Perez & Perez General Contractor Inc
- Based in
- Oakland
- On San Francisco permits
- Nov 2018 to Nov 2021
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2021 | Never finaled issued Nov 2021, no final | 220 Santa Ana Av | repair a section of the foundaion in need of repair, like for like replacement, not comply to curent building codeDetails
repair a section of the foundaion in need of repair, like for like replacement, not comply to curent building code | $8,600 |
| Nov 25, 2020 | Completed final sign-off May 2021 | 1451 10th Av | voluntary seismic retrofit of the lowest level at existing 3 story bldg.Details
voluntary seismic retrofit of the lowest level at existing 3 story bldg. | $12,500 |
| Sep 1, 2020 | Completed final sign-off Dec 2020 | 53 Miramar Av | first floor framing and foundation repair.Details
first floor framing and foundation repair. | $20,000 |
| Jul 15, 2020 | Never finaled issued Sep 2020, no final | 1451 10th Av | voluntary seismic strengthening to lower levelDetails
voluntary seismic strengthening to lower level | $7,500 |
| Oct 9, 2019 | Completed final sign-off Jan 2020 | 74 Mallorca Wy | voluntary seismic upgrade of ground floor, plywood shearwall new framing. revision to app#201907236621.Details
voluntary seismic upgrade of ground floor, plywood shearwall new framing. revision to app#201907236621. | |
| Jul 23, 2019 | Completed final sign-off Dec 2019 | 74 Mallorca Wy | voluntary seismic upgrade of ground floor utilizing plywood shearwalls.Details
voluntary seismic upgrade of ground floor utilizing plywood shearwalls. | $40,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 236 08th St | ref pa# 2019-0117-0591l: electrical title 24.Details
ref pa# 2019-0117-0591l: electrical title 24. | $15,000 |
| May 13, 2019 | Never finaled issued May 2019, no final | 236 08th St | mechanical work. install new furnaces and relocate (e) furnace. ref arch pa 201901170591.Details
mechanical work. install new furnaces and relocate (e) furnace. ref arch pa 201901170591. | $50,000 |
| Jan 17, 2019 | Completed final sign-off Aug 2019 | 236 08th St | 1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixturesDetails
1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixtures | $90,000 |
| Nov 8, 2018 | Completed final sign-off Dec 2018 | 1374 Natoma St | rear bldg: to comply with nov# 201894471 #11. repair floor in bathroom, bath fan, replace kitchen hose.Details
rear bldg: to comply with nov# 201894471 #11. repair floor in bathroom, bath fan, replace kitchen hose. | $500 |
| Nov 2, 2018 | Completed final sign-off Nov 2018 | 313 Franconia St | repair dry rot discovered in entrance way of residence.Details
repair dry rot discovered in entrance way of residence. | $2,000 |