Permit GraphShortlistSan Francisco building permits since 2000

Terrence Olson

License
777717
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, authorized agent-others, designer, engineer
Firm
R L H Fire Protection Inc
Based in
San Francisco
On San Francisco permits
Oct 2004 to Jan 2026

130 permits since 2000 (designer on 79 permits, engineer on 26 permits, authorized agent-others on 24 permits, architect on 4 permits): 100 completed, 6 in progress, 17 never finaled, 7 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bevilacqua & Sons

Most recent permits

Showing the 100 most recent of 130.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 15, 2026Completed
final sign-off Feb 2026
905 California Stfire sprinkler: remove all f/s and sprinkler pipe from elevator machine rooms and elevator pits. based on sffd letter dated 12/16/2025. delete 2 sidewalls and 9 uprights sprinklers.
Details
Permit
202601153889
Permit issued
Jan 15, 2026
Final sign-off
Feb 5, 2026

fire sprinkler: remove all f/s and sprinkler pipe from elevator machine rooms and elevator pits. based on sffd letter dated 12/16/2025. delete 2 sidewalls and 9 uprights sprinklers.

Open the permit page

$2,500
Jan 15, 2026Completed
final sign-off Feb 2026
100 Montgomery Stfire sprinkler permit: relocate 1, add 3, remove 7 sprinklers on 23rd floor. ref t.i. pa202512081227.
Details
Permit
202601153888
Permit issued
Jan 15, 2026
Final sign-off
Feb 4, 2026

fire sprinkler permit: relocate 1, add 3, remove 7 sprinklers on 23rd floor. ref t.i. pa202512081227.

Open the permit page

$2,500
Dec 8, 2025Completed
final sign-off Mar 2026
4 Embarcadero Center23/f: revision to permit 202508082620. relocate one additional sprinkler for architectural changes. ref original t.i permit 202505287341, revised t.i permit 202510086955.
Details
Permit
202512081189
Permit issued
Dec 8, 2025
Final sign-off
Mar 6, 2026

23/f: revision to permit 202508082620. relocate one additional sprinkler for architectural changes. ref original t.i permit 202505287341, revised t.i permit 202510086955.

Open the permit page

$1,000
Dec 3, 2025Completed
final sign-off Jan 2026
201 Spear St17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler.
Details
Permit
202512030803
Permit issued
Dec 8, 2025
Final sign-off
Jan 22, 2026

17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler.

Open the permit page

$30,500
Dec 1, 2025In progress
issued Dec 2025
500 Terry A Francois Blfire sprinkler permit relocate 227 and add 34 sprinklers on the 2nd fl. t.i. pa# 2025-0626-9604.
Details
Permit
202510177575
Permit issued
Dec 5, 2025

fire sprinkler permit relocate 227 and add 34 sprinklers on the 2nd fl. t.i. pa# 2025-0626-9604.

Open the permit page

$162,000
Nov 25, 2025Completed
final sign-off Dec 2025
101 02nd St15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514
Details
Permit
202511250424
Permit issued
Nov 25, 2025
Final sign-off
Dec 4, 2025

15th fl - fire sprinkler, switch 18 pendents with upright fire sprinklers ti 202510016514

Open the permit page

$5,000
Nov 21, 2025In progress
issued Dec 2025
1455 03rd Stlevel 4: t.i fire sprinkler. add 4 fire sprinklers. ref t.i permit 202506178882
Details
Permit
202511210176
Permit issued
Dec 5, 2025

level 4: t.i fire sprinkler. add 4 fire sprinklers. ref t.i permit 202506178882

Open the permit page

$2,500
Nov 21, 2025Completed
final sign-off Mar 2026
1455 03rd Stlevel 9: t.i fire sprinkler. add 7 fire sprinklers. ref t.i permit 202506178881
Details
Permit
202511210181
Permit issued
Dec 12, 2025
Final sign-off
Mar 25, 2026

level 9: t.i fire sprinkler. add 7 fire sprinklers. ref t.i permit 202506178881

Open the permit page

$4,500
Nov 17, 2025Completed
final sign-off Dec 2025
160 Spear Stfire sprinkler permits install 35 new sprinklers for phone booths on floors 10-13, 15 and 19. ti 202508253847 ( 3 heads on the 10th, 8 on 11th, 4 on the 12th, 5 on the 13th ,3 on the 15th & 12 on the 19th )
Details
Permit
202511179757
Permit issued
Nov 18, 2025
Final sign-off
Dec 22, 2025

fire sprinkler permits install 35 new sprinklers for phone booths on floors 10-13, 15 and 19. ti 202508253847 ( 3 heads on the 10th, 8 on 11th, 4 on the 12th, 5 on the 13th ,3 on the 15th & 12 on the 19th )

Open the permit page

$24,000
Nov 12, 2025Completed
final sign-off Dec 2025
1581 Webster Stfire sprinkler - remove all sprinklers and sprinkler pipe at elevator pit and top of shaft. install one sidewall sprinkler at top of shaft based on sffd letter dated 10/09/2025.
Details
Permit
202511129365
Permit issued
Nov 12, 2025
Final sign-off
Dec 2, 2025

fire sprinkler - remove all sprinklers and sprinkler pipe at elevator pit and top of shaft. install one sidewall sprinkler at top of shaft based on sffd letter dated 10/09/2025.

Open the permit page

$3,000
Oct 17, 2025Completed
final sign-off Feb 2026
500 Terry A Francois Blfire sprinkler permit relocate 4 and add 12 sprinklers on the 3rd fl. t.t. 2025-0702-9993
Details
Permit
202510177577
Permit issued
Oct 17, 2025
Final sign-off
Feb 6, 2026

fire sprinkler permit relocate 4 and add 12 sprinklers on the 3rd fl. t.t. 2025-0702-9993

Open the permit page

$10,000
Oct 17, 2025Completed
final sign-off Nov 2025
655 Montgomery Stfire sprinkler permit relocate 2, add 16 and delete 18 sprinklers on the 17th fl. t.i. 2025-0916-5376
Details
Permit
202510177579
Permit issued
Oct 20, 2025
Final sign-off
Nov 25, 2025

fire sprinkler permit relocate 2, add 16 and delete 18 sprinklers on the 17th fl. t.i. 2025-0916-5376

Open the permit page

$11,500
Sep 29, 2025Completed
final sign-off Dec 2025
146 Geary Stbasement 1 and 2: fire sprinkler permit- install 52 new pendents, relocate 7 pendents and delete one. relocate 23 uprights, add 8 upright and delete 3. ref pa #202505307632
Details
Permit
202509296289
Permit issued
Oct 1, 2025
Final sign-off
Dec 4, 2025

basement 1 and 2: fire sprinkler permit- install 52 new pendents, relocate 7 pendents and delete one. relocate 23 uprights, add 8 upright and delete 3. ref pa #202505307632

Open the permit page

$50,000
Sep 29, 2025Completed
final sign-off Nov 2025
333 Bush Stfire sprinkler permit. relocate 25, add 1 and delete 3 sprinklers on the 20th floor. ref: 202509044546.
Details
Permit
202509296292
Permit issued
Oct 7, 2025
Final sign-off
Nov 18, 2025

fire sprinkler permit. relocate 25, add 1 and delete 3 sprinklers on the 20th floor. ref: 202509044546.

Open the permit page

$16,000
Sep 29, 2025Completed
final sign-off Dec 2025
655 Montgomery Stfire sprinker permit. relocate 6 and add one sprinkler on the 17th floor. ref: 202509165360
Details
Permit
202509296291
Permit issued
Oct 7, 2025
Final sign-off
Dec 4, 2025

fire sprinker permit. relocate 6 and add one sprinkler on the 17th floor. ref: 202509165360

Open the permit page

$4,000
Sep 17, 2025Completed
final sign-off Oct 2025
1455 03rd St1st fl - as built revision to approved fire sprinkler ref pa 202508294190 add 1, relocate 2 fire sprinklers
Details
Permit
202509175444
Permit issued
Sep 17, 2025
Final sign-off
Oct 21, 2025

1st fl - as built revision to approved fire sprinkler ref pa 202508294190 add 1, relocate 2 fire sprinklers

Open the permit page

$1,200
Aug 22, 2025Completed
final sign-off Jan 2026
301 Howard St5/fl- fire sprinkler permit relocate 9 add 2 and delete 2 sprinklers. ref ti 202507030103
Details
Permit
202508223697
Permit issued
Aug 22, 2025
Final sign-off
Jan 20, 2026

5/fl- fire sprinkler permit relocate 9 add 2 and delete 2 sprinklers. ref ti 202507030103

Open the permit page

$7,000
Aug 5, 2025Completed
final sign-off Dec 2025
600 Montgomery St10/f: add 19, relocate 143, delete 7, fire sprinklers; 12/f: add 14, relocate 134, delete 9; 13/f: add 16 , relocate 132, delete 1. ref ti pa# 202504144304.
Details
Permit
202507251660
Permit issued
Aug 26, 2025
Final sign-off
Dec 18, 2025

10/f: add 19, relocate 143, delete 7, fire sprinklers; 12/f: add 14, relocate 134, delete 9; 13/f: add 16 , relocate 132, delete 1. ref ti pa# 202504144304.

Open the permit page

$135,000
Aug 5, 2025Completed
final sign-off Dec 2025
600 Montgomery St23/f: add 16, relocate 85, delete 3 fire sprinklers; 24/f: add 33, relocate 59, delete 0 fire sprinklers. ref ti pa# 202504114225.
Details
Permit
202507251661
Permit issued
Aug 6, 2025
Final sign-off
Dec 18, 2025

23/f: add 16, relocate 85, delete 3 fire sprinklers; 24/f: add 33, relocate 59, delete 0 fire sprinklers. ref ti pa# 202504114225.

Open the permit page

$135,000
Aug 5, 2025Completed
final sign-off Feb 2026
600 Montgomery St9/f: add 19, relocate 135 and delete 12 fire sprinklers; 11/f: add 13, relocate 155 ande delete 11. ref ti pa# 202504144336.
Details
Permit
202507251659
Permit issued
Aug 13, 2025
Final sign-off
Feb 5, 2026

9/f: add 19, relocate 135 and delete 12 fire sprinklers; 11/f: add 13, relocate 155 ande delete 11. ref ti pa# 202504144336.

Open the permit page

$100,000
Jul 18, 2025In progress
issued Oct 2025
360 Spear Streplace (e) 750 gpm, 80 psi fire pump with a new 750 gpm, 80 psi fire pump.
Details
Permit
202507171016
Permit issued
Oct 21, 2025

replace (e) 750 gpm, 80 psi fire pump with a new 750 gpm, 80 psi fire pump.

Open the permit page

$96,000
Jul 14, 2025Completed
final sign-off Oct 2025
350 Rhode Island St2nd/f ste# 250: revision to pa# 202408239394: update sprinkler heads & locations in revised work space. ref to pa# 202507020066
Details
Permit
202507140719
Permit issued
Jul 18, 2025
Final sign-off
Oct 22, 2025

2nd/f ste# 250: revision to pa# 202408239394: update sprinkler heads & locations in revised work space. ref to pa# 202507020066

Open the permit page

Jul 11, 2025Completed
final sign-off Sep 2025
475 Sansome St16th fl - fire sprinklers permit. relocate 77 and add 34 pendent sprinklers; relocate 72 and add 35 upright sprinklers. delete 15 pendent sprinklers. ref pa 202502190638
Details
Permit
202507110620
Permit issued
Jul 11, 2025
Final sign-off
Sep 19, 2025

16th fl - fire sprinklers permit. relocate 77 and add 34 pendent sprinklers; relocate 72 and add 35 upright sprinklers. delete 15 pendent sprinklers. ref pa 202502190638

Open the permit page

$135,000
Jul 7, 2025Completed
final sign-off Mar 2026
255 King Stroof level - fire sprinkler permit. remove 3 upright sprinklers and all sprinkler piping from the roof level elevator machine room.
Details
Permit
202507070269
Permit issued
Jul 8, 2025
Final sign-off
Mar 13, 2026

roof level - fire sprinkler permit. remove 3 upright sprinklers and all sprinkler piping from the roof level elevator machine room.

Open the permit page

$1,000
Jul 7, 2025Completed
final sign-off Feb 2026
235 Montgomery St16/f: fire sprinkler permit. relocate 16, add 7, and delete 1 sprinkler on 16th floor. ref permit 202505055769
Details
Permit
202507070266
Permit issued
Jul 8, 2025
Final sign-off
Feb 24, 2026

16/f: fire sprinkler permit. relocate 16, add 7, and delete 1 sprinkler on 16th floor. ref permit 202505055769

Open the permit page

$14,500
Jul 7, 2025Completed
final sign-off Jul 2025
555 California St33/f: fire sprinkler permit. as built revision to permit 202503242841 due to sprinkler layout changes in reception 3000 and pantry 3345. no change in scope of work. ref t.i permit 202503041509.
Details
Permit
202507070273
Permit issued
Jul 8, 2025
Final sign-off
Jul 14, 2025

33/f: fire sprinkler permit. as built revision to permit 202503242841 due to sprinkler layout changes in reception 3000 and pantry 3345. no change in scope of work. ref t.i permit 202503041509.

Open the permit page

$1,000
Jun 20, 2025Completed
final sign-off Jul 2025
1 Post Stfire sprinkler permit. relocate 10 and delete 3 sprinklers on the basement level. t.i ref pa# 202505227060
Details
Permit
202506209068
Permit issued
Jun 20, 2025
Final sign-off
Jul 7, 2025

fire sprinkler permit. relocate 10 and delete 3 sprinklers on the basement level. t.i ref pa# 202505227060

Open the permit page

$7,000
Jun 18, 2025Completed
final sign-off Aug 2025
300 Mission St15/f: t.i. fire sprinklers. add 33, relocate 66 and delete 06 fire sprinklers. ref#: 202504285307
Details
Permit
202506188948
Permit issued
Jun 20, 2025
Final sign-off
Aug 28, 2025

15/f: t.i. fire sprinklers. add 33, relocate 66 and delete 06 fire sprinklers. ref#: 202504285307

Open the permit page

$38,000
Jun 17, 2025Completed
final sign-off Jul 2025
730 Polk St2nd & 3rd fl ref pa # 2025-0428-5312: fire sprinkler relocate 2, add 3 and delete 1 sprinkler
Details
Permit
202506178825
Permit issued
Jun 18, 2025
Final sign-off
Jul 2, 2025

2nd & 3rd fl ref pa # 2025-0428-5312: fire sprinkler relocate 2, add 3 and delete 1 sprinkler

Open the permit page

$2,000
Jun 17, 2025Completed
final sign-off Dec 2025
655 Montgomery St19th fl ref pa # 2025-0416-4581: fire sprinkler relocate 69, add 35 and delete 59 pendent sprinklers. add 36 upright sprinklers
Details
Permit
202506178824
Permit issued
Jun 18, 2025
Final sign-off
Dec 30, 2025

19th fl ref pa # 2025-0416-4581: fire sprinkler relocate 69, add 35 and delete 59 pendent sprinklers. add 36 upright sprinklers

Open the permit page

$90,000
May 27, 2025In progress
issued Jul 2025
345 Stockton Stfire pumps replacement, all valves and fitings to remain.
Details
Permit
202505166610
Permit issued
Jul 11, 2025

fire pumps replacement, all valves and fitings to remain.

Open the permit page

$292,000
May 22, 2025Expired or cancelled
cancelled Jul 2025
200 West Portal Avfire sprinkler permit. relocate 2 sprinkler on the 1st floor. ref ti# 202501289183
Details
Permit
202505227043
Permit issued
May 22, 2025

fire sprinkler permit. relocate 2 sprinkler on the 1st floor. ref ti# 202501289183

Open the permit page

$1,300
May 20, 2025Completed
final sign-off Jul 2025
535 Mission St12/f: fire sprinkler permit - relocate 57, add 17, and delete 11 sprinklers. ti# 202501248998
Details
Permit
202505206832
Permit issued
May 20, 2025
Final sign-off
Jul 7, 2025

12/f: fire sprinkler permit - relocate 57, add 17, and delete 11 sprinklers. ti# 202501248998

Open the permit page

$21,500
Apr 24, 2025Completed
final sign-off Nov 2025
888 Post Stti fire sprinklers ref t.i. pa # 202410022175. add 55 sprinklers, relocate 7
Details
Permit
202504245109
Permit issued
Apr 24, 2025
Final sign-off
Nov 10, 2025

ti fire sprinklers ref t.i. pa # 202410022175. add 55 sprinklers, relocate 7

Open the permit page

$35,000
Mar 27, 2025Completed
final sign-off May 2025
505 Howard St9th fl, ti sprinkler - add 3, relocate 34 and delete 8 fs ref pa 202412166931
Details
Permit
202503273125
Permit issued
Mar 27, 2025
Final sign-off
May 7, 2025

9th fl, ti sprinkler - add 3, relocate 34 and delete 8 fs ref pa 202412166931

Open the permit page

$11,000
Mar 27, 2025Completed
final sign-off May 2025
1455 03rd Stti fire sprinlers: 2nd/fl: add 05 fire spsrinklers. 3rd/fl: add 17 and relocate 01 fire sprinklers. ti ref 202501238909
Details
Permit
202503273145
Permit issued
Mar 28, 2025
Final sign-off
May 23, 2025

ti fire sprinlers: 2nd/fl: add 05 fire spsrinklers. 3rd/fl: add 17 and relocate 01 fire sprinklers. ti ref 202501238909

Open the permit page

$14,500
Mar 24, 2025In progress
issued Mar 2025
345 California St24th/fl: fire sprinkler permit. elocate 70, add 11 and delete 25 sprinlers on the 24th floor ti#2025-0226-1111.
Details
Permit
202503242848
Permit issued
Mar 24, 2025

24th/fl: fire sprinkler permit. elocate 70, add 11 and delete 25 sprinlers on the 24th floor ti#2025-0226-1111.

Open the permit page

$25,000
Mar 24, 2025Completed
final sign-off May 2025
1 Market St12th/fl: fire sprinklers permit relocate 37 , add 7 and delete 9 sprinklers on the ti#2024-1223-7318.
Details
Permit
202503242854
Permit issued
Mar 24, 2025
Final sign-off
May 13, 2025

12th/fl: fire sprinklers permit relocate 37 , add 7 and delete 9 sprinklers on the ti#2024-1223-7318.

Open the permit page

$15,000
Mar 7, 2025Completed
final sign-off Mar 2025
2000 Mckinnon Avti fire sprinkler add 16 fire sprinklers ti#2024-1121-5509
Details
Permit
202503071791
Permit issued
Mar 7, 2025
Final sign-off
Mar 21, 2025

ti fire sprinkler add 16 fire sprinklers ti#2024-1121-5509

Open the permit page

$10,000
Jan 23, 2025In progress
issued Feb 2025
655 Montgomery Streplace e) peerless fire pump rated at 750 gpm @ 220 psi w/ a new peerless fire pump of the same model rated at 750 gpm @ 220 psi
Details
Permit
202501238908
Permit issued
Feb 27, 2025

replace e) peerless fire pump rated at 750 gpm @ 220 psi w/ a new peerless fire pump of the same model rated at 750 gpm @ 220 psi

Open the permit page

$190,000
Dec 10, 2024Completed
final sign-off Mar 2025
71 Stevenson St10/f: fire sprinkler permit. relocate 71, add 8, and delete 10 sprinklers on the 10th floor. ti# 202410183227
Details
Permit
202412106491
Permit issued
Dec 10, 2024
Final sign-off
Mar 13, 2025

10/f: fire sprinkler permit. relocate 71, add 8, and delete 10 sprinklers on the 10th floor. ti# 202410183227

Open the permit page

$25,000
Aug 25, 2023Completed
final sign-off Oct 2023
235 Montgomery St26/f: ti upgrade of the existing fire sprinkler system. ref permit 202305177973. pendent: relocate 20, add 4, delete 2. upright sprinklers: relocate 19, add 5, delete 1.
Details
Permit
202308255291
Permit issued
Aug 28, 2023
Final sign-off
Oct 23, 2023

26/f: ti upgrade of the existing fire sprinkler system. ref permit 202305177973. pendent: relocate 20, add 4, delete 2. upright sprinklers: relocate 19, add 5, delete 1.

Open the permit page

$16,000
Aug 25, 2023Never finaled
issued Aug 2023, no final
1 Embarcadero Center13/f: ti upgrade of existing fire sprinkler system. relocate 18 pendents, add 5 pendent, delete 4 pendent, relocate 5 upright sprinklers, delete 1 upright sprinklers
Details
Permit
202308255283
Permit issued
Aug 28, 2023

13/f: ti upgrade of existing fire sprinkler system. relocate 18 pendents, add 5 pendent, delete 4 pendent, relocate 5 upright sprinklers, delete 1 upright sprinklers

Open the permit page

$9,000
May 30, 2023Completed
final sign-off Jun 2024
600 Montgomery Stf/s voluntary elevator modernization to garage elevators 1 & 2 only.
Details
Permit
202305308778
Permit issued
May 30, 2023
Final sign-off
Jun 21, 2024

f/s voluntary elevator modernization to garage elevators 1 & 2 only.

Open the permit page

$7,500
Apr 6, 2023Completed
final sign-off May 2023
55 Stockton St7/f: t.i., relocate (8) (e) sprinkers, add (11) new sprinklers. no other work. ref bpa#202303093308
Details
Permit
202304065154
Permit issued
Apr 7, 2023
Final sign-off
May 19, 2023

7/f: t.i., relocate (8) (e) sprinkers, add (11) new sprinklers. no other work. ref bpa#202303093308

Open the permit page

$2,500
Sep 23, 2022Completed
final sign-off Dec 2022
101 Post Stvoluntary elevator modernization per sffd letter remove sprinkler heads all piping from mech, top of shaft and pit. no other work.
Details
Permit
202209233014
Permit issued
Sep 23, 2022
Final sign-off
Dec 30, 2022

voluntary elevator modernization per sffd letter remove sprinkler heads all piping from mech, top of shaft and pit. no other work.

Open the permit page

$1,000
Sep 19, 2022Completed
final sign-off Nov 2022
236 Post Stvoluntary elevator modernization: remove sprinklers from top and pit per sffd letter 08/26/2022. no other work to system.
Details
Permit
202209192692
Permit issued
Sep 19, 2022
Final sign-off
Nov 15, 2022

voluntary elevator modernization: remove sprinklers from top and pit per sffd letter 08/26/2022. no other work to system.

Open the permit page

$1,000
Sep 19, 2022Completed
final sign-off Oct 2022
388 Market St10/f: fire sprinkler for ti. relocate 11 pendent sprinklers. ref permit 202201256575
Details
Permit
202209192693
Permit issued
Sep 19, 2022
Final sign-off
Oct 26, 2022

10/f: fire sprinkler for ti. relocate 11 pendent sprinklers. ref permit 202201256575

Open the permit page

$4,000
Sep 19, 2022Never finaled
issued Sep 2022, no final
55 Stockton Stlobby: relocate 10 ex pendents, add 1, replace 4 existing with new sprinkler. ref permit 202205053663
Details
Permit
202209192689
Permit issued
Sep 23, 2022

lobby: relocate 10 ex pendents, add 1, replace 4 existing with new sprinkler. ref permit 202205053663

Open the permit page

$1,000
Aug 25, 2022Never finaled
issued Aug 2022, no final
600 Montgomery Stsuite 4200: upgrade (e) fire sprinkler system. 17 new fire pendents sprinklers & 2 relocated upright to pendent sprinlers. ref t.i. pa202205234807. maher n/a
Details
Permit
202208251268
Permit issued
Aug 25, 2022

suite 4200: upgrade (e) fire sprinkler system. 17 new fire pendents sprinklers & 2 relocated upright to pendent sprinlers. ref t.i. pa202205234807. maher n/a

Open the permit page

$3,000
Aug 5, 2022Completed
final sign-off Aug 2022
255 California Stfire sprinkler - relocate 31, add 4 and replace 20 fire sprinklers on the 8th fl. ref pa# 202206277197
Details
Permit
202208059978
Permit issued
Aug 5, 2022
Final sign-off
Aug 15, 2022

fire sprinkler - relocate 31, add 4 and replace 20 fire sprinklers on the 8th fl. ref pa# 202206277197

Open the permit page

$15,000
Jul 11, 2022Completed
final sign-off Mar 2023
250 Montgomery St9th fl: fire sprinkler permit. remove 39 pendent sprinklers and install 47 new uprights. ref pa# 202104208943.
Details
Permit
202207118121
Permit issued
Jul 11, 2022
Final sign-off
Mar 6, 2023

9th fl: fire sprinkler permit. remove 39 pendent sprinklers and install 47 new uprights. ref pa# 202104208943.

Open the permit page

$11,000
Jul 8, 2022Completed
final sign-off Jul 2022
101 Mission St17th fl: fire sprinkler permit. relocate 1 and add 1 pendent sprinkler. ref pa# 202205204702.
Details
Permit
202207087975
Permit issued
Jul 8, 2022
Final sign-off
Jul 29, 2022

17th fl: fire sprinkler permit. relocate 1 and add 1 pendent sprinkler. ref pa# 202205204702.

Open the permit page

$1,000
Jun 16, 2022Completed
final sign-off Nov 2022
525 Brannan Sttenant improvement to lobby ceiling: lower 2 existing pendent heads to suit new ceiling. no other work. ref pa# 202103126500
Details
Permit
202206166452
Permit issued
Sep 19, 2022
Final sign-off
Nov 1, 2022

tenant improvement to lobby ceiling: lower 2 existing pendent heads to suit new ceiling. no other work. ref pa# 202103126500

Open the permit page

$100
Jun 14, 2022Never finaled
issued Nov 2022, no final
343 Sansome Stbasement: fire sprinkler replace diesel fire pump with new to match existing. revise suction to meet current code. electric work by others. ref pa# 202106092029.
Details
Permit
202206146244
Permit issued
Nov 4, 2022

basement: fire sprinkler replace diesel fire pump with new to match existing. revise suction to meet current code. electric work by others. ref pa# 202106092029.

Open the permit page

$287,335
Jun 14, 2022Completed
final sign-off Jul 2022
655 Montgomery St14th fl: fire sprinkler permit. 1 added upright. 1 added pendent. 12 relocated pendent sprinklers to upright sprinklers. 3 relocated pendent sprinklers.
Details
Permit
202206146243
Permit issued
Jun 14, 2022
Final sign-off
Jul 13, 2022

14th fl: fire sprinkler permit. 1 added upright. 1 added pendent. 12 relocated pendent sprinklers to upright sprinklers. 3 relocated pendent sprinklers.

Open the permit page

$2,000
Jun 7, 2022Never finaled
issued Jun 2022, no final
180 Montgomery Stfire sprinkler t.i. (36) relocated pendent sprinklers (4) added pendent sprinklers. (t.i 2022-0428-3213)
Details
Permit
202206075730
Permit issued
Jun 7, 2022

fire sprinkler t.i. (36) relocated pendent sprinklers (4) added pendent sprinklers. (t.i 2022-0428-3213)

Open the permit page

$2,000
Jun 7, 2022Never finaled
issued Jun 2022, no final
1 Market Stfire sprinkler t.i. (8) relocated and (1) deleted pendent sprinkler heads re permit# 2022-0426-3002
Details
Permit
202206075733
Permit issued
Jun 7, 2022

fire sprinkler t.i. (8) relocated and (1) deleted pendent sprinkler heads re permit# 2022-0426-3002

Open the permit page

$2,000
Jun 6, 2022Never finaled
issued Jun 2022, no final
100 34th Avtenant improvement to hoefer gallery: 5 (e) pendents to remain; relocate fire pendents, add 2 pendent sprinklers. ref pa 202204212736
Details
Permit
202206065631
Permit issued
Jun 6, 2022

tenant improvement to hoefer gallery: 5 (e) pendents to remain; relocate fire pendents, add 2 pendent sprinklers. ref pa 202204212736

Open the permit page

$2,000
Jun 3, 2022Never finaled
issued Jun 2022, no final
1390 Market Stste 1125: relocate 11 (e) pendent sprinkler heads. add 2 pendent sprinklers to suit tenant improvement. ref pa# 202201186122.
Details
Permit
202206035537
Permit issued
Jun 3, 2022

ste 1125: relocate 11 (e) pendent sprinkler heads. add 2 pendent sprinklers to suit tenant improvement. ref pa# 202201186122.

Open the permit page

$2,000
May 31, 2022Never finaled
issued Jun 2022, no final
60 Spear Strelocate 6 (e) pendent sprinklers in basement offices. no other work to the system. ref pa# 202112164532.
Details
Permit
202205315311
Permit issued
Jun 2, 2022

relocate 6 (e) pendent sprinklers in basement offices. no other work to the system. ref pa# 202112164532.

Open the permit page

$1,000
May 26, 2022Completed
final sign-off Jul 2022
1 Warriors Wygorund fl, space 24 & 25: fire sprinkler permit. install 5 new pendent sprinklers. ref pa# 201912189963.
Details
Permit
202205265069
Permit issued
May 26, 2022
Final sign-off
Jul 13, 2022

gorund fl, space 24 & 25: fire sprinkler permit. install 5 new pendent sprinklers. ref pa# 201912189963.

Open the permit page

$3,000
May 13, 2022Completed
final sign-off Aug 2022
345 Spear Stvoluntary sprinkler removal. ref pa# 202205114018. remove 2 upright sprinklers & piping from hoistway top. remove 2 upright sprinklers & piping at elevator pit.
Details
Permit
202205134220
Permit issued
Jun 24, 2022
Final sign-off
Aug 8, 2022

voluntary sprinkler removal. ref pa# 202205114018. remove 2 upright sprinklers & piping from hoistway top. remove 2 upright sprinklers & piping at elevator pit.

Open the permit page

$1,000
Apr 26, 2022Completed
final sign-off Aug 2022
1 Market St10th fl fire sprinkler tenant improvement. 8 relocated and 2 deleted pendent heads. ref pa# 202203079332
Details
Permit
202204263002
Permit issued
Apr 28, 2022
Final sign-off
Aug 17, 2022

10th fl fire sprinkler tenant improvement. 8 relocated and 2 deleted pendent heads. ref pa# 202203079332

Open the permit page

$4,150
Apr 26, 2022Completed
final sign-off Jun 2022
275 Battery St11th fl fire sprinkler permit. relocate 50, add 14, and delete 3 sprinklers. ref ti pa# 202110019674.
Details
Permit
202204263001
Permit issued
Apr 28, 2022
Final sign-off
Jun 22, 2022

11th fl fire sprinkler permit. relocate 50, add 14, and delete 3 sprinklers. ref ti pa# 202110019674.

Open the permit page

$18,000
Apr 22, 2022Completed
final sign-off Jun 2022
200 Larkin Stfire tenant improvement to decommission temporary exhibit. delete 6 (e) pendents. relocate 5 upright sprinklers. no other work to system. ref pa# 202203210393.
Details
Permit
202204222763
Permit issued
Apr 22, 2022
Final sign-off
Jun 9, 2022

fire tenant improvement to decommission temporary exhibit. delete 6 (e) pendents. relocate 5 upright sprinklers. no other work to system. ref pa# 202203210393.

Open the permit page

$2,000
Apr 22, 2022Completed
final sign-off Jun 2025
1800 Owens St4th floor: fire sprinkler t.i.. 28 relocated pendents. 56 added pendents, 5 deleted pendents, 19 relocated upright - 103 heads total. ref pa# 202109087932
Details
Permit
202204222764
Permit issued
May 2, 2022
Final sign-off
Jun 18, 2025

4th floor: fire sprinkler t.i.. 28 relocated pendents. 56 added pendents, 5 deleted pendents, 19 relocated upright - 103 heads total. ref pa# 202109087932

Open the permit page

$38,370
Apr 19, 2022Completed
final sign-off Aug 2022
101 02nd Stvoluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022.
Details
Permit
202204192468
Permit issued
Apr 19, 2022
Final sign-off
Aug 9, 2022

voluntary elevator modification. remove 10 (e) pendent sprinklers from low rise mech. remove 8 (e) upright sprinklers in high rise mech per sffd letter dated 2/14/2022.

Open the permit page

$1,000
Apr 19, 2022Completed
final sign-off Jun 2022
840 Post Stvoluntary elevator sprinkler removal. remove 2 (e) sidewall sprinklers at elevator pit. remove 2 (e) upright sprinklers at mech.
Details
Permit
202204192465
Permit issued
Apr 19, 2022
Final sign-off
Jun 9, 2022

voluntary elevator sprinkler removal. remove 2 (e) sidewall sprinklers at elevator pit. remove 2 (e) upright sprinklers at mech.

Open the permit page

$1,000
Apr 11, 2022Completed
final sign-off Jun 2022
44 Montgomery St35th fl: fire sprinkler permit. relocate 5, add 1 & delete 2 sprinklers . ref ti pa# 202106253267.
Details
Permit
202204111918
Permit issued
Apr 12, 2022
Final sign-off
Jun 9, 2022

35th fl: fire sprinkler permit. relocate 5, add 1 & delete 2 sprinklers . ref ti pa# 202106253267.

Open the permit page

$2,000
Apr 11, 2022Completed
final sign-off Aug 2022
185 Berry St1st fl: fire sprinkler permit. relocate 6, add 11 & delete 13 sprinklers . ref ti pa# 202108096037.
Details
Permit
202204111919
Permit issued
Apr 12, 2022
Final sign-off
Aug 24, 2022

1st fl: fire sprinkler permit. relocate 6, add 11 & delete 13 sprinklers . ref ti pa# 202108096037.

Open the permit page

$7,000
Apr 8, 2022Never finaled
issued Apr 2022, no final
121 Spear St1st fl: fire sprinkler permit (space b14). relocate 2 and delete 3 sprinklers. ti pa# 202010086136
Details
Permit
202204081849
Permit issued
Apr 8, 2022

1st fl: fire sprinkler permit (space b14). relocate 2 and delete 3 sprinklers. ti pa# 202010086136

Open the permit page

$2,000
Apr 8, 2022Completed
final sign-off Jun 2022
121 Spear St1st fl: fire sprinkler permit (space b3 & b4). delete 6 pendent sprinklers and add 5 new upright sprinklers.
Details
Permit
202204081846
Permit issued
Apr 8, 2022
Final sign-off
Jun 9, 2022

1st fl: fire sprinkler permit (space b3 & b4). delete 6 pendent sprinklers and add 5 new upright sprinklers.

Open the permit page

$2,500
Apr 6, 2022Never finaled
issued Apr 2022, no final
1333 Bush Stvoluntary elevator modernization per sffd letter dated 8/16/21. delete 2 upright sprinklers in pit. delete 4 uprights at mech penthouse. delete 1 sidewall at top.
Details
Permit
202204061684
Permit issued
Apr 6, 2022

voluntary elevator modernization per sffd letter dated 8/16/21. delete 2 upright sprinklers in pit. delete 4 uprights at mech penthouse. delete 1 sidewall at top.

Open the permit page

$1,000
Apr 4, 2022Completed
final sign-off Feb 2023
55 Mason Strev to fire sprinkler pa202102164727. 68 new upright sprinklers inthe attic space. 2 new upright sprinler and 3 new pendent sprinklers on the 1/f.
Details
Permit
202204041480
Permit issued
Apr 4, 2022
Final sign-off
Feb 21, 2023

rev to fire sprinkler pa202102164727. 68 new upright sprinklers inthe attic space. 2 new upright sprinler and 3 new pendent sprinklers on the 1/f.

Open the permit page

$35,000
Apr 4, 2022Completed
final sign-off Apr 2022
1 Maritime Pz22/f: relocate 6 fire sprinker heads and add 1 pendent sprinkler on the 22/f. ref t.i pa202202178202. maher n/a
Details
Permit
202204041479
Permit issued
Apr 4, 2022
Final sign-off
Apr 20, 2022

22/f: relocate 6 fire sprinker heads and add 1 pendent sprinkler on the 22/f. ref t.i pa202202178202. maher n/a

Open the permit page

$2,000
Mar 24, 2022Completed
final sign-off Oct 2022
730 Polk Stfire sprinkler permit. remove 2 sprinklers from top of the elevator shaft.
Details
Permit
202203240748
Permit issued
Mar 24, 2022
Final sign-off
Oct 5, 2022

fire sprinkler permit. remove 2 sprinklers from top of the elevator shaft.

Open the permit page

$1,000
Mar 21, 2022Completed
final sign-off Apr 2022
1 Kearny Stfire sprinkler permit. relocate 6, add 6 and delete 7 sprinklers on the basement level and floors 1 & 2. ref 202102164724
Details
Permit
202203210380
Permit issued
Mar 21, 2022
Final sign-off
Apr 18, 2022

fire sprinkler permit. relocate 6, add 6 and delete 7 sprinklers on the basement level and floors 1 & 2. ref 202102164724

Open the permit page

$4,500
Mar 14, 2022Completed
final sign-off Jun 2022
1 California St24th fl: fire sprinkler permit. relocate 21, add 1, and delete 6 pendent sprinklers. ref ti pa# 202110221003.
Details
Permit
202203149881
Permit issued
Mar 14, 2022
Final sign-off
Jun 6, 2022

24th fl: fire sprinkler permit. relocate 21, add 1, and delete 6 pendent sprinklers. ref ti pa# 202110221003.

Open the permit page

$5,500
Mar 14, 2022Completed
final sign-off Jun 2022
1 California St25th fl: fire sprinkler permit. relocate 25, add 8, and delete 3 sprinklers. ref ti pa# 202110221009.
Details
Permit
202203149882
Permit issued
Mar 14, 2022
Final sign-off
Jun 6, 2022

25th fl: fire sprinkler permit. relocate 25, add 8, and delete 3 sprinklers. ref ti pa# 202110221009.

Open the permit page

$5,500
Mar 3, 2022Completed
final sign-off Apr 2022
75 Hawthorne Stfire sprinkler elevator modernization per sffd letter dated 12/9/2021. 9 deleted sidewalls, 4 deleted pendent , 14 deleted uprights, 4 uprights installed outside roof level machine room.
Details
Permit
202203039100
Permit issued
Mar 3, 2022
Final sign-off
Apr 18, 2022

fire sprinkler elevator modernization per sffd letter dated 12/9/2021. 9 deleted sidewalls, 4 deleted pendent , 14 deleted uprights, 4 uprights installed outside roof level machine room.

Open the permit page

$20,162
Mar 3, 2022Completed
final sign-off Aug 2022
140 New Montgomery Stfire only review to remove and replace existing electeric driven fire pump and motor in kind. per details on sheet fp-2, fp-3, and fp-4 including electrical isolation, safe off of old pump and connection of new pump motor and new fire pump controller
Details
Permit
202203039183
Permit issued
Apr 21, 2022
Final sign-off
Aug 4, 2022

fire only review to remove and replace existing electeric driven fire pump and motor in kind. per details on sheet fp-2, fp-3, and fp-4 including electrical isolation, safe off of old pump and connection of new pump motor and new fire pump controller

Open the permit page

$175,000
Feb 25, 2022Completed
final sign-off Aug 2022
199 Fremont Stti to lobby space. delete 18 (e) sprinklers; relocate 51 pendant sprinklers. add one pendant sprinkler. permit 202106142325
Details
Permit
202202258673
Permit issued
Feb 25, 2022
Final sign-off
Aug 1, 2022

ti to lobby space. delete 18 (e) sprinklers; relocate 51 pendant sprinklers. add one pendant sprinkler. permit 202106142325

Open the permit page

$5,000
Feb 3, 2022Completed
final sign-off Mar 2022
33 Falmouth Stti to (e) sprinkler system: relocate 2 (e) uprights, add 3 new upright sprinklers, delete 1 (e) upright sprinkler, no other work. ref ti permit 202112033675.
Details
Permit
202202037217
Permit issued
Mar 1, 2022
Final sign-off
Mar 29, 2022

ti to (e) sprinkler system: relocate 2 (e) uprights, add 3 new upright sprinklers, delete 1 (e) upright sprinkler, no other work. ref ti permit 202112033675.

Open the permit page

$5,000
Jan 27, 2022Completed
final sign-off Aug 2022
1550 Bryant Stremove fire sprinklers per sffd letter dated feb 24, 2020. 3 deleted sidewall in pits. 8 deleted upright sprinklers (3 in shaft + 5 in machine rm.
Details
Permit
202201276735
Permit issued
Jan 27, 2022
Final sign-off
Aug 12, 2022

remove fire sprinklers per sffd letter dated feb 24, 2020. 3 deleted sidewall in pits. 8 deleted upright sprinklers (3 in shaft + 5 in machine rm.

Open the permit page

$7,328
Jan 20, 2022Completed
final sign-off Mar 2022
737 Post Stfire sprinkler voluntary elevator modernization. remove all pipe from elevator machine room & shafts based on sffd letter dated 12/17/21, (2) deleted sidewall, (4) deleted uprights, & (2) deleted pendent
Details
Permit
202201206274
Permit issued
Feb 25, 2022
Final sign-off
Mar 10, 2022

fire sprinkler voluntary elevator modernization. remove all pipe from elevator machine room & shafts based on sffd letter dated 12/17/21, (2) deleted sidewall, (4) deleted uprights, & (2) deleted pendent

Open the permit page

$7,815
Dec 21, 2021Completed
final sign-off Jun 2022
1390 Market Stinstall 28 new pendent sprinklers, relocate 9 (e) upright sprinklers in carbon health suite only. ref to t.i. 202110080151
Details
Permit
202112214772
Permit issued
Apr 6, 2022
Final sign-off
Jun 22, 2022

install 28 new pendent sprinklers, relocate 9 (e) upright sprinklers in carbon health suite only. ref to t.i. 202110080151

Open the permit page

$5,000
Sep 17, 2021Completed
final sign-off Dec 2021
2789 25th Stfire sprinkler permit. relocate 15, add 20 and delete 18 sprinklers on the 2/f. t.i ref #201906052532
Details
Permit
202109178619
Permit issued
Sep 17, 2021
Final sign-off
Dec 16, 2021

fire sprinkler permit. relocate 15, add 20 and delete 18 sprinklers on the 2/f. t.i ref #201906052532

Open the permit page

$15,000
Aug 16, 2021Completed
final sign-off Sep 2021
1515 03rd St6/f: fire sprinkler permit. relocate 2 sprinklers for new restroom. ref. ti pa 202106011405
Details
Permit
202108166457
Permit issued
Aug 16, 2021
Final sign-off
Sep 10, 2021

6/f: fire sprinkler permit. relocate 2 sprinklers for new restroom. ref. ti pa 202106011405

Open the permit page

$1,000
Aug 16, 2021Completed
final sign-off Jun 2025
333 Ofarrell Stfire sprinkler permit. replace 426, relocate 38, add 15 and delete 9 sprinklers for the grand ballroom renovation. ref. ti pa 201910306012
Details
Permit
202108166456
Permit issued
Aug 16, 2021
Final sign-off
Jun 24, 2025

fire sprinkler permit. replace 426, relocate 38, add 15 and delete 9 sprinklers for the grand ballroom renovation. ref. ti pa 201910306012

Open the permit page

$100,000
Jul 29, 2021Completed
final sign-off Aug 2021
3065 Jackson St2/f: fire sprinkler permit. relocate 10, add 12, and delete 5 sprinklers on the 2nd fl ti 202106102150
Details
Permit
202107295340
Permit issued
Jul 29, 2021
Final sign-off
Aug 17, 2021

2/f: fire sprinkler permit. relocate 10, add 12, and delete 5 sprinklers on the 2nd fl ti 202106102150

Open the permit page

$6,500
Jun 11, 2021Completed
final sign-off Dec 2021
1 Warriors Wyfire sprinkler permit relocate 1 and add 9 sprinklers for new ceiling in corridor. ti # 2020-1019-6892
Details
Permit
202106112269
Permit issued
Jul 29, 2021
Final sign-off
Dec 31, 2021

fire sprinkler permit relocate 1 and add 9 sprinklers for new ceiling in corridor. ti # 2020-1019-6892

Open the permit page

$2,000
Jun 11, 2021Completed
final sign-off Aug 2021
1 Warriors Wyfire sprinkler permit relocate 2 and add 1 sprinkler for kitchen renovation on level 050. ti # 2020-1002-5776
Details
Permit
202106112270
Permit issued
Jul 29, 2021
Final sign-off
Aug 16, 2021

fire sprinkler permit relocate 2 and add 1 sprinkler for kitchen renovation on level 050. ti # 2020-1002-5776

Open the permit page

$1,000
Sep 8, 2020Completed
final sign-off Nov 2020
1800 Owens Stfire sprinkler ti: pantry addition. relocate 2 & add 5 pendents. relocate 5 & add 1 upright. total 13 sprinklers. ref pa# 202002144521
Details
Permit
202009083678
Permit issued
Oct 21, 2020
Final sign-off
Nov 9, 2020

fire sprinkler ti: pantry addition. relocate 2 & add 5 pendents. relocate 5 & add 1 upright. total 13 sprinklers. ref pa# 202002144521

Open the permit page

$2,730
Aug 22, 2020Completed
final sign-off Oct 2020
100 Hooper Stunit #8: upgrade if existing fire sprinkler system. 37 additional upright sprinklers. 1 deleted upright sprinkler.
Details
Permit
202008222438
Permit issued
Aug 27, 2020
Final sign-off
Oct 16, 2020

unit #8: upgrade if existing fire sprinkler system. 37 additional upright sprinklers. 1 deleted upright sprinkler.

Open the permit page

$11,100
Jun 17, 2020Completed
final sign-off Oct 2020
1 California St31/f: fire sprinkler tenant improvement. relocate 6 and add 3 sprinklers. reference permit # 2019-1223-0407.
Details
Permit
202006178863
Permit issued
Aug 13, 2020
Final sign-off
Oct 15, 2020

31/f: fire sprinkler tenant improvement. relocate 6 and add 3 sprinklers. reference permit # 2019-1223-0407.

Open the permit page

$3,000
Jun 16, 2020Completed
final sign-off Aug 2020
180 Montgomery StBevilacqua & Sonsfire sprinkler tenant improvement. relocate 4 sprinklers on the 18th floor. reference permit # 2020-0220-4940
Details
Permit
202006168798
Permit issued
Aug 13, 2020
Final sign-off
Aug 21, 2020

fire sprinkler tenant improvement. relocate 4 sprinklers on the 18th floor. reference permit # 2020-0220-4940

Open the permit page

$1,000
Jun 16, 2020Never finaled
issued Dec 2020, no final
1650 Mission Stfire sprinkler tenant improvement. remove all sprinklers and sprinkler pipe from elevator machine rooms and top of elevator shafts. based on ssfd letter dated 04/18/2019.
Details
Permit
202006168799
Permit issued
Dec 9, 2020

fire sprinkler tenant improvement. remove all sprinklers and sprinkler pipe from elevator machine rooms and top of elevator shafts. based on ssfd letter dated 04/18/2019.

Open the permit page

$2,500
May 6, 2020Completed
final sign-off Aug 2021
633 Folsom St2/f: fire sprinkler ti: 138 added pendent, 4 added sidwalls, 5 relocated upright, 41 added upright = 188 heads total, ref pa#201912230281
Details
Permit
202005067338
Permit issued
Nov 10, 2020
Final sign-off
Aug 4, 2021

2/f: fire sprinkler ti: 138 added pendent, 4 added sidwalls, 5 relocated upright, 41 added upright = 188 heads total, ref pa#201912230281

Open the permit page

$39,480
Aug 1, 2019Expired or cancelled
cancelled Oct 2021
201 Mission Stfire sprinkler permit. relocate 15 sprinklers on the 13th floor. ti #2019-0620-3986.
Details
Permit
201908017547
Permit issued
Aug 5, 2019

fire sprinkler permit. relocate 15 sprinklers on the 13th floor. ti #2019-0620-3986.

Open the permit page

$3,500