Block 3729, lot 004
236 08th St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 2
- Building
- 19,520 sq ft
- Lot
- 9,760 sq ft
- Zoning
- SLR
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 236 08th St | Urban West Construction Inc | 1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work.Details
1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work. | $7,630 |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 236 08th St | street space | ||
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 236 08th St | Perez & Perez General Contractor Inc | ref pa# 2019-0117-0591l: electrical title 24.Details
ref pa# 2019-0117-0591l: electrical title 24. | $15,000 |
| May 13, 2019 | Never finaled issued May 2019, no final | 236 08th St | Perez & Perez General Contractor Inc | mechanical work. install new furnaces and relocate (e) furnace. ref arch pa 201901170591.Details
mechanical work. install new furnaces and relocate (e) furnace. ref arch pa 201901170591. | $50,000 |
| Jan 17, 2019 | Completed final sign-off Aug 2019 | 236 08th St | Perez & Perez General Contractor Inc | 1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixturesDetails
1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixtures | $90,000 |
| Mar 14, 2018 | Never finaled issued Mar 2018, no final | 236 08th St | street space permit | ||
| Sep 11, 2014 | Completed final sign-off Aug 2022 | 230 08th St | Morgan Construction | change of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a **Details
change of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a ** | $20,000 |
| Jun 3, 2014 | Completed final sign-off Jul 2014 | 236 08th St | Modern Construction Inc | install new folding gate, install cabinet and sink, relocate existing light fixture and install light in closet. n/a ordinance #155-13.Details
install new folding gate, install cabinet and sink, relocate existing light fixture and install light in closet. n/a ordinance #155-13. | $20,000 |
| Mar 13, 2014 | Completed final sign-off Apr 2014 | 230 08th St | Modern Construction Inc | remove existing walls and fixture, restore original windows, construct new walls, build ada restrooms and install new finishes. na ordinance #155-13Details
remove existing walls and fixture, restore original windows, construct new walls, build ada restrooms and install new finishes. na ordinance #155-13 | $20,000 |
| Oct 22, 2013 | Completed final sign-off Mar 2014 | 236 08th St | Modern Construction Inc | construct new walls. construct new ada restroom. install furnace system. restore original storefrontDetails
construct new walls. construct new ada restroom. install furnace system. restore original storefront | $50,000 |
| Sep 3, 2013 | Never finaled issued Sep 2013, no final | 236 08th St | Modern Construction Inc | #100- remove existing partition walls, doors, lights and finishes. ab17Details
#100- remove existing partition walls, doors, lights and finishes. ab17 | $6,000 |
| Mar 29, 2012 | Completed final sign-off Jul 2012 | 236 08th St | Golden Gate Sign Company Inc. | to erect 2 non-illuminated (single faced) sign faced wall signDetails
to erect 2 non-illuminated (single faced) sign faced wall sign | $3,000 |
| Apr 9, 2008 | Never finaled issued Apr 2008, no final | 230 08th St | Gaetani Construction Inc. | repair of (e) window headers by replacing (e) steel headers with new steel headers. replace brick and stucco siding in kindDetails
repair of (e) window headers by replacing (e) steel headers with new steel headers. replace brick and stucco siding in kind | $10,000 |
| Apr 2, 2008 | Never finaled issued Apr 2008, no final | 236 08th St | Gaetani Construction Inc. | remove old signage box from front of building. repair damaged stucco and repair any remaining cornice detail if present.Details
remove old signage box from front of building. repair damaged stucco and repair any remaining cornice detail if present. | $2,300 |
| Mar 12, 2008 | Never finaled issued Mar 2008, no final | 236 08th St | street space permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Modern Construction Inc (4), Perez & Perez General Contractor Inc (3), Gaetani Construction Inc. (2), Golden Gate Sign Company Inc., Morgan Construction, Urban West Construction Inc
- Architects
- Robert Raymond Roth (2), Dennis Smith, Dennis Smith, Michael Dubitsky
- Engineers
- David G. Kallmeyer