Permit GraphSan Francisco building permits since 2000

Morgan Construction

Contractor license
961361
State license record
Based in
San Mateo
On San Francisco permits
Jun 2013 to Feb 2021
Last 24 months
0 permits filed

7 permits since 2000: 4 completed, 3 never finaled.

Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllBathroom remodel 3
FiledOutcomeAddressWork described on the permitDeclared cost
Feb 3, 2021Completed
final sign-off Oct 2021
338 Spear Stremodel of master bath and guest bath in-kind. no change to existing flr plan. no relocation of fixtures.
Details
Permit
202102033871
Status
complete
Filed
Feb 3, 2021
Permit issued
Feb 3, 2021
Final sign-off
Oct 1, 2021
Declared cost
$85,000
Address
338 Spear St

remodel of master bath and guest bath in-kind. no change to existing flr plan. no relocation of fixtures.

Open the permit page

$85,000
Jan 26, 2021Never finaled
issued Apr 2021, no final
3318 California Stdemo & remove of non bearing wall. install new island counter & cabinets. new electrical at island. new lighting at island.
Details
Permit
202101263358
Status
issued
Filed
Jan 26, 2021
Permit issued
Apr 9, 2021
Declared cost
$15,000
Address
3318 California St

demo & remove of non bearing wall. install new island counter & cabinets. new electrical at island. new lighting at island.

Open the permit page

$15,000
Oct 29, 2020Never finaled
issued Oct 2020, no final
3318 California Stunit 3. remodel of guest bathroom in kind. remodel of master bathroom in kind.
Details
Permit
202010297725
Status
issued
Filed
Oct 29, 2020
Permit issued
Oct 29, 2020
Declared cost
$74,000
Address
3318 California St

unit 3. remodel of guest bathroom in kind. remodel of master bathroom in kind.

Open the permit page

$74,000
Sep 11, 2014Completed
final sign-off Aug 2022
230 08th Stchange of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a **
Details
Permit
201409116046
Status
complete
Filed
Sep 11, 2014
Permit issued
Dec 5, 2014
Final sign-off
Aug 10, 2022
Declared cost
$20,000
Address
230 08th St

change of use from office to hair salon. t.i. remodel of (e) space. new interior non-load bearing wall. new plumbing & electrical work. (e) bath to remain. (e) mech to remain. new dedicated circuit @ laundry & counter top area(s). new sink location. ** maher: n/a **

Open the permit page

$20,000
Mar 25, 2014Completed
final sign-off Jul 2014
1211 Church Stdemolition tenant space down to shell. no expansion outside of (e) envelope. no load bearing or shear walls to be removed as part of scope. consturct 5 new rooms closet & ada compliant restroom. provide all new lighting throughout, hvac to be provided under separate permit.
Details
Permit
201403251601
Status
complete
Filed
Mar 25, 2014
Permit issued
Apr 11, 2014
Final sign-off
Jul 1, 2014
Declared cost
$48,500
Address
1211 Church St

demolition tenant space down to shell. no expansion outside of (e) envelope. no load bearing or shear walls to be removed as part of scope. consturct 5 new rooms closet & ada compliant restroom. provide all new lighting throughout, hvac to be provided under separate permit.

Open the permit page

$48,500
Jun 24, 2013Completed
final sign-off Oct 2013
439 Washington Sttitle 24 analysis-reconfiguration of heat & ventilation ducting to service new interior rooms. refer to pa# 2013-0611-9180 (architectural)
Details
Permit
201306240319
Status
complete
Filed
Jun 24, 2013
Permit issued
Jun 24, 2013
Final sign-off
Oct 23, 2013
Declared cost
$16,500
Address
439 Washington St

title 24 analysis-reconfiguration of heat & ventilation ducting to service new interior rooms. refer to pa# 2013-0611-9180 (architectural)

Open the permit page

$16,500
Jun 11, 2013Never finaled
issued Jun 2013, no final
439 Washington Stinterior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom.
Details
Permit
201306119180
Status
issued
Filed
Jun 11, 2013
Permit issued
Jun 11, 2013
Declared cost
$48,000
Address
439 Washington St

interior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom.

Open the permit page

$48,000