Block 0304, lot 021
737 Post St
- City’s use
- Multi-Family Residential
- Built
- 1989
- Stories
- 16
- Units
- 137
- Rooms
- 137 bathrooms
- Building
- 63,446 sq ft
- Lot
- 10,656 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
79 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 737 Post St | Everon Llc | to verify (e) sound levels in sleeping areas. to comply with sffc 103.7.6.1.Details
to verify (e) sound levels in sleeping areas. to comply with sffc 103.7.6.1. | |
| Nov 21, 2024 | Completed final sign-off Apr 2025 | 737 Post St | Norcal Construction & Maintenance Inc | remove and replace service door 19'11" x 10'8" like for like with lift master motar operation to replace exiting.Details
remove and replace service door 19'11" x 10'8" like for like with lift master motar operation to replace exiting. | $18,000 |
| Jan 20, 2022 | Completed final sign-off Mar 2022 | 737 Post St | R L H Fire Protection Inc | fire sprinkler voluntary elevator modernization. remove all pipe from elevator machine room & shafts based on sffd letter dated 12/17/21, (2) deleted sidewall, (4) deleted uprights, & (2) deleted pendentDetails
fire sprinkler voluntary elevator modernization. remove all pipe from elevator machine room & shafts based on sffd letter dated 12/17/21, (2) deleted sidewall, (4) deleted uprights, & (2) deleted pendent | $7,815 |
| Dec 16, 2021 | Never finaled issued Jul 2022, no final | 737 Post St | Everon Llc | fire only: elevator modernization (elevator machine room) - relays for (2) primary recall, (2) alternate recall & (2) emr smoke detector for both tower a (post) & tower b (central)Details
fire only: elevator modernization (elevator machine room) - relays for (2) primary recall, (2) alternate recall & (2) emr smoke detector for both tower a (post) & tower b (central) | $12,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2021 | 737 Post St | G A Higgins, Inc | unit 315: only kitchen and bath remodel - replace existing cabinets, countertops, add gfci per codes, new light fixtures same location, new sink and faucets. new appliances. remodel in kind.Details
unit 315: only kitchen and bath remodel - replace existing cabinets, countertops, add gfci per codes, new light fixtures same location, new sink and faucets. new appliances. remodel in kind. | $9,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2021 | 737 Post St | G A Higgins, Inc | unit 521: only kitchen and bath remodel - replace existing cabinets, countertops, add gfci per codes, new light fixtures same location, new sink and faucets. new appliances. remodel in kind.Details
unit 521: only kitchen and bath remodel - replace existing cabinets, countertops, add gfci per codes, new light fixtures same location, new sink and faucets. new appliances. remodel in kind. | $9,000 |
| May 28, 2020 | Completed final sign-off Aug 2020 | 737 Post St | G A Higgins, Inc | unit 316: replace existing and damaged cabinets , countertops, install new appliances , light fixtures and everything will be as light per light. kitchen remodel in-kind.Details
unit 316: replace existing and damaged cabinets , countertops, install new appliances , light fixtures and everything will be as light per light. kitchen remodel in-kind. | $25,000 |
| May 20, 2020 | Completed final sign-off Aug 2020 | 737 Post St | G A Higgins, Inc | unit #412 replace cabinet, countertop, appliances, sink, light fixtures include one bath. all interior work. like for like. same location.Details
unit #412 replace cabinet, countertop, appliances, sink, light fixtures include one bath. all interior work. like for like. same location. | $25,000 |
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 737 Post St | G A Higgins, Inc | unit # 622: renovate kitchen (40sq ft) and bathroom (40sq ft). cabinets, sinks, lights, appliances.Details
unit # 622: renovate kitchen (40sq ft) and bathroom (40sq ft). cabinets, sinks, lights, appliances. | $25,000 |
| Aug 29, 2019 | Never finaled issued Aug 2019, no final | 737 Post St | G A Higgins, Inc | unit 433 - remove and replace kitchen & bath cabinets. new countertops, sinks, appliances, gfci'sDetails
unit 433 - remove and replace kitchen & bath cabinets. new countertops, sinks, appliances, gfci's | $26,000 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 737 Post St | Red Hawk Fire & Security Ca Llc | common stairs wells in floors 2/5/8/11/14: install firemans phone to (e) fa system total of (10) firemans phones n/a maherDetails
common stairs wells in floors 2/5/8/11/14: install firemans phone to (e) fa system total of (10) firemans phones n/a maher | $11,000 |
| Dec 18, 2018 | Completed final sign-off May 2019 | 737 Post St | G A Higgins, Inc | unit #124: kitchen and bath upgrade: new cabinets same layout. countertops, new appliances sink faucet, paint and flooring. no structural work. no wall modification.Details
unit #124: kitchen and bath upgrade: new cabinets same layout. countertops, new appliances sink faucet, paint and flooring. no structural work. no wall modification. | $30,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 737 Post St | G A Higgins, Inc | apt 235 & 1117 - kitchen & bath upgrade: new cabinets same layout, countertops, new appliances, sink, faucet, paint and flooring.Details
apt 235 & 1117 - kitchen & bath upgrade: new cabinets same layout, countertops, new appliances, sink, faucet, paint and flooring. | $36,000 |
| Mar 21, 2018 | Never finaled issued Mar 2018, no final | 737 Post St | G A Higgins, Inc | unit #1414: upgrade (1) kitchen and (1) bath insidw the dwelling unit new cabinets same location, new countertops, sink, faucet appliances, faucet, replace fixture to fixture and full paint. no wall alterationDetails
unit #1414: upgrade (1) kitchen and (1) bath insidw the dwelling unit new cabinets same location, new countertops, sink, faucet appliances, faucet, replace fixture to fixture and full paint. no wall alteration | $8,000 |
| Sep 29, 2017 | Never finaled issued Sep 2017, no final | 737 Post St | G A Higgins, Inc | unit 435 - upgrade kitchen & bath, replace cabinets, same lauyout, countertops; appliances, sink, faucets, light fixtures, full paint.Details
unit 435 - upgrade kitchen & bath, replace cabinets, same lauyout, countertops; appliances, sink, faucets, light fixtures, full paint. | $8,000 |
| Mar 23, 2017 | Completed final sign-off Oct 2017 | 737 Post St | G A Higgins, Inc | to comply with nov # 201766951, replacing cabinets, counter tops appliances, light fixtures, plumbing fixtures, (faucets) full painting, remodel kitchen w/o permit, all (n) lightes shall be ledDetails
to comply with nov # 201766951, replacing cabinets, counter tops appliances, light fixtures, plumbing fixtures, (faucets) full painting, remodel kitchen w/o permit, all (n) lightes shall be led | $1,000 |
| Jan 19, 2016 | Never finaled issued Jan 2016, no final | 737 Post St | street spaceDetails
street space | ||
| Sep 9, 2010 | Completed final sign-off Nov 2010 | 737 Post St | On-Site Maintenance | front tower # 1515, # 911; upgrade kitchen cabinets and counter top. no structural work, no new lighting, no electric work, no. windows, no doors. min. 50% of kitchen lighting watt in h.e. light per cec 150 (k)Details
front tower # 1515, # 911; upgrade kitchen cabinets and counter top. no structural work, no new lighting, no electric work, no. windows, no doors. min. 50% of kitchen lighting watt in h.e. light per cec 150 (k) | $10,200 |
| Sep 9, 2010 | Completed final sign-off Oct 2010 | 737 Post St | On-Site Maintenance | central tower # 1624, 1424, #1225; upgrade kitchen cabinets and counter top. no structural work, no new lighting, no electric work, no windows, no doors. min. 50% of kitchen lighting watt in h.e. light per cec 150 (k)Details
central tower # 1624, 1424, #1225; upgrade kitchen cabinets and counter top. no structural work, no new lighting, no electric work, no windows, no doors. min. 50% of kitchen lighting watt in h.e. light per cec 150 (k) | $10,200 |
| Aug 2, 2010 | Completed final sign-off Sep 2010 | 737 Post St | On-Site Maintenance | central tower #1325, 1625, 535 - replace kitchen cabinets & counter top, no structural work, no windows & doors, no electrical, no light fixtures.Details
central tower #1325, 1625, 535 - replace kitchen cabinets & counter top, no structural work, no windows & doors, no electrical, no light fixtures. | $24,600 |
| Aug 2, 2010 | Completed final sign-off Sep 2010 | 737 Post St | On-Site Maintenance | front tower #1511, 1118, 418 - replace kitchen cabinets & coutner top. no structural work, no windows & doors, no electrical. no light fixtures.Details
front tower #1511, 1118, 418 - replace kitchen cabinets & coutner top. no structural work, no windows & doors, no electrical. no light fixtures. | $24,600 |
| Jul 8, 2010 | Expired or cancelled expired Jun 2013 | 737 Post St | On-Site Maintenance | central twoer, #1521, #923, #423, upgrade kitchen cabinets & counter tops, no structural, no lighting, no doors, no windows, no electrical workDetails
central twoer, #1521, #923, #423, upgrade kitchen cabinets & counter tops, no structural, no lighting, no doors, no windows, no electrical work | $27,000 |
| Jul 8, 2010 | Expired or cancelled expired Jun 2013 | 737 Post St | On-Site Maintenance | central tower #1322, #726, #626, upgrade kitchen cabinets & counter top, no structural , no new lights, no doors, no windows, no electrical workDetails
central tower #1322, #726, #626, upgrade kitchen cabinets & counter top, no structural , no new lights, no doors, no windows, no electrical work | $27,000 |
| Jul 8, 2010 | Completed final sign-off Feb 2011 | 737 Post St | On-Site Maintenance | central tower #1421, #1021, #1121, upgrade kitchen cabinets & counter top, no structural no new lights, no doors, no windows, no electrical workDetails
central tower #1421, #1021, #1121, upgrade kitchen cabinets & counter top, no structural no new lights, no doors, no windows, no electrical work | $27,000 |
| Jul 8, 2010 | Completed final sign-off Feb 2011 | 737 Post St | On-Site Maintenance | central tower #1025, #1026, #421; upgrade kitchen cabinets & counter top, no structural, no new lights, no doors, no windows, no electrical workDetails
central tower #1025, #1026, #421; upgrade kitchen cabinets & counter top, no structural, no new lights, no doors, no windows, no electrical work | $27,000 |
| Jul 8, 2010 | Expired or cancelled expired Jun 2013 | 737 Post St | On-Site Maintenance | front tower #1413, #718, #1411; upgrade kitchen cabinets & counter top, no structural no new lights, no doors, no windows, no electrical workDetails
front tower #1413, #718, #1411; upgrade kitchen cabinets & counter top, no structural no new lights, no doors, no windows, no electrical work | $27,000 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 737 Post St | On-Site Maintenance | rear tower #232: upgrade kitchen cabinets & counter top, no structural, no lighting, no windows, no doors, on this permitDetails
rear tower #232: upgrade kitchen cabinets & counter top, no structural, no lighting, no windows, no doors, on this permit | $9,800 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 737 Post St | On-Site Maintenance | #313: upgrade kitchen cabinets & counter top, no structural, no lighting, no windows no doors on this permitDetails
#313: upgrade kitchen cabinets & counter top, no structural, no lighting, no windows no doors on this permit | $9,800 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 737 Post St | On-Site Maintenance | central tower: #1121, #1621 & #1224, upgrade kitchen cabinets and countertop; no structural, no lighting, no windows, no doors on this permitDetails
central tower: #1121, #1621 & #1224, upgrade kitchen cabinets and countertop; no structural, no lighting, no windows, no doors on this permit | $30,200 |
| Feb 25, 2010 | Completed final sign-off Feb 2011 | 737 Post St | Young Electric Sign Co. | install 1 illuminated sign for tower 737Details
install 1 illuminated sign for tower 737 | $14,000 |
| Feb 25, 2010 | Completed final sign-off Feb 2011 | 737 Post St | Young Electric Sign Co. | install 1 canopy on wall or tower 737Details
install 1 canopy on wall or tower 737 | $14,000 |
| Feb 9, 2010 | Completed final sign-off Nov 2010 | 737 Post St | E.A.Davidovits &Co.,Inc. | revision to 200908245444 (1st floor): relocate/replace 4 electrical heaters to existing ti. patch/infill old heater cut-outs. field verify that required fire resistive construction is maintained.Details
revision to 200908245444 (1st floor): relocate/replace 4 electrical heaters to existing ti. patch/infill old heater cut-outs. field verify that required fire resistive construction is maintained. | $900 |
| Feb 9, 2010 | Completed final sign-off Feb 2011 | 737 Post St | On-Site Maintenance | rear tower #533: upgrade kitchen cabinets & countertop. no structural, no (n) lighting. no door, no window, no wall on this permitDetails
rear tower #533: upgrade kitchen cabinets & countertop. no structural, no (n) lighting. no door, no window, no wall on this permit | $6,700 |
| Dec 28, 2009 | Completed final sign-off Nov 2010 | 737 Post St | Aquamatic Fire Protection | relocate 11-sprinklers for lobby renovation. ref. appl.#2009/0824/5444.Details
relocate 11-sprinklers for lobby renovation. ref. appl.#2009/0824/5444. | $2,400 |
| Nov 19, 2009 | Completed final sign-off Jul 2010 | 737 Post St | On-Site Maintenance | front tower units: #1614, #1519, #1018, #417. upgrade kitchen cabinets & conter tops. no structural & no lighting.Details
front tower units: #1614, #1519, #1018, #417. upgrade kitchen cabinets & conter tops. no structural & no lighting. | $25,800 |
| Nov 19, 2009 | Expired or cancelled expired Jun 2013 | 737 Post St | On-Site Maintenance | central towers: units: #1022, #822, #926. upgrade kitchen & counter top, no structural & no lighting.Details
central towers: units: #1022, #822, #926. upgrade kitchen & counter top, no structural & no lighting. | $19,350 |
| Nov 10, 2009 | Completed final sign-off Mar 2016 | 737 Post St | Diversified Fire Products | 3 blgds total-retrofit of fire alarm system for all 3 buildings for post street towers (central, front & geary towers)Details
3 blgds total-retrofit of fire alarm system for all 3 buildings for post street towers (central, front & geary towers) | $851,000 |
| Oct 15, 2009 | Completed final sign-off Dec 2009 | 737 Post St | On-Site Maintenance | rear tower unit 531 - upgrade kitchen cabients & counter, no structural, no new lighting.Details
rear tower unit 531 - upgrade kitchen cabients & counter, no structural, no new lighting. | $6,300 |
| Oct 15, 2009 | Completed final sign-off Dec 2009 | 737 Post St | On-Site Maintenance | front towers unit 116 & 411 - upgrade kitchen cabinets & counter, no structural & no new lighting.Details
front towers unit 116 & 411 - upgrade kitchen cabinets & counter, no structural & no new lighting. | $12,600 |
| Sep 8, 2009 | Completed final sign-off Oct 2009 | 737 Post St | On-Site Maintenance | post st. towers units # 1316, 1318 & 1415. upgrade kitchen cabinets & counter. no structural work.Details
post st. towers units # 1316, 1318 & 1415. upgrade kitchen cabinets & counter. no structural work. | $19,000 |
| Sep 8, 2009 | Completed final sign-off Oct 2009 | 737 Post St | On-Site Maintenance | central tower unit # 826. upgrade kitchen cabinets & counter. no structural work.Details
central tower unit # 826. upgrade kitchen cabinets & counter. no structural work. | $9,500 |
| Aug 24, 2009 | Completed final sign-off Nov 2010 | 737 Post St | E.A.Davidovits &Co.,Inc. | renovation of ground floor lobby & business offices. renovation of open air courtyard.Details
renovation of ground floor lobby & business offices. renovation of open air courtyard. | $150,000 |
| Aug 7, 2009 | Never finaled issued Aug 2009, no final | 737 Post St | street space & mtaDetails
street space & mta | ||
| Jul 1, 2009 | Completed final sign-off Aug 2009 | 737 Post St | On-Site Maintenance | post st towers, #918 & 1317, upgrade kitchen cabinets and counter ; no structuralDetails
post st towers, #918 & 1317, upgrade kitchen cabinets and counter ; no structural | $17,000 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 737 Post St | On-Site Maintenance | work @ central tower. unit# 525, # 921 & # 924 only. upgrade kitchen cabinets & counter. no structural.Details
work @ central tower. unit# 525, # 921 & # 924 only. upgrade kitchen cabinets & counter. no structural. | $45,000 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 737 Post St | On-Site Maintenance | work @ post street, tower. unit# 917 & # 1113 only. upgrade kitchen cabinets & counter. no structural.Details
work @ post street, tower. unit# 917 & # 1113 only. upgrade kitchen cabinets & counter. no structural. | $30,000 |
| May 22, 2009 | Completed final sign-off Jul 2009 | 737 Post St | On-Site Maintenance | work @ central tower unit# 1024. upgrade kitchen cabinets & counter. no structural. no lighting.Details
work @ central tower unit# 1024. upgrade kitchen cabinets & counter. no structural. no lighting. | $8,500 |
| May 22, 2009 | Completed final sign-off Jul 2009 | 737 Post St | On-Site Maintenance | work @ post street tower unit# 814. upgrade kitchen cabinets & counter. no structural. no lighting.Details
work @ post street tower unit# 814. upgrade kitchen cabinets & counter. no structural. no lighting. | $8,500 |
| May 14, 2009 | Completed final sign-off Aug 2009 | 737 Post St | On-Site Maintenance | work @ unit# 1417 post street tower only. upgrade kitchen cabinets & counter. no structural.Details
work @ unit# 1417 post street tower only. upgrade kitchen cabinets & counter. no structural. | $8,500 |
| May 4, 2009 | Completed final sign-off Aug 2009 | 737 Post St | On-Site Maintenance | work @ unit# 813 & # 1616 post street towers only. upgrade kitchen cabinets & counter top. no structural. no gyp board. no windows & no door work on this permit.Details
work @ unit# 813 & # 1616 post street towers only. upgrade kitchen cabinets & counter top. no structural. no gyp board. no windows & no door work on this permit. | $17,000 |
| Apr 21, 2009 | Never finaled issued Apr 2009, no final | 737 Post St | street space & mta.Details
street space & mta. | ||
| Apr 7, 2009 | Completed final sign-off May 2009 | 737 Post St | On-Site Maintenance | work @ unit# 925, # 1126 & # 1226 only. upgrade kitchen cabinets & counter. no structural.Details
work @ unit# 925, # 1126 & # 1226 only. upgrade kitchen cabinets & counter. no structural. | $26,000 |
| Apr 7, 2009 | Completed final sign-off May 2009 | 737 Post St | On-Site Maintenance | work @ unit# 1315, # 1116 & # 1117 only. upgrade kitchen cabinets & counter. no structural.Details
work @ unit# 1315, # 1116 & # 1117 only. upgrade kitchen cabinets & counter. no structural. | $26,000 |
| Mar 18, 2009 | Completed final sign-off May 2009 | 737 Post St | On-Site Maintenance | work on post st tower#1215. upgrade kitchen cabinets + counter, no structural.Details
work on post st tower#1215. upgrade kitchen cabinets + counter, no structural. | $8,500 |
| Mar 3, 2009 | Completed final sign-off May 2009 | 737 Post St | On-Site Maintenance | central tower #1523. upgrade kitchen and cabinets and counter. no structural.Details
central tower #1523. upgrade kitchen and cabinets and counter. no structural. | $8,500 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | post st. tower(front) #1217. upgrade kitchen cabinets and counter. no structuralDetails
post st. tower(front) #1217. upgrade kitchen cabinets and counter. no structural | $8,500 |
| Feb 4, 2009 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | work on central tower#1122. upgrade kitchen cabinets + counter. no structural . no changes to (e) floor plan.floor area -7'x6.Details
work on central tower#1122. upgrade kitchen cabinets + counter. no structural . no changes to (e) floor plan.floor area -7'x6. | $12,170 |
| Feb 4, 2009 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | work on front tower unit#1314 & #616. upgrade kitchen cabinets. floor area 7x6. no changes to (e) floor plan.Details
work on front tower unit#1314 & #616. upgrade kitchen cabinets. floor area 7x6. no changes to (e) floor plan. | $24,340 |
| Jan 22, 2009 | Never finaled issued Jan 2009, no final | 737 Post St | On-Site Maintenance | central tower. revision in app#200901089765. remove unit#924(central tower) no (work done in unit#924)Details
central tower. revision in app#200901089765. remove unit#924(central tower) no (work done in unit#924) | |
| Jan 22, 2009 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | unit#314,#516,#915,#1619 post street tower (front) upgrade kitchen cabinets + countertop. no structural, no lighting work.Details
unit#314,#516,#915,#1619 post street tower (front) upgrade kitchen cabinets + countertop. no structural, no lighting work. | $50,000 |
| Jan 8, 2009 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | front tower. unit#914,#1311, #1419 front tower . kitchen size :6'x7'. no other work, only cabinet replace. upgrade kitchen cabinets, non structural .total 3 units.Details
front tower. unit#914,#1311, #1419 front tower . kitchen size :6'x7'. no other work, only cabinet replace. upgrade kitchen cabinets, non structural .total 3 units. | $28,000 |
| Jan 8, 2009 | Completed final sign-off Jun 2009 | 737 Post St | On-Site Maintenance | central tower. unit#725,#825, #924,#1623,#1221. central tower. kitchen upgrade cabinets. non structural. kitchen size: 6' x 7' no other work. only cabinet replace total 4 kitchen.Details
central tower. unit#725,#825, #924,#1623,#1221. central tower. kitchen upgrade cabinets. non structural. kitchen size: 6' x 7' no other work. only cabinet replace total 4 kitchen. | $35,000 |
| Dec 3, 2008 | Completed final sign-off Jan 2009 | 737 Post St | On-Site Maintenance | work @ central tower unit#321 &3723. upgrade 2 kitchen cabinets & counter. no structural , no lighting or tile work.Details
work @ central tower unit#321 &3723. upgrade 2 kitchen cabinets & counter. no structural , no lighting or tile work. | $16,600 |
| Dec 3, 2008 | Completed final sign-off Jan 2009 | 737 Post St | On-Site Maintenance | work @ geary tower unit#534. upgrade 1 kitchen cabinets & counter. no structural work, no light or tile work.Details
work @ geary tower unit#534. upgrade 1 kitchen cabinets & counter. no structural work, no light or tile work. | $8,350 |
| Dec 3, 2008 | Completed final sign-off Jan 2009 | 737 Post St | On-Site Maintenance | work @ front tower (post st. tower) unit#1412,#1019, #715. upgrade 3 kitchen cabinets + counter. no structural no lighting or tile work.Details
work @ front tower (post st. tower) unit#1412,#1019, #715. upgrade 3 kitchen cabinets + counter. no structural no lighting or tile work. | $25,000 |
| Nov 19, 2008 | Completed final sign-off Dec 2008 | 737 Post St | On-Site Maintenance | work @ unit# 1724 central tower only. upgrade kitchen cabinets & counter in kind.Details
work @ unit# 1724 central tower only. upgrade kitchen cabinets & counter in kind. | $10,000 |
| Nov 4, 2008 | Completed final sign-off Jan 2009 | 737 Post St | On-Site Maintenance | work @ unit# 624. central tower. upgrade kitchen cabinets, counter. no structural.Details
work @ unit# 624. central tower. upgrade kitchen cabinets, counter. no structural. | $8,500 |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 737 Post St | On-Site Maintenance | work @ unit# 1114 & # 1319. front tower. upgrade kitchen cabinets, counter. no structural.Details
work @ unit# 1114 & # 1319. front tower. upgrade kitchen cabinets, counter. no structural. | $17,000 |
| Nov 4, 2008 | Completed final sign-off Apr 2009 | 737 Post St | On-Site Maintenance | work @ unit# 419, # 617, # 916. front tower. upgrade kitchen cabinets, counter. no structural.Details
work @ unit# 419, # 617, # 916. front tower. upgrade kitchen cabinets, counter. no structural. | $25,500 |
| Oct 27, 2008 | Never finaled issued Oct 2008, no final | 737 Post St | On-Site Maintenance | work @ unit# 1425, # 1723, # 922, central tower. upgrade kitchen cabinets & counter in kind. no structural.Details
work @ unit# 1425, # 1723, # 922, central tower. upgrade kitchen cabinets & counter in kind. no structural. | $25,500 |
| Oct 16, 2008 | Completed final sign-off Nov 2008 | 737 Post St | On-Site Maintenance | unit 1125 - central tower. replace kitchen cabinets & counter in kind. no structure.Details
unit 1125 - central tower. replace kitchen cabinets & counter in kind. no structure. | $8,500 |
| Oct 16, 2008 | Never finaled issued Oct 2008, no final | 737 Post St | On-Site Maintenance | unit 1514 - post front tower. replace kitchen cabinets & counter in kind. no structure.Details
unit 1514 - post front tower. replace kitchen cabinets & counter in kind. no structure. | $8,500 |
| Oct 1, 2008 | Completed final sign-off Nov 2008 | 737 Post St | On-Site Maintenance | work @ unit# 415 only. post street tower. new appliances. no new flooring. replace 1 kitchen cabinets, countertop in kind. no structural, no wall openings.Details
work @ unit# 415 only. post street tower. new appliances. no new flooring. replace 1 kitchen cabinets, countertop in kind. no structural, no wall openings. | $8,500 |
| Oct 1, 2008 | Completed final sign-off Nov 2008 | 737 Post St | On-Site Maintenance | work @ unit# 716 only. post street tower. new appliances. no new flooring. replace 1 kitchen cabinets, countertop in kind. no structural, no wall openings.Details
work @ unit# 716 only. post street tower. new appliances. no new flooring. replace 1 kitchen cabinets, countertop in kind. no structural, no wall openings. | $8,500 |
| Oct 1, 2008 | Completed final sign-off Nov 2008 | 737 Post St | On-Site Maintenance | work @ unit# 611 & # 614 only. post street tower. new appliances. no new flooring. replace 2 kitchen cabinets, countertop in kind. no structural, no wall openings.Details
work @ unit# 611 & # 614 only. post street tower. new appliances. no new flooring. replace 2 kitchen cabinets, countertop in kind. no structural, no wall openings. | $17,000 |
| Oct 1, 2008 | Completed final sign-off Jan 2009 | 737 Post St | On-Site Maintenance | work @ unit# 1516 & # 1517 only. post street tower. new appliances. no new flooring. replace 2 kitchen cabinets, countertop in kind. no structural, no wall openings.Details
work @ unit# 1516 & # 1517 only. post street tower. new appliances. no new flooring. replace 2 kitchen cabinets, countertop in kind. no structural, no wall openings. | $17,000 |
| Sep 18, 2008 | Completed final sign-off Mar 2009 | 737 Post St | On-Site Maintenance | work on unit#1423. no wall/opening change, no new flooring. replace kitchen cabinets + counter. no structural replace existing light w/fluorescent.Details
work on unit#1423. no wall/opening change, no new flooring. replace kitchen cabinets + counter. no structural replace existing light w/fluorescent. | $10,000 |
| Sep 18, 2008 | Completed final sign-off Dec 2008 | 737 Post St | On-Site Maintenance | work on unit#815. no wall/opning change, no new flooring. replace kitchen cabinets + counter. no structural replace existing light w/fluorescent.Details
work on unit#815. no wall/opning change, no new flooring. replace kitchen cabinets + counter. no structural replace existing light w/fluorescent. | $10,000 |
| Mar 17, 2008 | Never finaled issued Apr 2008, no final | 737 Post St | Simplex Grinnell | add one fire sprinkler head on the basement floorDetails
add one fire sprinkler head on the basement floor | $1,250 |