Morgan Construction
- Based in
- San Mateo
- On San Francisco permits
- Jun 2013 to Feb 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2021 | Completed final sign-off Oct 2021 | 338 Spear St | remodel of master bath and guest bath in-kind. no change to existing flr plan. no relocation of fixtures.Details
remodel of master bath and guest bath in-kind. no change to existing flr plan. no relocation of fixtures. | $85,000 |
| Jan 26, 2021 | Never finaled issued Apr 2021, no final | 3318 California St | demo & remove of non bearing wall. install new island counter & cabinets. new electrical at island. new lighting at island.Details
demo & remove of non bearing wall. install new island counter & cabinets. new electrical at island. new lighting at island. | $15,000 |
| Oct 29, 2020 | Never finaled issued Oct 2020, no final | 3318 California St | unit 3. remodel of guest bathroom in kind. remodel of master bathroom in kind.Details
unit 3. remodel of guest bathroom in kind. remodel of master bathroom in kind. | $74,000 |
| Sep 11, 2014 | Completed final sign-off Aug 2022 | 230 08th St | change of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a **Details
change of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a ** | $20,000 |
| Mar 25, 2014 | Completed final sign-off Jul 2014 | 1211 Church St | demolition tenant space down to shell. no expansion outside of (e) envelope. no load bearing or shear walls to be removed as part of scope. consturct 5 new rooms closet & ada compliant restroom. provide all new lighting throughout, hvac to be provided under separate permit.Details
demolition tenant space down to shell. no expansion outside of (e) envelope. no load bearing or shear walls to be removed as part of scope. consturct 5 new rooms closet & ada compliant restroom. provide all new lighting throughout, hvac to be provided under separate permit. | $48,500 |
| Jun 24, 2013 | Completed final sign-off Oct 2013 | 439 Washington St | title 24 analysis-reconfiguration of heat & ventilation ducting to service new interior rooms. refer to pa# 2013-0611-9180 (architectural)Details
title 24 analysis-reconfiguration of heat & ventilation ducting to service new interior rooms. refer to pa# 2013-0611-9180 (architectural) | $16,500 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 439 Washington St | interior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom.Details
interior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom. | $48,000 |