Robert Stuart Donaldson
- Listed as
- architect
- Firm
- Shubin Donaldson
- Based in
- Culver City
- On San Francisco permits
- Apr 2019 to Nov 2021
14 permits since 2000 (architect on 14 permits): 12 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Mar 2022 | 1 Market St | Gci, Inc | 3rd and 6th floor: replacement of extg restroom partitions in multi stall restroom on l3 and 6 with full height partitions.Details
3rd and 6th floor: replacement of extg restroom partitions in multi stall restroom on l3 and 6 with full height partitions. | $150,000 |
| Sep 8, 2021 | Never finaled issued Sep 2021, no final | 1 Market St | Gci, Inc | as builts- reception area & removal of 3 doors in response to fire use permit (100832) inspection for mkDetails
as builts- reception area & removal of 3 doors in response to fire use permit (100832) inspection for mk | |
| Aug 16, 2021 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 11/f: revision to pa 201909262834. amendment to occupancy load of exterior roof decks to 49 occupancy each. clarifying hardware on doors es101 and es1103 as existing. identifying an existing curb in path of egress as "existing/non-compliant" field condition.Details
11/f: revision to pa 201909262834. amendment to occupancy load of exterior roof decks to 49 occupancy each. clarifying hardware on doors es101 and es1103 as existing. identifying an existing curb in path of egress as "existing/non-compliant" field condition. | |
| Mar 23, 2021 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling addition of power for misc av equipment in and above ceilingDetails
11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling addition of power for misc av equipment in and above ceiling | |
| Mar 19, 2021 | Never finaled issued Apr 2021, no final | 1 Market St | Level 10 Construction Lp | for dph review only. ref pa# 201909040607. smooth ceiling soffits over micro kitchen in response to dph comments.Details
for dph review only. ref pa# 201909040607. smooth ceiling soffits over micro kitchen in response to dph comments. | $45,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 1 Market St | Level 10 Construction Lp | level 7 & level 10: revision to 201906113076 for as built scope to replace cafe banquet seating to alcove to accommodate 2 new handwash sinks given covid 19. level 10: revision to pa 201906113065 for as built scope to replace banquet seating to accommodate 4 new handwash sinks for additional hygieneDetails
level 7 & level 10: revision to 201906113076 for as built scope to replace cafe banquet seating to alcove to accommodate 2 new handwash sinks given covid 19. level 10: revision to pa 201906113065 for as built scope to replace banquet seating to accommodate 4 new handwash sinks for additional hygiene | $20,000 |
| Dec 1, 2020 | Completed final sign-off Apr 2022 | 1 Market St | Gci, Inc, Level 10 Construction Lp | level 6: rev to pa201910033474: change relate to restroom revisions. a single gender neutral restroom has been added; a raised floor is added to manage restroom plumbing connections; misc plumbing rev due to infield routing contraints. included are arch/struct/mech/elec/plumbing. maher n/a.Details
level 6: rev to pa201910033474: change relate to restroom revisions. a single gender neutral restroom has been added; a raised floor is added to manage restroom plumbing connections; misc plumbing rev due to infield routing contraints. included are arch/struct/mech/elec/plumbing. maher n/a. | $100,000 |
| Sep 5, 2019 | Completed final sign-off Jan 2020 | 1 Market St | Level 10 Construction Lp | 7, 8 and 9th floors - ti spaces of commercial office vacant space in existing building per ab-017 no cieling demo approved on this permit.Details
7, 8 and 9th floors - ti spaces of commercial office vacant space in existing building per ab-017 no cieling demo approved on this permit. | $500,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sfDetails
8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sf | $4,200,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada liftDetails
7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada lift | $3,250,000 |
| Jun 27, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | demo of existing ti spaces of commercial office over 2 floors (level 3 & 6) in an existing building. per ab-017. maher naDetails
demo of existing ti spaces of commercial office over 2 floors (level 3 & 6) in an existing building. per ab-017. maher na | $200,000 |
| Jun 11, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | level 10:ref ti demo pa# 201904248769: limited to build out of new cafe space(a2 occupancy)on 10/fl of approximately 12,300 sf.space includes misc food stations with seating arrangements and supporting back of house kitchen space.(horizontial exit& mechanical shaft under separate permit).maher n/a.Details
level 10:ref ti demo pa# 201904248769: limited to build out of new cafe space(a2 occupancy)on 10/fl of approximately 12,300 sf.space includes misc food stations with seating arrangements and supporting back of house kitchen space.(horizontial exit& mechanical shaft under separate permit).maher n/a. | $3,500,000 |
| Jun 11, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | level 7: limited to build out of new cafe space(a2 occupancy)on 7/fl approximately 5,200 sf.space incl 1 food station w/seating arrangements & supporting back of house kitchen space.(horizontial exit & shaft under separate permit). no exterior work. maher n/a.Details
level 7: limited to build out of new cafe space(a2 occupancy)on 7/fl approximately 5,200 sf.space incl 1 food station w/seating arrangements & supporting back of house kitchen space.(horizontial exit & shaft under separate permit). no exterior work. maher n/a. | $1,500,000 |
| Apr 24, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | demolition of existing tenant improvement/commercial office space on levels 10th and 11th floor in an existing building. ceiling demo will be deferred. maher n/a.Details
demolition of existing tenant improvement/commercial office space on levels 10th and 11th floor in an existing building. ceiling demo will be deferred. maher n/a. | $275,000 |