Block 3708, lot 023
40 Jessie St
- City’s use
- Commercial Office
- Built
- 2008
- Stories
- 5
- Building
- 50,790 sq ft
- Lot
- 7,130 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Sep 2026 | 40 Jessie St | O C Mc Donald Co Inc | install new work station sink at bls lab 5b4Details
install new work station sink at bls lab 5b4 | $22,174 |
| Jul 29, 2025 | Completed final sign-off Dec 2025 | 40 Jessie St | Sc Builders, Inc | renovation of core restrooms on floors 1 through 6. inlcudes new flor finisehs lighting & fixtures. no structural work. electrical included. (mech & plumbing, f/s & f/a system under sep permit).Details
renovation of core restrooms on floors 1 through 6. inlcudes new flor finisehs lighting & fixtures. no structural work. electrical included. (mech & plumbing, f/s & f/a system under sep permit). | $550,000 |
| Aug 19, 2024 | Completed final sign-off Jan 2025 | 40 Jessie St | Rise Rigging Llc | comply with facade ordinance inspection report dated 12/14/23. repairs include: painting of al exterior surfaces, matching all extg colors and style. re-painting of e sign seal cement plaster cracking and mechanical pinning the cracked concrete elements and sealing the cracks at s, n, e & penthouseDetails
comply with facade ordinance inspection report dated 12/14/23. repairs include: painting of al exterior surfaces, matching all extg colors and style. re-painting of e sign seal cement plaster cracking and mechanical pinning the cracked concrete elements and sealing the cracks at s, n, e & penthouse | $9,000 |
| Aug 8, 2022 | Completed final sign-off Sep 2022 | 40 Jessie St | Pyro-Comm Systems, Inc. | 5/f: voluntary addition to (e) f/a system, (1) new horn strobe will be added to x-ray room. ref electrical permit #ew202208015042Details
5/f: voluntary addition to (e) f/a system, (1) new horn strobe will be added to x-ray room. ref electrical permit #ew202208015042 | $500 |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 40 Jessie St | Sun Graphics | fabricate and install 21 emergency evacuation maps @ 40 jessie on all floors (1-6). sub surface digital print on 15x17 x 1/8 thick non-glare acrylic. mounted to wall with vhb foam tape and silicone as neededDetails
fabricate and install 21 emergency evacuation maps @ 40 jessie on all floors (1-6). sub surface digital print on 15x17 x 1/8 thick non-glare acrylic. mounted to wall with vhb foam tape and silicone as needed | $3,800 |
| Nov 10, 2021 | Never finaled issued Nov 2021, no final | 40 Jessie St | Pyro-Comm Systems, Inc. | 2nd floor:as built based on field make up: add 1 strobe for security rm, 1 strobe for mothers rm, 2 strobes for new area and 1 relay for card access. ref 2021 0513 0365Details
2nd floor:as built based on field make up: add 1 strobe for security rm, 1 strobe for mothers rm, 2 strobes for new area and 1 relay for card access. ref 2021 0513 0365 | $4,400 |
| Oct 5, 2021 | Completed final sign-off Oct 2021 | 40 Jessie St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 2 pendant sprinklers & relocate 2 upright on the 2nd floor. add 1 upright. t.i. ref#202108236933Details
fire sprinklers. relocate 2 pendant sprinklers & relocate 2 upright on the 2nd floor. add 1 upright. t.i. ref#202108236933 | $1,500 |
| Aug 23, 2021 | Never finaled issued Sep 2021, no final | 40 Jessie St | Skyline Construction | 2nd, 3rd, 5th,6th,7th, & roof floors: revision to app#202110203915 to add work at basement, 3rd,6th, 7th and roof to add evacuation chair at #1 & 2, rlocate extg fire ext. cabinets add window film and misc. ceiling work. electrical and mech revisions.Details
2nd, 3rd, 5th,6th,7th, & roof floors: revision to app#202110203915 to add work at basement, 3rd,6th, 7th and roof to add evacuation chair at #1 & 2, rlocate extg fire ext. cabinets add window film and misc. ceiling work. electrical and mech revisions. | $50,000 |
| May 13, 2021 | Completed final sign-off Nov 2021 | 40 Jessie St | Pyro-Comm Systems, Inc. | t.i.: adding 1 horn/strobeDetails
t.i.: adding 1 horn/strobe | $3,500 |
| May 13, 2021 | Never finaled issued Jun 2021, no final | 40 Jessie St | Pyro-Comm Systems, Inc. | t.i.: adding 1 horn/strobe, 2 duct detectors, 2 relay modulesDetails
t.i.: adding 1 horn/strobe, 2 duct detectors, 2 relay modules | $4,400 |
| May 13, 2021 | Completed final sign-off Nov 2021 | 40 Jessie St | Pyro-Comm Systems, Inc. | t.i.: adding 2 duct detectors, 2 relay modulesDetails
t.i.: adding 2 duct detectors, 2 relay modules | $4,500 |
| Apr 27, 2021 | Completed final sign-off Jun 2021 | 40 Jessie St | Golden Gate Fire Protection Inc | fire sprinklers; add 1 pendent sprinkler on the 1st floor. t.i. ref # 2021-0203-3915Details
fire sprinklers; add 1 pendent sprinkler on the 1st floor. t.i. ref # 2021-0203-3915 | $1,000 |
| Feb 3, 2021 | Never finaled issued Apr 2021, no final | 40 Jessie St | Skyline Construction | level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included.Details
level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included. | $800,000 |
| Sep 6, 2019 | Completed final sign-off Sep 2019 | 40 Jessie St | Pyro-Comm Systems, Inc. | as built drawings for added speaker strobe.Details
as built drawings for added speaker strobe. | |
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 40 Jessie St | Pyro-Comm Systems, Inc. | fire alarm t.i. (1) ceiling mount strobe to be added to (e) facu n/a maherDetails
fire alarm t.i. (1) ceiling mount strobe to be added to (e) facu n/a maher | $500 |
| May 22, 2019 | Completed final sign-off Sep 2019 | 40 Jessie St | Novo Construction Inc | interior improvement on the 5th fl mep and fire life safety sep permit maher not reqDetails
interior improvement on the 5th fl mep and fire life safety sep permit maher not req | $100,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 40 Jessie St | Terra Visual Inc | install 28 new evacuation maps to comply with current sffd evacuation map guidelines. n/a for maherDetails
install 28 new evacuation maps to comply with current sffd evacuation map guidelines. n/a for maher | $8,400 |
| Oct 18, 2018 | Completed final sign-off Dec 2018 | 40 Jessie St | Pyro-Comm Systems, Inc. | fire alarm ti add 6 smokoe detectors, 14 duct detectors, 4 return air smokes and 33 audio visual devices to be hooked up go existing facu ref 201807114244Details
fire alarm ti add 6 smokoe detectors, 14 duct detectors, 4 return air smokes and 33 audio visual devices to be hooked up go existing facu ref 201807114244 | $26,000 |
| Aug 21, 2018 | Completed final sign-off Dec 2018 | 40 Jessie St | Ayoob & Peery Plumbing Co Inc | sprinklers ti- ref pa# 201807114244; add (19) and relocate (124) sprinklers to conform with the wall/ceiling layout of the tenant improvement (1,2,3,4,& 6 floors)Details
sprinklers ti- ref pa# 201807114244; add (19) and relocate (124) sprinklers to conform with the wall/ceiling layout of the tenant improvement (1,2,3,4,& 6 floors) | $37,875 |
| Aug 15, 2018 | Completed final sign-off Feb 2019 | 40 Jessie St | Novo Construction Inc | mechanical and plumbing for tenant improvement on the 1st-6th floors. ref arch #201807114244.Details
mechanical and plumbing for tenant improvement on the 1st-6th floors. ref arch #201807114244. | $150,000 |
| Aug 15, 2018 | Completed final sign-off Feb 2019 | 40 Jessie St | Novo Construction Inc | electrical work for tenant improvement on the 1st-6th floors. ref arch #201807114244.Details
electrical work for tenant improvement on the 1st-6th floors. ref arch #201807114244. | $120,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 40 Jessie St | Novo Construction Inc | ti on 1, 2, 3, 4, 6 and penthouse to include new partitions, millwork, ceiling and finishes. mep & fire life safety under separate permitDetails
ti on 1, 2, 3, 4, 6 and penthouse to include new partitions, millwork, ceiling and finishes. mep & fire life safety under separate permit | $800,000 |
| Nov 3, 2017 | Completed final sign-off Nov 2017 | 40 Jessie St | Pyro-Comm Systems, Inc. | all new addressable devices will be connected to the existing fire alarm control unit intelligent loop for all 6th floors. install 23 relay, 6 manual pulls, 5 area smoke detectors, 18 duct smoke detectors, 46 horn/strobes and 1 strobe. ref 2017/07/07/1243 ** maher: n/a **Details
all new addressable devices will be connected to the existing fire alarm control unit intelligent loop for all 6th floors. install 23 relay, 6 manual pulls, 5 area smoke detectors, 18 duct smoke detectors, 46 horn/strobes and 1 strobe. ref 2017/07/07/1243 ** maher: n/a ** | $50,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 40 Jessie St | Novo Construction Inc | revision to pa #201705025375 to add structural work for mechanical units.Details
revision to pa #201705025375 to add structural work for mechanical units. | $50,000 |
| Jul 7, 2017 | Never finaled issued Oct 2017, no final | 40 Jessie St | Novo Construction Inc | mechanical upgrade for basement, 1st, 2nd, 3rd, 4th, 5th & 6th floors. ref arch pa# 2017/05/02/5375.Details
mechanical upgrade for basement, 1st, 2nd, 3rd, 4th, 5th & 6th floors. ref arch pa# 2017/05/02/5375. | $250,000 |
| Jul 7, 2017 | Completed final sign-off Feb 2019 | 40 Jessie St | Novo Construction Inc | electrial / lighting upgrade for basement, 1st, 2nd, 3rd, 4th, 5th, 6th foors & roof. ref arch pa# 2017/05/02/5375.Details
electrial / lighting upgrade for basement, 1st, 2nd, 3rd, 4th, 5th, 6th foors & roof. ref arch pa# 2017/05/02/5375. | $250,000 |
| Jun 22, 2017 | Completed final sign-off Nov 2017 | 40 Jessie St | Ayoob & Peery Plumbing Co Inc | add relocate change out & remove fire sprinklers per ti level 0 (3 add) level 1 (6 relo) & (1 removed) (8 changeout) level 2 (4add,3 relo,14 removed,8 change out), level 3 (3add, 1 relo,14 removed ) level 4 (2 add, 1 relo, 1 removed,24 changeout) level 5 (3 add,40 relo,10 removed) level 6 (12add,Details
add relocate change out & remove fire sprinklers per ti level 0 (3 add) level 1 (6 relo) & (1 removed) (8 changeout) level 2 (4add,3 relo,14 removed,8 change out), level 3 (3add, 1 relo,14 removed ) level 4 (2 add, 1 relo, 1 removed,24 changeout) level 5 (3 add,40 relo,10 removed) level 6 (12add, | $29,540 |
| May 2, 2017 | Never finaled issued Jun 2017, no final | 40 Jessie St | Novo Construction Inc | interior tenant improvement on level on level 0-6 to include partitions, ceiling and finishes. penhouse work to include conrete pads and steel fram. mep and structural workDetails
interior tenant improvement on level on level 0-6 to include partitions, ceiling and finishes. penhouse work to include conrete pads and steel fram. mep and structural work | $6,000,000 |
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 40 Jessie St | Novo Construction Inc | architectural demo to include demo of non-structural partitions, doors, frames, finishes. demo of mep, removal of rooftop mechanical systems. fire sprinklers to remain in place. ab-017.Details
architectural demo to include demo of non-structural partitions, doors, frames, finishes. demo of mep, removal of rooftop mechanical systems. fire sprinklers to remain in place. ab-017. | $150,000 |
| May 7, 2009 | Never finaled issued May 2009, no final | 40 Jessie St | Pacific Auxiliary Fire Alarm | add 15 horn strobes, 11 strobes due to tenant improvements on floors 4,5,6Details
add 15 horn strobes, 11 strobes due to tenant improvements on floors 4,5,6 | $17,000 |
| Feb 3, 2009 | Completed final sign-off Dec 2009 | 40 Jessie St | Cahill Const Service Inc | build out unoccupied spaces (shelled) on 4/f-6/f. t.i. will provide office space for admin services, law student services, law clinics with accompanying conference, storage and service requirements including staff lounges. (e) systems designed to handle new capacity. ref.appl#200604078528.Details
build out unoccupied spaces (shelled) on 4/f-6/f. t.i. will provide office space for admin services, law student services, law clinics with accompanying conference, storage and service requirements including staff lounges. (e) systems designed to handle new capacity. ref.appl#200604078528. | $1,250,000 |
| Jan 30, 2009 | Completed final sign-off Dec 2009 | 40 Jessie St | Rcm Fire Protection Inc. | 4th, 5th & 6th floors, relocate total of 112 uprights to new ceiling & change to pendentsDetails
4th, 5th & 6th floors, relocate total of 112 uprights to new ceiling & change to pendents | $22,000 |
| May 30, 2008 | Completed final sign-off Jun 2008 | 40 Jessie St | Allied Fire Protection | as built fire sprinkler plans ref. to pa# 2006-0407-8528/s3/r3-added 3 w.s. heads in stairwellDetails
as built fire sprinkler plans ref. to pa# 2006-0407-8528/s3/r3-added 3 w.s. heads in stairwell | |
| Oct 19, 2007 | Completed final sign-off Jun 2008 | 40 Jessie St | Cahill Const Service Inc | revision to approved permit #200604078528 s, revise the coffee serve station and to provide locker room in the basement level for the employee. include equipment for coffee serving station and related electrical and plumbing work.Details
revision to approved permit #200604078528 s, revise the coffee serve station and to provide locker room in the basement level for the employee. include equipment for coffee serving station and related electrical and plumbing work. | $38,000 |
| May 9, 2006 | Completed final sign-off Mar 2007 | 40 Jessie St | interior non-structural demo on all floors. compaction grouting in basement level. soft demo, no structural workDetails
interior non-structural demo on all floors. compaction grouting in basement level. soft demo, no structural work | $25,000 | |
| Apr 7, 2006 | Completed final sign-off Jun 2008 | 40 Jessie St | Silverado Contractors Inc | 3 story vertical addition to (e) office building.Details
3 story vertical addition to (e) office building. | $10,800,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (9), Pyro-Comm Systems, Inc. (9), Ayoob & Peery Plumbing Co Inc (2), Cahill Const Service Inc (2), Golden Gate Fire Protection Inc (2), Skyline Construction (2), Allied Fire Protection, O C Mc Donald Co Inc, Pacific Auxiliary Fire Alarm, Rcm Fire Protection Inc., Rise Rigging Llc, Sc Builders, Inc, Silverado Contractors Inc, Sun Graphics, Terra Visual Inc
- Architects
- Christopher Ratcliff (2), James Matthew Cottaill (2), Scott E Clement (2), Kimberly O'dowd
- Engineers
- John Pappas (2), Jevin Almazan, Joshua Mcmmahan, Sargon Yshaya, Stephen Shaffer, Tammy Siliznoff
- Designers
- James Matthew Cottaill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.