071580
Status
complete
Filed
Sep 7, 2006
Permit issued
Sep 7, 2006
Final sign-off
Apr 13, 2007
Declared cost
$1,450
Address
560 Mission St

relocate fire sprinklers for ti, 10 heads

Open the permit page

$1,450
Aug 3, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-1, 3rd floor, el, me, ls, sp.
Details
Permit
200608038468
Status
complete
Filed
Aug 3, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 13, 2007
Declared cost
$93,600
Address
560 Mission St

oti-1, 3rd floor, el, me, ls, sp.

Open the permit page

$93,600
Jul 11, 2006Expired or cancelled
withdrawn Dec 2006
560 Mission Stpartiao floor remodel, ech + elec. work no plumbing , partial floor remodel 11,902sf
Details
Permit
200607116173
Status
withdrawn
Filed
Jul 11, 2006
Declared cost
$595,100
Address
560 Mission St

partiao floor remodel, ech + elec. work no plumbing , partial floor remodel 11,902sf

Open the permit page

$595,100
Jul 11, 2006Completed
final sign-off Nov 2006
560 Mission StSkyline Constructionsprinkler work 5 relocates. no increase in office space.
Details
Permit
200607116183
Status
complete
Filed
Jul 11, 2006
Permit issued
Jul 11, 2006
Final sign-off
Nov 8, 2006
Declared cost
$2,200
Address
560 Mission St

sprinkler work 5 relocates. no increase in office space.

Open the permit page

$2,200
Jun 30, 2006Expired or cancelled
expired Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-1, 6th floor, el, me, ls, sp.
Details
Permit
200606305447
Status
expired
Filed
Jun 30, 2006
Permit issued
Aug 3, 2006
Declared cost
$273,990
Address
560 Mission St

oti-1, 6th floor, el, me, ls, sp.

Open the permit page

$273,990
Jun 30, 2006Expired or cancelled
expired Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-2, 6th floor, el, me.
Details
Permit
200606305448
Status
expired
Filed
Jun 30, 2006
Permit issued
Aug 3, 2006
Declared cost
$182,660
Address
560 Mission St

oti-2, 6th floor, el, me.

Open the permit page

$182,660
Jun 28, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-1, 19th floor, el, me, ls, sp.
Details
Permit
200606285253
Status
complete
Filed
Jun 28, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 16, 2007
Declared cost
$362,970
Address
560 Mission St

oti-1, 19th floor, el, me, ls, sp.

Open the permit page

$362,970
Jun 28, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-2, 19th floor, el, me.
Details
Permit
200606285256
Status
complete
Filed
Jun 28, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 16, 2007
Declared cost
$241,980
Address
560 Mission St

oti-2, 19th floor, el, me.

Open the permit page

$241,980
Jun 27, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-2, 5th floor, el, me.
Details
Permit
200606275103
Status
complete
Filed
Jun 27, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 20, 2007
Declared cost
$324,320
Address
560 Mission St

oti-2, 5th floor, el, me.

Open the permit page

$324,320
Jun 27, 2006Completed
final sign-off Nov 2006
560 Mission StSkyline Construction10th floor - demo wall - door of office construct new walls & doors.
Details
Permit
200606275138
Status
complete
Filed
Jun 27, 2006
Permit issued
Jul 18, 2006
Final sign-off
Nov 8, 2006
Declared cost
$35,000
Address
560 Mission St

10th floor - demo wall - door of office construct new walls & doors.

Open the permit page

$35,000
Jun 27, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-1 5th floor lght, l/s, spk
Details
Permit
200606275101
Status
complete
Filed
Jun 27, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 20, 2007
Declared cost
$486,480
Address
560 Mission St

oti-1 5th floor lght, l/s, spk

Open the permit page

$486,480
Jun 27, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-2, 2nd floor, el, me.
Details
Permit
200606275099
Status
complete
Filed
Jun 27, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 13, 2007
Declared cost
$134,100
Address
560 Mission St

oti-2, 2nd floor, el, me.

Open the permit page

$134,100
Jun 27, 2006Completed
final sign-off Apr 2007
560 Mission StHathaway Dinwiddie Co.oti-1, 2nd floor, el, me, ls, sp.
Details
Permit
200606275096
Status
complete
Filed
Jun 27, 2006
Permit issued
Aug 3, 2006
Final sign-off
Apr 13, 2007
Declared cost
$201,150
Address
560 Mission St

oti-1, 2nd floor, el, me, ls, sp.

Open the permit page

$201,150
Jun 6, 2006Completed
final sign-off Dec 2006
560 Mission Strevision to appl#200604249743 sheet affected, 21a-2.0 & 21a-3.0 (change in light fixtures, change in server closet rating)
Details
Permit
200606063338
Status
complete
Filed
Jun 6, 2006
Permit issued
Jun 6, 2006
Final sign-off
Dec 13, 2006
Address
560 Mission St

revision to appl#200604249743 sheet affected, 21a-2.0 & 21a-3.0 (change in light fixtures, change in server closet rating)

Open the permit page

May 24, 2006Completed
final sign-off Dec 2006
560 Mission StRedwood Electric Group Incaddition of fire alarm notification devices to (e) fire alarm system: addition of 1 mew auxiliary power supply, 5 new speaker strobes, 1 new control module, 1 new monitor module, 1 new sync module
Details
Permit
200605242336
Status
complete
Filed
May 24, 2006
Permit issued
May 24, 2006
Final sign-off
Dec 13, 2006
Declared cost
$8,500
Address
560 Mission St

addition of fire alarm notification devices to (e) fire alarm system: addition of 1 mew auxiliary power supply, 5 new speaker strobes, 1 new control module, 1 new monitor module, 1 new sync module

Open the permit page

$8,500
May 18, 2006Completed
final sign-off Dec 2006
560 Mission StTurner Construction Co21st floor. sprinkler 37 relocates, 7 removed.
Details
Permit
200605181883
Status
complete
Filed
May 18, 2006
Permit issued
May 18, 2006
Final sign-off
Dec 13, 2006
Declared cost
$5,900
Address
560 Mission St

21st floor. sprinkler 37 relocates, 7 removed.

Open the permit page

$5,900
May 10, 2006Completed
final sign-off Apr 2007
560 Mission Sttenant improvement - 858 sq ft, remainder to stay as is. addition of 6 offices
Details
Permit
200605101281
Status
complete
Filed
May 10, 2006
Permit issued
May 10, 2006
Final sign-off
Apr 13, 2007
Declared cost
$30,000
Address
560 Mission St

tenant improvement - 858 sq ft, remainder to stay as is. addition of 6 offices

Open the permit page

$30,000
Apr 24, 2006Completed
final sign-off Dec 2006
560 Mission St1st time, tenant, 21st floor. commercial construction. new gyp. bd. walls to create private offices, conf. room, break room & copy room. new doors, frames & sidelights. new millwork; new ceiling & lighting; electrical & date outlets. new carpet & paint.
Details
Permit
200604249743
Status
complete
Filed
Apr 24, 2006
Permit issued
Apr 24, 2006
Final sign-off
Dec 13, 2006
Declared cost
$220,000
Address
560 Mission St

1st time, tenant, 21st floor. commercial construction. new gyp. bd. walls to create private offices, conf. room, break room & copy room. new doors, frames & sidelights. new millwork; new ceiling & lighting; electrical & date outlets. new carpet & paint.

Open the permit page

$220,000
Jan 13, 2006Never finaled
issued Jan 2006, no final
560 Mission StRedwood Electric Group Inc11th floor - add 1 strobe per fire inspector request. ref permit 200508261307 & 200512281169.
Details
Permit
200601132096
Status
issued
Filed
Jan 13, 2006
Permit issued
Jan 13, 2006
Declared cost
$350
Address
560 Mission St

11th floor - add 1 strobe per fire inspector request. ref permit 200508261307 & 200512281169.

Open the permit page

$350
Jan 13, 2006Completed
final sign-off Feb 2006
560 Mission StRedwood Electric Group Incsubmit as-built corrections of matrix. ref permit 200512281172 & 200509142824.
Details
Permit
200601132094
Status
complete
Filed
Jan 13, 2006
Permit issued
Jan 13, 2006
Final sign-off
Feb 3, 2006
Address
560 Mission St

submit as-built corrections of matrix. ref permit 200512281172 & 200509142824.

Open the permit page

Dec 28, 2005Completed
final sign-off Feb 2006
560 Mission StRedwood Electric Group Incadd (1) one smoke det & (1) one speaker per fire insp. also modify matrix per insp. "as built" #200509142824.
Details
Permit
200512281172
Status
complete
Filed
Dec 28, 2005
Permit issued
Dec 28, 2005
Final sign-off
Feb 3, 2006
Declared cost
$800
Address
560 Mission St

add (1) one smoke det & (1) one speaker per fire insp. also modify matrix per insp. "as built" #200509142824.

Open the permit page

$800
Dec 28, 2005Expired or cancelled
expired Aug 2006
560 Mission StRedwood Electric Group Incchange to originally submitted drawings. add (1) one visual device in new conference room. do not relocate (2) two existing devices as previouly submitted. "as built" #200508261307 rev.
Details
Permit
200512281169
Status
expired
Filed
Dec 28, 2005
Permit issued
Dec 28, 2005
Address
560 Mission St

change to originally submitted drawings. add (1) one visual device in new conference room. do not relocate (2) two existing devices as previouly submitted. "as built" #200508261307 rev.

Open the permit page

Nov 23, 2005Never finaled
issued Nov 2005, no final
560 Mission Stconstruct 6-chair barbershop with reception area, waiting area and hair wash/finish plmb will include 1 bar sink, 2 hairwash stations/finish electrical will be limited to lighting/fisnish architectural , will include casework, drop ceiling and same softing/access to ext ada (t-24) compliant restroom
Details
Permit
200511238903
Status
issued
Filed
Nov 23, 2005
Permit issued
Nov 23, 2005
Declared cost
$82,500
Address
560 Mission St

construct 6-chair barbershop with reception area, waiting area and hair wash/finish plmb will include 1 bar sink, 2 hairwash stations/finish electrical will be limited to lighting/fisnish architectural , will include casework, drop ceiling and same softing/access to ext ada (t-24) compliant restroom

Open the permit page

$82,500
Nov 1, 2005Expired or cancelled
expired May 2007
560 Mission StRfi Enterprises Inc.access upgrade for 17th fl., release pull station for passenger & freight elevator lobbies & signage.
Details
Permit
200511017070
Status
expired
Filed
Nov 1, 2005
Permit issued
Nov 1, 2005
Declared cost
$12,000
Address
560 Mission St

access upgrade for 17th fl., release pull station for passenger & freight elevator lobbies & signage.

Open the permit page

$12,000
Oct 6, 2005Completed
final sign-off Jan 2006
560 Mission StRedwood Electric Group Incfire/life safety system tenant improvement . installation of audible/visual devices. appox-10
Details
Permit
200510064952
Status
complete
Filed
Oct 6, 2005
Permit issued
Oct 6, 2005
Final sign-off
Jan 23, 2006
Declared cost
$28,897
Address
560 Mission St

fire/life safety system tenant improvement . installation of audible/visual devices. appox-10

Open the permit page

$28,897
Sep 20, 2005Expired or cancelled
expired Aug 2006
560 Mission StAyoob & Peery Plumbing Co Incfire sprinkler. t.i. relocated / added heads. 37 heads. 8 new & 29 relocate.
Details
Permit
200509203400
Status
expired
Filed
Sep 20, 2005
Permit issued
Oct 11, 2005
Declared cost
$7,000
Address
560 Mission St

fire sprinkler. t.i. relocated / added heads. 37 heads. 8 new & 29 relocate.

Open the permit page

$7,000
Sep 19, 2005Completed
final sign-off Mar 2006
560 Mission StTurner Construction Cosprinklers - 88 adds - 150 relocates and 15 plugs
Details
Permit
200509193222
Status
complete
Filed
Sep 19, 2005
Permit issued
Sep 19, 2005
Final sign-off
Mar 3, 2006
Declared cost
$50,000
Address
560 Mission St

sprinklers - 88 adds - 150 relocates and 15 plugs

Open the permit page

$50,000
Sep 15, 2005Completed
final sign-off Nov 2005
560 Mission StBcci Construction Companysprinklers 88 adds - 150 relocates and 15 plugs
Details
Permit
200509153032
Status
complete
Filed
Sep 15, 2005
Permit issued
Sep 15, 2005
Final sign-off
Nov 17, 2005
Declared cost
$7,400
Address
560 Mission St

sprinklers 88 adds - 150 relocates and 15 plugs

Open the permit page

$7,400
Sep 14, 2005Completed
final sign-off Feb 2006
560 Mission StRedwood Electric Group Increlocation & addition of fire / life safety system devices to provide code compliant coverage based
Details
Permit
200509142824
Status
complete
Filed
Sep 14, 2005
Permit issued
Sep 14, 2005
Final sign-off
Feb 3, 2006
Declared cost
$21,218
Address
560 Mission St

relocation & addition of fire / life safety system devices to provide code compliant coverage based

Open the permit page

$21,218
Sep 14, 2005Completed
final sign-off Mar 2006
560 Mission StRedwood Electric Group Inc25th floor - relocation & addition of fire / life safety system devices to provide code compliant coverage based
Details
Permit
200509142823
Status
complete
Filed
Sep 14, 2005
Permit issued
Nov 10, 2005
Final sign-off
Mar 3, 2006
Declared cost
$34,812
Address
560 Mission St

25th floor - relocation & addition of fire / life safety system devices to provide code compliant coverage based

Open the permit page

$34,812
Sep 8, 2005Completed
final sign-off Jan 2006
560 Mission StR L H Fire Protection Incfire sprinkler t/i for 17th floor
Details
Permit
200509082245
Status
complete
Filed
Sep 8, 2005
Permit issued
Sep 8, 2005
Final sign-off
Jan 19, 2006
Declared cost
$11,900
Address
560 Mission St

fire sprinkler t/i for 17th floor

Open the permit page

$11,900
Aug 26, 2005Never finaled
issued Aug 2005, no final
560 Mission StRedwood Electric Group Increlocation of (e) fire alarm devices, & addition of 1 audible / visaul device to provide code
Details
Permit
200508261307
Status
issued
Filed
Aug 26, 2005
Permit issued
Aug 26, 2005
Declared cost
$6,000
Address
560 Mission St

relocation of (e) fire alarm devices, & addition of 1 audible / visaul device to provide code

Open the permit page

$6,000
Aug 25, 2005Completed
final sign-off Nov 2005
560 Mission StBcci Construction Companyoti-2, 28th floor el, me.
Details
Permit
200508251223
Status
complete
Filed
Aug 25, 2005
Permit issued
Oct 27, 2005
Final sign-off
Nov 17, 2005
Declared cost
$120,000
Address
560 Mission St

oti-2, 28th floor el, me.

Open the permit page

$120,000
Aug 24, 2005Completed
final sign-off Jan 2006
560 Mission StBcci Construction Companyoti-1, 28th floor, el, me, ls, sp.
Details
Permit
200508241139
Status
complete
Filed
Aug 24, 2005
Permit issued
Sep 8, 2005
Final sign-off
Jan 23, 2006
Declared cost
$123,525
Address
560 Mission St

oti-1, 28th floor, el, me, ls, sp.

Open the permit page

$123,525
Aug 17, 2005Completed
final sign-off Mar 2006
560 Mission Stoti-2, 25th floor, el, me.
Details
Permit
200508170447
Status
complete
Filed
Aug 17, 2005
Permit issued
Sep 20, 2005
Final sign-off
Mar 3, 2006
Declared cost
$135,000
Address
560 Mission St

oti-2, 25th floor, el, me.

Open the permit page

$135,000
Aug 15, 2005Completed
final sign-off Mar 2006
560 Mission Sttenant improvements- reinforce existing floor slab for new file system. sprinklers under sep permit
Details
Permit
200508150243
Status
complete
Filed
Aug 15, 2005
Permit issued
Sep 20, 2005
Final sign-off
Mar 3, 2006
Declared cost
$45,000
Address
560 Mission St

tenant improvements- reinforce existing floor slab for new file system. sprinklers under sep permit

Open the permit page

$45,000
Aug 10, 2005Never finaled
issued Aug 2005, no final
560 Mission StGci, Incoti-3,11th/fl -sp.
Details
Permit
200508109902
Status
issued
Filed
Aug 10, 2005
Permit issued
Aug 10, 2005
Declared cost
$50,000
Address
560 Mission St

oti-3,11th/fl -sp.

Open the permit page

$50,000
Jul 27, 2005Completed
final sign-off Mar 2006
560 Mission Stoti-1 25th/fl-el,me, ls, sp.
Details
Permit
200507278722
Status
complete
Filed
Jul 27, 2005
Permit issued
Jul 27, 2005
Final sign-off
Mar 3, 2006
Declared cost
$425,000
Address
560 Mission St

oti-1 25th/fl-el,me, ls, sp.

Open the permit page

$425,000
Jul 1, 2005Never finaled
issued Jul 2005, no final
560 Mission StGci, Incoti-2 11th floor, el, me
Details
Permit
200507016704
Status
issued
Filed
Jul 1, 2005
Permit issued
Jul 25, 2005
Declared cost
$42,000
Address
560 Mission St

oti-2 11th floor, el, me

Open the permit page

$42,000
Jul 1, 2005Never finaled
issued Jul 2005, no final
560 Mission StGci, Incoti-1 11thh floor, el, me, ls, sp
Details
Permit
200507016701
Status
issued
Filed
Jul 1, 2005
Permit issued
Jul 25, 2005
Declared cost
$52,000
Address
560 Mission St

oti-1 11thh floor, el, me, ls, sp

Open the permit page

$52,000
Jun 30, 2005Completed
final sign-off Feb 2006
560 Mission Stoti-1, 17th floor, el, me, ls, sp.
Details
Permit
200506306440
Status
complete
Filed
Jun 30, 2005
Permit issued
Sep 6, 2005
Final sign-off
Feb 3, 2006
Declared cost
$700,000
Address
560 Mission St

oti-1, 17th floor, el, me, ls, sp.

Open the permit page

$700,000
Jun 30, 2005Completed
final sign-off Feb 2006
560 Mission Stoti-2, 17th floor, el, me.
Details
Permit
200506306438
Status
complete
Filed
Jun 30, 2005
Permit issued
Sep 6, 2005
Final sign-off
Feb 3, 2006
Declared cost
$350,000
Address
560 Mission St

oti-2, 17th floor, el, me.

Open the permit page

$350,000
May 5, 2005Completed
final sign-off Aug 2005
560 Mission StRedwood Electric Group Incinstallation of: (19) smoke detectors, (1) duct smoke detector, (21) speaker strobes, (1) strobe,
Details
Permit
200505051641
Status
complete
Filed
May 5, 2005
Permit issued
May 31, 2005
Final sign-off
Aug 26, 2005
Declared cost
$30,000
Address
560 Mission St

installation of: (19) smoke detectors, (1) duct smoke detector, (21) speaker strobes, (1) strobe,

Open the permit page

$30,000
May 5, 2005Completed
final sign-off Jun 2005
560 Mission StRedwood Electric Group Incinstallation of: (1) smoke detector,strobe sync module, (4) relay modules, (2) strobes, (10) speake
Details
Permit
200505051643
Status
complete
Filed
May 5, 2005
Permit issued
May 31, 2005
Final sign-off
Jun 8, 2005
Declared cost
$10,000
Address
560 Mission St

installation of: (1) smoke detector,strobe sync module, (4) relay modules, (2) strobes, (10) speake

Open the permit page

$10,000
Apr 19, 2005Completed
final sign-off Aug 2005
560 Mission StField Construction Inc.oti-3, 26th floor, sp.
Details
Permit
200504190342
Status
complete
Filed
Apr 19, 2005
Permit issued
May 20, 2005
Final sign-off
Aug 26, 2005
Address
560 Mission St

oti-3, 26th floor, sp.

Open the permit page

Apr 12, 2005Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-3 29/fl. sp
Details
Permit
200504129781
Status
complete
Filed
Apr 12, 2005
Permit issued
Apr 12, 2005
Final sign-off
Jun 8, 2005
Declared cost
$11,000
Address
560 Mission St

oti-3 29/fl. sp

Open the permit page

$11,000
Mar 15, 2005Completed
final sign-off Aug 2005
560 Mission StField Construction Inc.oti-1, 26th floor, el, me, ls, sp.
Details
Permit
200503157552
Status
complete
Filed
Mar 15, 2005
Permit issued
Mar 30, 2005
Final sign-off
Aug 26, 2005
Declared cost
$485,000
Address
560 Mission St

oti-1, 26th floor, el, me, ls, sp.

Open the permit page

$485,000
Mar 15, 2005Completed
final sign-off Aug 2005
560 Mission StField Construction Inc.oti-2, 26th floor, el, me.
Details
Permit
200503157558
Status
complete
Filed
Mar 15, 2005
Permit issued
May 10, 2005
Final sign-off
Aug 26, 2005
Declared cost
$470,000
Address
560 Mission St

oti-2, 26th floor, el, me.

Open the permit page

$470,000
Feb 24, 2005Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-2 29/f -el, me
Details
Permit
200502246125
Status
complete
Filed
Feb 24, 2005
Permit issued
Apr 5, 2005
Final sign-off
Jun 8, 2005
Declared cost
$133,334
Address
560 Mission St

oti-2 29/f -el, me

Open the permit page

$133,334
Feb 24, 2005Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-1 29/f, el, me, ls, sp
Details
Permit
200502246122
Status
complete
Filed
Feb 24, 2005
Permit issued
Apr 5, 2005
Final sign-off
Jun 8, 2005
Declared cost
$133,334
Address
560 Mission St

oti-1 29/f, el, me, ls, sp

Open the permit page

$133,334
Jan 24, 2005Completed
final sign-off Apr 2005
560 Mission StRedwood Electric Group Incinstallation of additional fire alarm devices as required by 1st floor t.i. 18 devices total.
Details
Permit
200501243801
Status
complete
Filed
Jan 24, 2005
Permit issued
Feb 9, 2005
Final sign-off
Apr 5, 2005
Declared cost
$12,000
Address
560 Mission St

installation of additional fire alarm devices as required by 1st floor t.i. 18 devices total.

Open the permit page

$12,000
Jan 6, 2005Completed
final sign-off Apr 2005
560 Mission StR L H Fire Protection Inccorrect fire sprinkler deficencies per sffd on g/f. add 16, relocate 5
Details
Permit
200501062647
Status
complete
Filed
Jan 6, 2005
Permit issued
Jan 6, 2005
Final sign-off
Apr 5, 2005
Declared cost
$4,500
Address
560 Mission St

correct fire sprinkler deficencies per sffd on g/f. add 16, relocate 5

Open the permit page

$4,500
Nov 4, 2004Completed
final sign-off May 2005
560 Mission Stnew high rise office bldg/new deli/ground floor tenant improvement interior only full sprinklered
Details
Permit
200411048537
Status
complete
Filed
Nov 4, 2004
Permit issued
Nov 4, 2004
Final sign-off
May 13, 2005
Declared cost
$150,000
Address
560 Mission St

new high rise office bldg/new deli/ground floor tenant improvement interior only full sprinklered

Open the permit page

$150,000
Oct 18, 2004Expired or cancelled
expired Aug 2006
560 Mission StRedwood Electric Group Incinstallation of 3 strobes/3 speaker/strobes/5 smoke detectors on floors 2,3,5,7, & 19
Details
Permit
200410187001
Status
expired
Filed
Oct 18, 2004
Permit issued
Nov 17, 2004
Declared cost
$6,000
Address
560 Mission St

installation of 3 strobes/3 speaker/strobes/5 smoke detectors on floors 2,3,5,7, & 19

Open the permit page

$6,000
Sep 15, 2004Completed
final sign-off Jun 2005
560 Mission StRedwood Electric Group Incinstall: 10 smoke detectors, 1 relay module, 2 strobes, 3 speaker strobes, 1 sync module, 4 magnetic
Details
Permit
200409154164
Status
complete
Filed
Sep 15, 2004
Permit issued
Sep 15, 2004
Final sign-off
Jun 8, 2005
Declared cost
$12,000
Address
560 Mission St

install: 10 smoke detectors, 1 relay module, 2 strobes, 3 speaker strobes, 1 sync module, 4 magnetic

Open the permit page

$12,000
Sep 9, 2004Completed
final sign-off Mar 2005
560 Mission StRedwood Electric Group Inc1/f- install 2 speaker/strobes & 1 strobe
Details
Permit
200409093685
Status
complete
Filed
Sep 9, 2004
Permit issued
Sep 9, 2004
Final sign-off
Mar 9, 2005
Declared cost
$2,000
Address
560 Mission St

1/f- install 2 speaker/strobes & 1 strobe

Open the permit page

$2,000
Sep 8, 2004Expired or cancelled
expired Aug 2006
560 Mission StR L H Fire Protection Inccorrect fire sprinkler deficiencies per sffd on 5th fl. add 2 relocate 2.
Details
Permit
200409083594
Status
expired
Filed
Sep 8, 2004
Permit issued
Sep 8, 2004
Declared cost
$800
Address
560 Mission St

correct fire sprinkler deficiencies per sffd on 5th fl. add 2 relocate 2.

Open the permit page

$800
Aug 26, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-1 28th floor, sp only
Details
Permit
200408262617
Status
complete
Filed
Aug 26, 2004
Permit issued
Aug 26, 2004
Final sign-off
Jun 8, 2005
Declared cost
$4,400
Address
560 Mission St

oti-1 28th floor, sp only

Open the permit page

$4,400
Aug 19, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Corev. to structural - ref. pa#2004/05/27/5041 for stair per b. guitron
Details
Permit
200408192056
Status
complete
Filed
Aug 19, 2004
Permit issued
Oct 14, 2004
Final sign-off
Jun 8, 2005
Address
560 Mission St

rev. to structural - ref. pa#2004/05/27/5041 for stair per b. guitron

Open the permit page

Aug 18, 2004Completed
final sign-off May 2005
560 Mission StRedwood Electric Group Inc14th floor - install (8) notification devices.relocate (13) notification devices.
Details
Permit
200408181863
Status
complete
Filed
Aug 18, 2004
Permit issued
Sep 15, 2004
Final sign-off
May 31, 2005
Declared cost
$25,000
Address
560 Mission St

14th floor - install (8) notification devices.relocate (13) notification devices.

Open the permit page

$25,000
Aug 18, 2004Completed
final sign-off May 2005
560 Mission StRedwood Electric Group Inc16 fl-instl 9 new notification devices,14 notif dev,2 smoke detec,3relay modules,5 mointor modules.
Details
Permit
200408181864
Status
complete
Filed
Aug 18, 2004
Permit issued
Sep 15, 2004
Final sign-off
May 31, 2005
Declared cost
$35,000
Address
560 Mission St

16 fl-instl 9 new notification devices,14 notif dev,2 smoke detec,3relay modules,5 mointor modules.

Open the permit page

$35,000
Aug 18, 2004Expired or cancelled
expired Aug 2006
560 Mission StTurner Construction Cofl 14, 15 & 16. structural in association with ref#200405194285/200405194284/200405194281
Details
Permit
200408181856
Status
expired
Filed
Aug 18, 2004
Permit issued
Nov 1, 2004
Declared cost
$500
Address
560 Mission St

fl 14, 15 & 16. structural in association with ref#200405194285/200405194284/200405194281

Open the permit page

$500
Aug 18, 2004Completed
final sign-off May 2005
560 Mission StRedwood Electric Group Incinstall (5) new notification devices relo (10) existing notification devices.
Details
Permit
200408181862
Status
complete
Filed
Aug 18, 2004
Permit issued
Sep 15, 2004
Final sign-off
May 31, 2005
Declared cost
$15,000
Address
560 Mission St

install (5) new notification devices relo (10) existing notification devices.

Open the permit page

$15,000
Aug 17, 2004Never finaled
issued Aug 2004, no final
560 Mission StRfi Enterprises Inc.card access at elevator lobbies on 14th/15th/16th floors & freight elevators at each floor
Details
Permit
200408171742
Status
issued
Filed
Aug 17, 2004
Permit issued
Aug 17, 2004
Declared cost
$20,000
Address
560 Mission St

card access at elevator lobbies on 14th/15th/16th floors & freight elevators at each floor

Open the permit page

$20,000
Aug 11, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-2 16th floor el me
Details
Permit
200408111317
Status
complete
Filed
Aug 11, 2004
Permit issued
Sep 13, 2004
Final sign-off
May 31, 2005
Declared cost
$444,000
Address
560 Mission St

oti-2 16th floor el me

Open the permit page

$444,000
Aug 11, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-3 14th floor el me
Details
Permit
200408111314
Status
complete
Filed
Aug 11, 2004
Permit issued
Sep 13, 2004
Final sign-off
May 31, 2005
Declared cost
$400,000
Address
560 Mission St

oti-3 14th floor el me

Open the permit page

$400,000
Aug 11, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-3 15th floor me el
Details
Permit
200408111315
Status
complete
Filed
Aug 11, 2004
Permit issued
Sep 13, 2004
Final sign-off
May 31, 2005
Declared cost
$400,000
Address
560 Mission St

oti-3 15th floor me el

Open the permit page

$400,000
Jul 27, 2004Completed
final sign-off Jun 2005
560 Mission StRedwood Electric Group Incaddition of fire alarm device as required by tenant improvements
Details
Permit
200407279898
Status
complete
Filed
Jul 27, 2004
Permit issued
Jul 27, 2004
Final sign-off
Jun 8, 2005
Declared cost
$85,000
Address
560 Mission St

addition of fire alarm device as required by tenant improvements

Open the permit page

$85,000
Jul 27, 2004Completed
final sign-off Jun 2005
560 Mission StRedwood Electric Group Incaddition of fire alarm device as required by tenant improvements
Details
Permit
200407279894
Status
complete
Filed
Jul 27, 2004
Permit issued
Jul 27, 2004
Final sign-off
Jun 8, 2005
Declared cost
$55,000
Address
560 Mission St

addition of fire alarm device as required by tenant improvements

Open the permit page

$55,000
Jul 26, 2004Completed
final sign-off Mar 2005
560 Mission StAllied Fire Protectionmodify existing fire sprinkler system for new tenant on ground floor. relocate 15 sprinklers
Details
Permit
200407269805
Status
complete
Filed
Jul 26, 2004
Permit issued
Jul 26, 2004
Final sign-off
Mar 9, 2005
Declared cost
$3,150
Address
560 Mission St

modify existing fire sprinkler system for new tenant on ground floor. relocate 15 sprinklers

Open the permit page

$3,150
Jul 13, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-2, 27th floor, sp
Details
Permit
200407138658
Status
complete
Filed
Jul 13, 2004
Permit issued
Aug 27, 2004
Final sign-off
Jun 8, 2005
Declared cost
$45,785
Address
560 Mission St

oti-2, 27th floor, sp

Open the permit page

$45,785
Jul 13, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-2, 28th floor, sp
Details
Permit
200407138656
Status
complete
Filed
Jul 13, 2004
Permit issued
Aug 27, 2004
Final sign-off
Jun 8, 2005
Declared cost
$47,610
Address
560 Mission St

oti-2, 28th floor, sp

Open the permit page

$47,610
Jul 7, 2004Completed
final sign-off Mar 2005
560 Mission StTurner Construction Cointerior construction or a hall way & restrooms, consisting of partitions, ceiling, power, lighting
Details
Permit
200407078165
Status
complete
Filed
Jul 7, 2004
Permit issued
Sep 3, 2004
Final sign-off
Mar 9, 2005
Declared cost
$100,000
Address
560 Mission St

interior construction or a hall way & restrooms, consisting of partitions, ceiling, power, lighting

Open the permit page

$100,000
Jun 30, 2004Expired or cancelled
cancelled Jan 2005
560 Mission Stoti-2, 21st floor, el, me.
Details
Permit
200406307698
Status
cancelled
Filed
Jun 30, 2004
Declared cost
$50,575
Address
560 Mission St

oti-2, 21st floor, el, me.

Open the permit page

$50,575
Jun 30, 2004Expired or cancelled
cancelled Jan 2005
560 Mission Stoti-1, 22nd floor, el, me, sp, ls.
Details
Permit
200406307694
Status
cancelled
Filed
Jun 30, 2004
Declared cost
$85,978
Address
560 Mission St

oti-1, 22nd floor, el, me, sp, ls.

Open the permit page

$85,978
Jun 30, 2004Expired or cancelled
cancelled Aug 2005
560 Mission Stoti-1, 21st floor, el, me, sp, ls.
Details
Permit
200406307697
Status
cancelled
Filed
Jun 30, 2004
Declared cost
$101,150
Address
560 Mission St

oti-1, 21st floor, el, me, sp, ls.

Open the permit page

$101,150
Jun 30, 2004Completed
final sign-off Jun 2005
560 Mission Stoti-2 28th floor, el, me
Details
Permit
200406307702
Status
complete
Filed
Jun 30, 2004
Permit issued
Jul 27, 2004
Final sign-off
Jun 8, 2005
Address
560 Mission St

oti-2 28th floor, el, me

Open the permit page

Jun 30, 2004Expired or cancelled
cancelled Jan 2005
560 Mission Stoti-2, 22nd floor, el, me.
Details
Permit
200406307691
Status
cancelled
Filed
Jun 30, 2004
Declared cost
$42,989
Address
560 Mission St

oti-2, 22nd floor, el, me.

Open the permit page

$42,989
Jun 28, 2004Completed
final sign-off Jun 2005
560 Mission Stoti-1, 28th floor, el, me, ls, sp
Details
Permit
200406287425
Status
complete
Filed
Jun 28, 2004
Permit issued
Jul 27, 2004
Final sign-off
Jun 8, 2005
Declared cost
$347,000
Address
560 Mission St

oti-1, 28th floor, el, me, ls, sp

Open the permit page

$347,000
Jun 28, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-2, sp. 14th floor.
Details
Permit
200406287458
Status
complete
Filed
Jun 28, 2004
Permit issued
Aug 18, 2004
Final sign-off
May 31, 2005
Declared cost
$10,000
Address
560 Mission St

oti-2, sp. 14th floor.

Open the permit page

$10,000
Jun 28, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-2, sp. 16th floor.
Details
Permit
200406287459
Status
complete
Filed
Jun 28, 2004
Permit issued
Aug 18, 2004
Final sign-off
May 31, 2005
Declared cost
$10,000
Address
560 Mission St

oti-2, sp. 16th floor.

Open the permit page

$10,000
Jun 28, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-2, me, el, ls. 15th floor.
Details
Permit
200406287454
Status
complete
Filed
Jun 28, 2004
Permit issued
Aug 18, 2004
Final sign-off
May 31, 2005
Declared cost
$10,000
Address
560 Mission St

oti-2, me, el, ls. 15th floor.

Open the permit page

$10,000
Jun 14, 2004Never finaled
issued Jul 2004, no final
560 Mission StTurner Construction Costructural only high density file cabinet floor reinforce and track for curtain wall to be reinforce
Details
Permit
200406146346
Status
issued
Filed
Jun 14, 2004
Permit issued
Jul 16, 2004
Declared cost
$20,000
Address
560 Mission St

structural only high density file cabinet floor reinforce and track for curtain wall to be reinforce

Open the permit page

$20,000
Jun 1, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-2, 28th floor, el, me
Details
Permit
200406015161
Status
complete
Filed
Jun 1, 2004
Permit issued
Jul 16, 2004
Final sign-off
Jun 8, 2005
Declared cost
$100,000
Address
560 Mission St

oti-2, 28th floor, el, me

Open the permit page

$100,000
Jun 1, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-2, 27th floor, el, me
Details
Permit
200406015164
Status
complete
Filed
Jun 1, 2004
Permit issued
Jul 16, 2004
Final sign-off
Jun 8, 2005
Declared cost
$100,000
Address
560 Mission St

oti-2, 27th floor, el, me

Open the permit page

$100,000
May 28, 2004Completed
final sign-off Aug 2004
560 Mission StRedwood Electric Group Incadd (9) smoke detectors in corridors add (2) speaker strobes add (6) strobes relocate (3) speaker
Details
Permit
200405285079
Status
complete
Filed
May 28, 2004
Permit issued
Jun 15, 2004
Final sign-off
Aug 4, 2004
Declared cost
$20,000
Address
560 Mission St

add (9) smoke detectors in corridors add (2) speaker strobes add (6) strobes relocate (3) speaker

Open the permit page

$20,000
May 27, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-1 28th floor el, me, sp, ls
Details
Permit
200405274970
Status
complete
Filed
May 27, 2004
Permit issued
Jul 16, 2004
Final sign-off
Jun 8, 2005
Declared cost
$442,800
Address
560 Mission St

oti-1 28th floor el, me, sp, ls

Open the permit page

$442,800
May 27, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Cooti-1 27th floor el, me, sp, ls
Details
Permit
200405274969
Status
complete
Filed
May 27, 2004
Permit issued
Jul 16, 2004
Final sign-off
Jun 8, 2005
Declared cost
$964,000
Address
560 Mission St

oti-1 27th floor el, me, sp, ls

Open the permit page

$964,000
May 27, 2004Completed
final sign-off Jun 2005
560 Mission StTurner Construction Co27th & 28th/f- stair,unendosed between 27th & 28th floors- communicating stairs only (not for exitin
Details
Permit
200405275041
Status
complete
Filed
May 27, 2004
Permit issued
Jul 23, 2004
Final sign-off
Jun 8, 2005
Declared cost
$120,000
Address
560 Mission St

27th & 28th/f- stair,unendosed between 27th & 28th floors- communicating stairs only (not for exitin

Open the permit page

$120,000
May 25, 2004Completed
final sign-off Aug 2004
560 Mission StTurner Construction Co14/f demo only ref oti-1 2004/05/19/4285 no struct. wrk interior wrk only
Details
Permit
200405254790
Status
complete
Filed
May 25, 2004
Permit issued
May 25, 2004
Final sign-off
Aug 12, 2004
Declared cost
$10,000
Address
560 Mission St

14/f demo only ref oti-1 2004/05/19/4285 no struct. wrk interior wrk only

Open the permit page

$10,000
May 25, 2004Completed
final sign-off Aug 2004
560 Mission StTurner Construction Co16/f- demo only ref. oti-1 200405194281 no structural work
Details
Permit
200405254794
Status
complete
Filed
May 25, 2004
Permit issued
May 25, 2004
Final sign-off
Aug 12, 2004
Declared cost
$10,000
Address
560 Mission St

16/f- demo only ref. oti-1 200405194281 no structural work

Open the permit page

$10,000
May 25, 2004Completed
final sign-off Aug 2004
560 Mission StTurner Construction Co15/f- demo only ref. oti-1 200405194284 no structural work
Details
Permit
200405254795
Status
complete
Filed
May 25, 2004
Permit issued
May 25, 2004
Final sign-off
Aug 12, 2004
Declared cost
$10,000
Address
560 Mission St

15/f- demo only ref. oti-1 200405194284 no structural work

Open the permit page

$10,000
May 24, 2004Completed
final sign-off Aug 2004
560 Mission StR L H Fire Protection Incoti-2, 9th floor, sp
Details
Permit
200405244614
Status
complete
Filed
May 24, 2004
Permit issued
Jun 8, 2004
Final sign-off
Aug 4, 2004
Declared cost
$6,500
Address
560 Mission St

oti-2, 9th floor, sp

Open the permit page

$6,500
May 20, 2004Completed
final sign-off Jul 2004
560 Mission StTurner Construction Corev. to corridor as builts - reference pa#200312222789
Details
Permit
200405204377
Status
complete
Filed
May 20, 2004
Permit issued
May 20, 2004
Final sign-off
Jul 27, 2004
Address
560 Mission St

rev. to corridor as builts - reference pa#200312222789

Open the permit page

May 19, 2004Never finaled
issued Aug 2004, no final
560 Mission StTurner Construction Cooti-1, 16th floor, el, ls, me, sp.
Details
Permit
200405194281
Status
issued
Filed
May 19, 2004
Permit issued
Aug 10, 2004
Declared cost
$600,000
Address
560 Mission St

oti-1, 16th floor, el, ls, me, sp.

Open the permit page

$600,000
May 19, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-1, 14th floor, el, ls, me, sp.
Details
Permit
200405194285
Status
complete
Filed
May 19, 2004
Permit issued
Aug 10, 2004
Final sign-off
May 31, 2005
Declared cost
$600,000
Address
560 Mission St

oti-1, 14th floor, el, ls, me, sp.

Open the permit page

$600,000
May 19, 2004Completed
final sign-off May 2005
560 Mission StTurner Construction Cooti-1, 15th floor, el, ls, me, sp.
Details
Permit
200405194284
Status
complete
Filed
May 19, 2004
Permit issued
Aug 10, 2004
Final sign-off
May 31, 2005
Declared cost
$600,000
Address
560 Mission St

oti-1, 15th floor, el, ls, me, sp.

Open the permit page

$600,000
May 18, 2004Never finaled
issued May 2004, no final
560 Mission Stnew non structural partitions to enclose network backbone on 14/f, 15/f & 16/f
Details
Permit
200405184169
Status
issued
Filed
May 18, 2004
Permit issued
May 18, 2004
Declared cost
$11,000
Address
560 Mission St

new non structural partitions to enclose network backbone on 14/f, 15/f & 16/f

Open the permit page

$11,000
Apr 15, 2004Completed
final sign-off Aug 2004
560 Mission Stoti-1 9/f el,me,ls,sp
Details
Permit
200404151377
Status
complete
Filed
Apr 15, 2004
Permit issued
May 4, 2004
Final sign-off
Aug 4, 2004
Declared cost
$183,968
Address
560 Mission St

oti-1 9/f el,me,ls,sp

Open the permit page

$183,968
Apr 15, 2004Completed
final sign-off Aug 2004
560 Mission Stoti-2 9/f, el, me
Details
Permit
200404151427
Status
complete
Filed
Apr 15, 2004
Permit issued
May 4, 2004
Final sign-off
Aug 4, 2004
Declared cost
$116,760
Address
560 Mission St

oti-2 9/f, el, me

Open the permit page

$116,760
Apr 9, 2004Completed
final sign-off Jul 2004
560 Mission StRedwood Electric Group Inc29/f-add fire alarm devices as t.i.,10 smoke detectors,9 strobes,11 spkr strobes,4 speakers,3 relays
Details
Permit
200404090889
Status
complete
Filed
Apr 9, 2004
Permit issued
Apr 9, 2004
Final sign-off
Jul 27, 2004
Declared cost
$50,000
Address
560 Mission St

29/f-add fire alarm devices as t.i.,10 smoke detectors,9 strobes,11 spkr strobes,4 speakers,3 relays

Open the permit page

$50,000
Mar 24, 2004Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-3 29/f sp
Details
Permit
200403249490
Status
complete
Filed
Mar 24, 2004
Permit issued
Apr 15, 2004
Final sign-off
Jul 27, 2004
Declared cost
$9,690
Address
560 Mission St

oti-3 29/f sp

Open the permit page

$9,690
Mar 5, 2004Never finaled
issued Mar 2004, no final
560 Mission StTurner Construction Co31/f- rev.appl#200310157478 show furniture on plans
Details
Permit
200403057920
Status
issued
Filed
Mar 5, 2004
Permit issued
Mar 5, 2004
Address
560 Mission St

31/f- rev.appl#200310157478 show furniture on plans

Open the permit page

Mar 5, 2004Completed
final sign-off Jul 2004
560 Mission StTurner Construction Co29/f- rev. appl#200312222789 show furniture
Details
Permit
200403057919
Status
complete
Filed
Mar 5, 2004
Permit issued
Mar 5, 2004
Final sign-off
Jul 27, 2004
Address
560 Mission St

29/f- rev. appl#200312222789 show furniture

Open the permit page

Mar 5, 2004Never finaled
issued Mar 2004, no final
560 Mission StTurner Construction Co30/f- rev. appl#200310157478 show furniture on plans
Details
Permit
200403057929
Status
issued
Filed
Mar 5, 2004
Permit issued
Mar 5, 2004
Address
560 Mission St

30/f- rev. appl#200310157478 show furniture on plans

Open the permit page

Feb 12, 2004Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti- 30th floor sp/as builts. reference 200312152276.
Details
Permit
200402126268
Status
complete
Filed
Feb 12, 2004
Permit issued
Feb 12, 2004
Final sign-off
Jul 21, 2004
Address
560 Mission St

oti- 30th floor sp/as builts. reference 200312152276.

Open the permit page

Feb 12, 2004Completed
final sign-off Jul 2004
560 Mission StTurner Construction Coas built ref.appl#200312152277 31st floor as requested by field inspector.
Details
Permit
200402126255
Status
complete
Filed
Feb 12, 2004
Permit issued
Feb 12, 2004
Final sign-off
Jul 16, 2004
Address
560 Mission St

as built ref.appl#200312152277 31st floor as requested by field inspector.

Open the permit page

Jan 21, 2004Completed
final sign-off Jul 2004
560 Mission StRedwood Electric Group Inc31st flr- provision & installation of fire alarm system devices as requested by tenant improvements
Details
Permit
200401214484
Status
complete
Filed
Jan 21, 2004
Permit issued
Feb 18, 2004
Final sign-off
Jul 16, 2004
Declared cost
$75,000
Address
560 Mission St

31st flr- provision & installation of fire alarm system devices as requested by tenant improvements

Open the permit page

$75,000
Jan 21, 2004Completed
final sign-off Jul 2004
560 Mission StRedwood Electric Group Inc30/f- provision & installation of fire alarm system devices as requested by tenant improvements
Details
Permit
200401214486
Status
complete
Filed
Jan 21, 2004
Permit issued
Feb 18, 2004
Final sign-off
Jul 21, 2004
Declared cost
$75,000
Address
560 Mission St

30/f- provision & installation of fire alarm system devices as requested by tenant improvements

Open the permit page

$75,000
Jan 6, 2004Completed
final sign-off Feb 2004
560 Mission StSwinerton Buildersrenew#200208164215,200208164199,200208234825
Details
Permit
200401063395
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Feb 10, 2004
Address
560 Mission St

renew#200208164215,200208164199,200208234825

Open the permit page

Jan 6, 2004Completed
final sign-off Feb 2004
560 Mission StSwinerton Buildersrenew#200208164220,200208164203,200210179216
Details
Permit
200401063393
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Feb 6, 2004
Address
560 Mission St

renew#200208164220,200208164203,200210179216

Open the permit page

Jan 6, 2004Completed
final sign-off Feb 2004
560 Mission StSwinerton Buildersrenew#200208164212,200208164211,200208234824
Details
Permit
200401063394
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Feb 6, 2004
Address
560 Mission St

renew#200208164212,200208164211,200208234824

Open the permit page

Jan 6, 2004Completed
final sign-off Jan 2004
560 Mission StSwinerton Buildersrenew#200208164204,200210249841,200212063020
Details
Permit
200401063391
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Jan 21, 2004
Address
560 Mission St

renew#200208164204,200210249841,200212063020

Open the permit page

Jan 6, 2004Completed
final sign-off Feb 2004
560 Mission StSwinerton Buildersrenew#200208164217,200208234823,200209267569
Details
Permit
200401063392
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Feb 10, 2004
Address
560 Mission St

renew#200208164217,200208234823,200209267569

Open the permit page

Jan 6, 2004Completed
final sign-off Jan 2004
560 Mission StSwinerton Buildersrenew#200307038753,200208164202
Details
Permit
200401063386
Status
complete
Filed
Jan 6, 2004
Permit issued
Jan 6, 2004
Final sign-off
Jan 21, 2004
Address
560 Mission St

renew#200307038753,200208164202

Open the permit page

Dec 22, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Costructural (1st time tenant) high density filing system must strengthen the floor for load
Details
Permit
200312222792
Status
complete
Filed
Dec 22, 2003
Permit issued
Mar 16, 2004
Final sign-off
Jul 27, 2004
Declared cost
$10,000
Address
560 Mission St

structural (1st time tenant) high density filing system must strengthen the floor for load

Open the permit page

$10,000
Dec 22, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-1, 29th floor, el, me, ls, sp
Details
Permit
200312222789
Status
complete
Filed
Dec 22, 2003
Permit issued
Jan 22, 2004
Final sign-off
Jul 27, 2004
Declared cost
$250,000
Address
560 Mission St

oti-1, 29th floor, el, me, ls, sp

Open the permit page

$250,000
Dec 22, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-2, 29th floor, el, me,
Details
Permit
200312222780
Status
complete
Filed
Dec 22, 2003
Permit issued
Jan 28, 2004
Final sign-off
Jul 27, 2004
Declared cost
$125,000
Address
560 Mission St

oti-2, 29th floor, el, me,

Open the permit page

$125,000
Dec 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-3, 30th floor, sp
Details
Permit
200312152276
Status
complete
Filed
Dec 15, 2003
Permit issued
Jan 12, 2004
Final sign-off
Jul 21, 2004
Declared cost
$20,000
Address
560 Mission St

oti-3, 30th floor, sp

Open the permit page

$20,000
Dec 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-3, 31st floor, sp
Details
Permit
200312152277
Status
complete
Filed
Dec 15, 2003
Permit issued
Jan 14, 2004
Final sign-off
Jul 16, 2004
Declared cost
$42,000
Address
560 Mission St

oti-3, 31st floor, sp

Open the permit page

$42,000
Dec 4, 2003Completed
final sign-off Jun 2004
560 Mission StRedwood Electric Group Incaddition of fire alarm system devices on 11th floor, relocation of (4) f.a. devices, wire & circuitr
Details
Permit
200312041572
Status
complete
Filed
Dec 4, 2003
Permit issued
Dec 9, 2003
Final sign-off
Jun 17, 2004
Declared cost
$20,000
Address
560 Mission St

addition of fire alarm system devices on 11th floor, relocation of (4) f.a. devices, wire & circuitr

Open the permit page

$20,000
Nov 20, 2003Expired or cancelled
expired Mar 2005
560 Mission St20 heads relocation
Details
Permit
200311200710
Status
expired
Filed
Nov 20, 2003
Permit issued
Nov 20, 2003
Declared cost
$5,000
Address
560 Mission St

20 heads relocation

Open the permit page

$5,000
Nov 4, 2003Completed
final sign-off Mar 2006
560 Mission StTurner Construction Conew balcony railing connection support as require by osha (window maintenance equipment requirement)
Details
Permit
200311049366
Status
complete
Filed
Nov 4, 2003
Permit issued
Jan 14, 2005
Final sign-off
Mar 3, 2006
Declared cost
$39,000
Address
560 Mission St

new balcony railing connection support as require by osha (window maintenance equipment requirement)

Open the permit page

$39,000
Oct 29, 2003Completed
final sign-off Jun 2004
560 Mission Stoti-2 11/f el me
Details
Permit
200310298820
Status
complete
Filed
Oct 29, 2003
Permit issued
Dec 16, 2003
Final sign-off
Jun 17, 2004
Declared cost
$40,000
Address
560 Mission St

oti-2 11/f el me

Open the permit page

$40,000
Oct 21, 2003Completed
final sign-off Jun 2004
560 Mission StGci, Incoti-1, 11th floor, el, me, ls, sp
Details
Permit
200310218064
Status
complete
Filed
Oct 21, 2003
Permit issued
Nov 26, 2003
Final sign-off
Jun 17, 2004
Declared cost
$480,000
Address
560 Mission St

oti-1, 11th floor, el, me, ls, sp

Open the permit page

$480,000
Oct 17, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Costructural - intervening stair- between 30 th & 31st floors ref #30/f 2003/10/15/7478
Details
Permit
200310177777
Status
complete
Filed
Oct 17, 2003
Permit issued
Dec 2, 2003
Final sign-off
Jul 16, 2004
Declared cost
$90,000
Address
560 Mission St

structural - intervening stair- between 30 th & 31st floors ref #30/f 2003/10/15/7478

Open the permit page

$90,000
Oct 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-1, 31st floor, el, me, ls, sp.
Details
Permit
200310157483
Status
complete
Filed
Oct 15, 2003
Permit issued
Nov 19, 2003
Final sign-off
Jul 16, 2004
Declared cost
$270,000
Address
560 Mission St

oti-1, 31st floor, el, me, ls, sp.

Open the permit page

$270,000
Oct 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-2, 31st floor, el, me.
Details
Permit
200310157482
Status
complete
Filed
Oct 15, 2003
Permit issued
Nov 19, 2003
Final sign-off
Jul 16, 2004
Declared cost
$900,000
Address
560 Mission St

oti-2, 31st floor, el, me.

Open the permit page

$900,000
Oct 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-1, 30th floor, el, me, ls, sp.
Details
Permit
200310157478
Status
complete
Filed
Oct 15, 2003
Permit issued
Nov 3, 2003
Final sign-off
Jul 21, 2004
Declared cost
$200,000
Address
560 Mission St

oti-1, 30th floor, el, me, ls, sp.

Open the permit page

$200,000
Oct 15, 2003Completed
final sign-off Jul 2004
560 Mission StTurner Construction Cooti-1, 30th floor, el, me.
Details
Permit
200310157484
Status
complete
Filed
Oct 15, 2003
Permit issued
Nov 6, 2003
Final sign-off
Jul 21, 2004
Declared cost
$670,000
Address
560 Mission St

oti-1, 30th floor, el, me.

Open the permit page

$670,000
Jul 3, 2003Expired or cancelled
expired Jan 2004
560 Mission StIntellisecinstall new smoke detectors 99) on (e) fire alarm systems fls 21, 22, 23 and 24. 3/21st 4/22nd
Details
Permit
200307038753
Status
expired
Filed
Jul 3, 2003
Permit issued
Jul 3, 2003
Declared cost
$3,338
Address
560 Mission St

install new smoke detectors 99) on (e) fire alarm systems fls 21, 22, 23 and 24. 3/21st 4/22nd

Open the permit page

$3,338
Apr 22, 2003Completed
final sign-off Apr 2003
560 Mission StTurner Construction Corenew for final 200112135207 and 200203201892 and revision 200208143942.
Details
Permit
200304222790
Status
complete
Filed
Apr 22, 2003
Permit issued
Apr 22, 2003
Final sign-off
Apr 29, 2003
Address
560 Mission St

renew for final 200112135207 and 200203201892 and revision 200208143942.

Open the permit page

Apr 22, 2003Completed
final sign-off Apr 2003
560 Mission StTurner Construction Corenew for final 200203151516.
Details
Permit
200304222791
Status
complete
Filed
Apr 22, 2003
Permit issued
Apr 22, 2003
Final sign-off
Apr 29, 2003
Address
560 Mission St

renew for final 200203151516.

Open the permit page

Dec 11, 2002Completed
final sign-off Feb 2003
560 Mission StTurner Construction Coas built/amendment to appl#20000124819s1
Details
Permit
200212113289
Status
complete
Filed
Dec 11, 2002
Permit issued
Jan 31, 2003
Final sign-off
Feb 27, 2003
Address
560 Mission St

as built/amendment to appl#20000124819s1

Open the permit page

Dec 6, 2002Expired or cancelled
expired Jan 2004
560 Mission Strelocate exit signs floors 22,23,24
Details
Permit
200212063020
Status
expired
Filed
Dec 6, 2002
Permit issued
Dec 6, 2002
Address
560 Mission St

relocate exit signs floors 22,23,24

Open the permit page

Nov 21, 2002Completed
final sign-off Feb 2003
560 Mission StTurner Construction Coreconfigure/rev. appl#20000124819 for structural requirement reference only
Details
Permit
200211212065
Status
complete
Filed
Nov 21, 2002
Permit issued
Nov 21, 2002
Final sign-off
Feb 27, 2003
Address
560 Mission St

reconfigure/rev. appl#20000124819 for structural requirement reference only

Open the permit page

Oct 24, 2002Never finaled
issued Oct 2002, no final
560 Mission StIntellisecinstallation of fire system additions on flrs 21,22,23 & 24
Details
Permit
200210249841
Status
issued
Filed
Oct 24, 2002
Permit issued
Oct 25, 2002
Declared cost
$36,700
Address
560 Mission St

installation of fire system additions on flrs 21,22,23 & 24

Open the permit page

$36,700
Oct 17, 2002Expired or cancelled
expired Feb 2004
560 Mission Strev to 21st flr,corridor permit 200208234284 & 22nd flr 200208234825
Details
Permit
200210179216
Status
expired
Filed
Oct 17, 2002
Permit issued
Oct 17, 2002
Address
560 Mission St

rev to 21st flr,corridor permit 200208234284 & 22nd flr 200208234825

Open the permit page

Sep 26, 2002Expired or cancelled
expired Feb 2004
560 Mission Stoti for fire sprinklers fl 21,22,23,& 24
Details
Permit
200209267569
Status
expired
Filed
Sep 26, 2002
Permit issued
Oct 8, 2002
Declared cost
$80,000
Address
560 Mission St

oti for fire sprinklers fl 21,22,23,& 24

Open the permit page

$80,000
Aug 23, 2002Expired or cancelled
expired Feb 2004
560 Mission St21/fl- rev. appl#200208164215 alter to 1 hr. corridor
Details
Permit
200208234825
Status
expired
Filed
Aug 23, 2002
Permit issued
Aug 23, 2002
Declared cost
$5,000
Address
560 Mission St

21/fl- rev. appl#200208164215 alter to 1 hr. corridor

Open the permit page

$5,000
Aug 23, 2002Expired or cancelled
expired Feb 2004
560 Mission St24/fl- new mechanical, electrical & lighting
Details
Permit
200208234823
Status
expired
Filed
Aug 23, 2002
Permit issued
Oct 18, 2002
Declared cost
$15,000
Address
560 Mission St

24/fl- new mechanical, electrical & lighting

Open the permit page

$15,000
Aug 23, 2002Expired or cancelled
expired Feb 2004
560 Mission St22/fl- rev. appl#200208164212, new 1 hour wall to make corridor
Details
Permit
200208234824
Status
expired
Filed
Aug 23, 2002
Permit issued
Aug 23, 2002
Declared cost
$10,000
Address
560 Mission St

22/fl- rev. appl#200208164212, new 1 hour wall to make corridor

Open the permit page

$10,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission St22nd flr, new mech,elec & lighting (no inc. in office space)
Details
Permit
200208164211
Status
expired
Filed
Aug 16, 2002
Permit issued
Oct 18, 2002
Declared cost
$275,000
Address
560 Mission St

22nd flr, new mech,elec & lighting (no inc. in office space)

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission Stfirst time tinant improvement on 21st flr,mech/elec under separate permit
Details
Permit
200208164215
Status
expired
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Declared cost
$275,000
Address
560 Mission St

first time tinant improvement on 21st flr,mech/elec under separate permit

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission Sttenant improvement 24th flr, mech/elec under separate permit
Details
Permit
200208164217
Status
expired
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Declared cost
$275,000
Address
560 Mission St

tenant improvement 24th flr, mech/elec under separate permit

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Jan 2004
560 Mission St22/fl. corridor mechanical & electrical
Details
Permit
200208164202
Status
expired
Filed
Aug 16, 2002
Permit issued
Oct 18, 2002
Declared cost
$25,000
Address
560 Mission St

22/fl. corridor mechanical & electrical

Open the permit page

$25,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission Stti on 23rd flr; mech & elec under separate permit
Details
Permit
200208164220
Status
expired
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Declared cost
$275,000
Address
560 Mission St

ti on 23rd flr; mech & elec under separate permit

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission St21/fl. new mechancial, elec & lighting
Details
Permit
200208164199
Status
expired
Filed
Aug 16, 2002
Permit issued
Dec 12, 2002
Declared cost
$275,000
Address
560 Mission St

21/fl. new mechancial, elec & lighting

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission St23/fl. new mechancial, elec & lighting
Details
Permit
200208164203
Status
expired
Filed
Aug 16, 2002
Permit issued
Dec 12, 2002
Declared cost
$275,000
Address
560 Mission St

23/fl. new mechancial, elec & lighting

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Feb 2004
560 Mission Stfirst time tenant improvement on 22nd flr,mechanical,elec under spearate permit
Details
Permit
200208164212
Status
expired
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Declared cost
$275,000
Address
560 Mission St

first time tenant improvement on 22nd flr,mechanical,elec under spearate permit

Open the permit page

$275,000
Aug 16, 2002Expired or cancelled
expired Jan 2004
560 Mission St21/fl. elevator lobby, m/w, restroom, mech & electrical
Details
Permit
200208164204
Status
expired
Filed
Aug 16, 2002
Permit issued
Oct 18, 2002
Declared cost
$25,000
Address
560 Mission St

21/fl. elevator lobby, m/w, restroom, mech & electrical

Open the permit page

$25,000
Aug 15, 2002Completed
final sign-off Mar 2003
560 Mission Strevision to 200110181150 9th and 11th fllor no structural work
Details
Permit
200208154103
Status
complete
Filed
Aug 15, 2002
Permit issued
Sep 5, 2002
Final sign-off
Mar 25, 2003
Declared cost
$15,000
Address
560 Mission St

revision to 200110181150 9th and 11th fllor no structural work

Open the permit page

$15,000
Aug 15, 2002Completed
final sign-off Mar 2003
560 Mission Strevision to application 200110181160 floors 12th, 13th and 14th no structural work, minor altertatio
Details
Permit
200208154084
Status
complete
Filed
Aug 15, 2002
Permit issued
Sep 5, 2002
Final sign-off
Mar 21, 2003
Declared cost
$15,000
Address
560 Mission St

revision to application 200110181160 floors 12th, 13th and 14th no structural work, minor altertatio

Open the permit page

$15,000
Aug 15, 2002Completed
final sign-off Mar 2003
560 Mission Strevision to 200111273864 18, 19 and 20th floor no structrural work
Details
Permit
200208154102
Status
complete
Filed
Aug 15, 2002
Permit issued
Sep 5, 2002
Final sign-off
Mar 25, 2003
Declared cost
$15,000
Address
560 Mission St

revision to 200111273864 18, 19 and 20th floor no structrural work

Open the permit page

$15,000
Aug 15, 2002Completed
final sign-off Mar 2003
560 Mission Strevision to application 200109259164 4t and 5th floors, minor alterations
Details
Permit
200208154087
Status
complete
Filed
Aug 15, 2002
Permit issued
Sep 5, 2002
Final sign-off
Mar 20, 2003
Declared cost
$15,000
Address
560 Mission St

revision to application 200109259164 4t and 5th floors, minor alterations

Open the permit page

$15,000
Aug 15, 2002Completed
final sign-off Mar 2003
560 Mission Strevision to application 200111304249 fls 15th, 16th and 17th minor alterations to partitions
Details
Permit
200208154093
Status
complete
Filed
Aug 15, 2002
Permit issued
Sep 5, 2002
Final sign-off
Mar 25, 2003
Declared cost
$15,000
Address
560 Mission St

revision to application 200111304249 fls 15th, 16th and 17th minor alterations to partitions

Open the permit page

$15,000
Aug 14, 2002Expired or cancelled
expired Apr 2003
560 Mission StTurner Construction Colife safety revision to 200203201892 adding devices to previous scope of work
Details
Permit
200208143942
Status
expired
Filed
Aug 14, 2002
Permit issued
Aug 14, 2002
Final sign-off
Feb 27, 2003
Declared cost
$750
Address
560 Mission St

life safety revision to 200203201892 adding devices to previous scope of work

Open the permit page

$750
Aug 6, 2002Never finaled
issued Aug 2002, no final
560 Mission Ststreet space
Details
Permit
M21424
Status
issued
Filed
Aug 6, 2002
Permit issued
Aug 6, 2002
Address
560 Mission St

street space

Open the permit page

Aug 5, 2002Never finaled
issued Aug 2002, no final
560 Mission Ststreetspace
Details
Permit
M21416
Status
issued
Filed
Aug 5, 2002
Permit issued
Aug 5, 2002
Address
560 Mission St

streetspace

Open the permit page

Apr 17, 2002Completed
final sign-off Mar 2003
560 Mission Strevision for 3rd, 6th, and 7th floor app 200109259126
Details
Permit
200204174226
Status
complete
Filed
Apr 17, 2002
Permit issued
May 7, 2002
Final sign-off
Mar 20, 2003
Declared cost
$10,000
Address
560 Mission St

revision for 3rd, 6th, and 7th floor app 200109259126

Open the permit page

$10,000
Apr 15, 2002Completed
final sign-off Mar 2003
560 Mission Stto erect non electric sign
Details
Permit
200204153979
Status
complete
Filed
Apr 15, 2002
Permit issued
Apr 15, 2002
Final sign-off
Mar 20, 2003
Address
560 Mission St

to erect non electric sign

Open the permit page

Apr 11, 2002Expired or cancelled
expired Aug 2002
560 Mission StTurner Construction Coamendment to pa 20000124819 s4, redundant anchorage system for the curtain wall
Details
Permit
200204113797
Status
expired
Filed
Apr 11, 2002
Permit issued
Apr 26, 2002
Address
560 Mission St

amendment to pa 20000124819 s4, redundant anchorage system for the curtain wall

Open the permit page

Mar 29, 2002Completed
final sign-off Mar 2003
560 Mission St1/fl.- security desk & security turnstiles
Details
Permit
200203292632
Status
complete
Filed
Mar 29, 2002
Permit issued
Mar 29, 2002
Final sign-off
Mar 20, 2003
Declared cost
$150,000
Address
560 Mission St

1/fl.- security desk & security turnstiles

Open the permit page

$150,000
Mar 27, 2002Completed
final sign-off Mar 2003
560 Mission StSascofire alarm -tenant improvement-install 18 power supply, 3 monitor modules, 7 control modules, 24 rel
Details
Permit
200203272518
Status
complete
Filed
Mar 27, 2002
Permit issued
Apr 30, 2002
Final sign-off
Mar 20, 2003
Declared cost
$321,000
Address
560 Mission St

fire alarm -tenant improvement-install 18 power supply, 3 monitor modules, 7 control modules, 24 rel

Open the permit page

$321,000
Mar 20, 2002Expired or cancelled
expired Apr 2003
560 Mission StTurner Construction Cotenant inprovement . add 2 speaker strobes and one strobe. ref#200112135207
Details
Permit
200203201892
Status
expired
Filed
Mar 20, 2002
Permit issued
Mar 20, 2002
Declared cost
$3,500
Address
560 Mission St

tenant inprovement . add 2 speaker strobes and one strobe. ref#200112135207

Open the permit page

$3,500
Mar 15, 2002Expired or cancelled
expired Apr 2003
560 Mission StTurner Construction Coadding 5 new sprinklers and relocate per app #200112135207
Details
Permit
200203151516
Status
expired
Filed
Mar 15, 2002
Permit issued
Mar 15, 2002
Declared cost
$3,000
Address
560 Mission St

adding 5 new sprinklers and relocate per app #200112135207

Open the permit page

$3,000
Feb 28, 2002Completed
final sign-off Apr 2003
560 Mission StHathaway Dinwiddie Co.battery instulation at ups on b2 per app #200108276950
Details
Permit
200202280326
Status
complete
Filed
Feb 28, 2002
Permit issued
Mar 11, 2002
Final sign-off
Apr 3, 2003
Declared cost
$38,000
Address
560 Mission St

battery instulation at ups on b2 per app #200108276950

Open the permit page

$38,000
Jan 22, 2002Completed
final sign-off Apr 2003
560 Mission StAllied Fire Protectionadd new sprinklers to revise wall layout tenant improvement flrs 2-20 only.
Details
Permit
200201227432
Status
complete
Filed
Jan 22, 2002
Permit issued
Feb 22, 2002
Final sign-off
Apr 3, 2003
Declared cost
$600,000
Address
560 Mission St

add new sprinklers to revise wall layout tenant improvement flrs 2-20 only.

Open the permit page

$600,000
Dec 13, 2001Expired or cancelled
expired Apr 2003
560 Mission Sttenant improvement on ground floor, new office partitions, new mech & elec
Details
Permit
200112135207
Status
expired
Filed
Dec 13, 2001
Permit issued
Feb 25, 2002
Declared cost
$180,000
Address
560 Mission St

tenant improvement on ground floor, new office partitions, new mech & elec

Open the permit page

$180,000
Nov 30, 2001Completed
final sign-off Mar 2003
560 Mission Sttenant improvement of 15th, 16th and 17th floor
Details
Permit
200111304249
Status
complete
Filed
Nov 30, 2001
Permit issued
Feb 27, 2002
Final sign-off
Mar 25, 2003
Declared cost
$4,763,300
Address
560 Mission St

tenant improvement of 15th, 16th and 17th floor

Open the permit page

$4,763,300
Nov 27, 2001Completed
final sign-off Mar 2003
560 Mission Stfloors 18, 19 and 20 tenant improvement. new office partitions /mech and elec
Details
Permit
200111273864
Status
complete
Filed
Nov 27, 2001
Permit issued
Mar 19, 2002
Final sign-off
Mar 25, 2003
Declared cost
$3,765,000
Address
560 Mission St

floors 18, 19 and 20 tenant improvement. new office partitions /mech and elec

Open the permit page

$3,765,000
Oct 22, 2001Completed
final sign-off Apr 2003
560 Mission StAllied Fire Protectiondemo. existing sprinkler piping @ storage room, add new sprinker piping for preaction system @ new u
Details
Permit
200110221395
Status
complete
Filed
Oct 22, 2001
Permit issued
Dec 10, 2001
Final sign-off
Apr 3, 2003
Declared cost
$14,800
Address
560 Mission St

demo. existing sprinkler piping @ storage room, add new sprinker piping for preaction system @ new u

Open the permit page

$14,800
Oct 18, 2001Completed
final sign-off Mar 2003
560 Mission Stone-stop:neil f. floors 12,13 & 14th t.i. new office partitions
Details
Permit
200110181160
Status
complete
Filed
Oct 18, 2001
Permit issued
Feb 1, 2002
Final sign-off
Mar 21, 2003
Declared cost
$3,765,000
Address
560 Mission St

one-stop:neil f. floors 12,13 & 14th t.i. new office partitions

Open the permit page

$3,765,000
Oct 18, 2001Completed
final sign-off Mar 2003
560 Mission St8th fl t.i. new t raining classrooms sprinkler under separate permit
Details
Permit
200110181143
Status
complete
Filed
Oct 18, 2001
Permit issued
Feb 11, 2002
Final sign-off
Mar 25, 2003
Declared cost
$2,353,250
Address
560 Mission St

8th fl t.i. new t raining classrooms sprinkler under separate permit

Open the permit page

$2,353,250
Oct 18, 2001Completed
final sign-off Mar 2003
560 Mission Stone-stop:eric. omokaro, floors 9,10 & 11 t.i. office partitions
Details
Permit
200110181150
Status
complete
Filed
Oct 18, 2001
Permit issued
Feb 1, 2002
Final sign-off
Mar 25, 2003
Declared cost
$3,765,000
Address
560 Mission St

one-stop:eric. omokaro, floors 9,10 & 11 t.i. office partitions

Open the permit page

$3,765,000
Sep 25, 2001Completed
final sign-off Mar 2003
560 Mission St4th & 5th fl t.i., new office partition
Details
Permit
200109259164
Status
complete
Filed
Sep 25, 2001
Permit issued
Nov 29, 2001
Final sign-off
Mar 20, 2003
Declared cost
$5,511,589
Address
560 Mission St

4th & 5th fl t.i., new office partition

Open the permit page

$5,511,589
Sep 25, 2001Completed
final sign-off Mar 2003
560 Mission St3rd, 6th and 7th floors, new office tenant improvement
Details
Permit
200109259162
Status
complete
Filed
Sep 25, 2001
Permit issued
Nov 29, 2001
Final sign-off
Mar 20, 2003
Declared cost
$3,681,288
Address
560 Mission St

3rd, 6th and 7th floors, new office tenant improvement

Open the permit page

$3,681,288
Sep 6, 2001Completed
final sign-off Feb 2003
560 Mission StTurner Construction Corevision to s, s-1, s-2, s-3. 2000/01/24/819. incl public open space,mepsys rev,install steel mezz.
Details
Permit
200109067761
Status
complete
Filed
Sep 6, 2001
Permit issued
Feb 11, 2002
Final sign-off
Feb 27, 2003
Address
560 Mission St

revision to s, s-1, s-2, s-3. 2000/01/24/819. incl public open space,mepsys rev,install steel mezz.

Open the permit page

Aug 31, 2001Completed
final sign-off Apr 2003
560 Mission Stnew emergency generator at mezzanine floor between 1st & 2nd floor
Details
Permit
200108317377
Status
complete
Filed
Aug 31, 2001
Permit issued
Feb 22, 2002
Final sign-off
Apr 3, 2003
Declared cost
$341,700
Address
560 Mission St

new emergency generator at mezzanine floor between 1st & 2nd floor

Open the permit page

$341,700
Aug 28, 2001Completed
final sign-off Feb 2003
560 Mission StJ Gibbs Sons Incinstall fuel oil storage system,3 tans
Details
Permit
200108287056
Status
complete
Filed
Aug 28, 2001
Permit issued
Nov 5, 2001
Final sign-off
Feb 27, 2003
Declared cost
$50,000
Address
560 Mission St

install fuel oil storage system,3 tans

Open the permit page

$50,000
Aug 27, 2001Completed
final sign-off Apr 2003
560 Mission Sttenant improvement on level b1-b2 includes mep
Details
Permit
200108276950
Status
complete
Filed
Aug 27, 2001
Permit issued
Oct 17, 2001
Final sign-off
Apr 3, 2003
Declared cost
$301,250
Address
560 Mission St

tenant improvement on level b1-b2 includes mep

Open the permit page

$301,250
Jul 6, 2001Completed
final sign-off Mar 2003
560 Mission Stlevel b-1, 2 new electrical rms, t telecom rm, improvement for office space
Details
Permit
200107063124
Status
complete
Filed
Jul 6, 2001
Permit issued
Sep 21, 2001
Final sign-off
Mar 20, 2003
Declared cost
$858,000
Address
560 Mission St

level b-1, 2 new electrical rms, t telecom rm, improvement for office space

Open the permit page

$858,000
Nov 21, 2000Completed
final sign-off Feb 2003
560 Mission Stunderslab plumbing & electrical conducit , amends site pa #20000124819s-2
Details
Permit
200011216367
Status
complete
Filed
Nov 21, 2000
Permit issued
Nov 21, 2000
Final sign-off
Feb 27, 2003
Address
560 Mission St

underslab plumbing & electrical conducit , amends site pa #20000124819s-2

Open the permit page

Jul 21, 2000Expired or cancelled
expired Nov 2000
560 Mission Ststreet space
Details
Permit
M13807
Status
expired
Filed
Jul 21, 2000
Permit issued
Jul 21, 2000
Address
560 Mission St

street space

Open the permit page