Precision Air Systems Inc
- Based in
- San Leandro
- On San Francisco permits
- May 2014 to Aug 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 5 completed, 4 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 3193 Pacific Av | in kind bath remodel, new cabinet, new tile, new shower glass. no coversions. remodel like for like.Details
in kind bath remodel, new cabinet, new tile, new shower glass. no coversions. remodel like for like. | $15,000 |
| Jul 2, 2026 | In progress issued Sep 2026 | 880 Clipper Tr | solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will be closer than 3 feet | installation of solar panels with battDetails
solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will be closer than 3 feet | installation of solar panels with batt | |
| Jul 2, 2026 | In progress issued Sep 2026 | 882 Clipper Tr | solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will be closer than 3 feet | installtion of pv panels and batteryDetails
solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will be closer than 3 feet | installtion of pv panels and battery | $24,500 |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 880 Clipper Tr | solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of 4.84 kw solDetails
solar permit: installing 11 solar pv modules, 440 watts per module, total no. of rating 4.84 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of 4.84 kw sol | |
| Jul 18, 2022 | Expired or cancelled withdrawn Oct 2022 | 730 10th Av | reroofingDetails
reroofing | $35,000 |
| Jun 9, 2022 | Never finaled issued Aug 2022, no final | 900 Kearny St | 5th floor: demo and construction of non load bearing partitions for a new break area and server room; installation of new lighting fixtures and switching and new storage door rooms; door and frames salvage and reuse.Details
5th floor: demo and construction of non load bearing partitions for a new break area and server room; installation of new lighting fixtures and switching and new storage door rooms; door and frames salvage and reuse. | $400,000 |
| May 17, 2022 | Never finaled issued Jun 2022, no final | 900 Kearny St | 2nd fl ste 200: tenant improvement including new partitions, ceiling, lighting break room + mech, elec, plumbing.Details
2nd fl ste 200: tenant improvement including new partitions, ceiling, lighting break room + mech, elec, plumbing. | $550,000 |
| May 17, 2022 | Never finaled issued May 2022, no final | 900 Kearny St | suite 610 & 625: installation fo new electrical fixtures, plumbing fixtures and mechanical ducting. new receptacles and lighting controllers. new breakroom plumbing. ref ti permit 202204212713.Details
suite 610 & 625: installation fo new electrical fixtures, plumbing fixtures and mechanical ducting. new receptacles and lighting controllers. new breakroom plumbing. ref ti permit 202204212713. | $200,000 |
| Apr 21, 2022 | Never finaled issued May 2022, no final | 900 Kearny St | ste 610 & 625: tenant improcement. includes construction of non-load bearing partitions. modification to (e) ceiling grid, & tile. light fixture relocation. new switching, new office door & finishes, millwork, sinks & finishes.Details
ste 610 & 625: tenant improcement. includes construction of non-load bearing partitions. modification to (e) ceiling grid, & tile. light fixture relocation. new switching, new office door & finishes, millwork, sinks & finishes. | $200,000 |
| Feb 28, 2022 | Never finaled issued Feb 2022, no final | 900 Kearny St | 6th fl - demolition. soft wall demo. space vacant.Details
6th fl - demolition. soft wall demo. space vacant. | $20,000 |
| Feb 18, 2022 | Never finaled issued Apr 2022, no final | 900 Kearny St | ab17 demo e gr level tenant suite, community stairs to the basement level, partial basement leel partitions, millwork, finishesDetails
ab17 demo e gr level tenant suite, community stairs to the basement level, partial basement leel partitions, millwork, finishes | $80,000 |
| Jan 21, 2022 | Never finaled issued Jan 2022, no final | 900 Kearny St | additional mep plans for permit in ref to issued pa# 202106283332. ste 388Details
additional mep plans for permit in ref to issued pa# 202106283332. ste 388 | $29,000 |
| Jun 28, 2021 | Never finaled issued Nov 2021, no final | 900 Kearny St | suite 388: modification of (e) t.i., construction of non-load bearing partitions, (e) ceiling, grid & tile, light fixture relocation & new including reswitching, new doors/frames, salvage/reuse of (e) selected materals, new millwork, sink, new finishesDetails
suite 388: modification of (e) t.i., construction of non-load bearing partitions, (e) ceiling, grid & tile, light fixture relocation & new including reswitching, new doors/frames, salvage/reuse of (e) selected materals, new millwork, sink, new finishes | $267,410 |
| Jun 25, 2015 | Completed final sign-off Feb 2016 | 1310 45th Av | g/f only-comply w/complaint #201545441: remove existing downstairs kitchen - remove cabinets, electrical & cap plumbing & gas inside wall.; legalize bathroom. non-habitable unconditioned storage rooms to remain at ground floor.Details
g/f only-comply w/complaint #201545441: remove existing downstairs kitchen - remove cabinets, electrical & cap plumbing & gas inside wall.; legalize bathroom. non-habitable unconditioned storage rooms to remain at ground floor. | $2,000 |
| May 6, 2015 | Completed final sign-off Feb 2016 | 1310 45th Av | kitchen remodel in-kind. cabinets were existing before home purchased & new counterrops. electrical outlets in kitchen had blank coverplates.Details
kitchen remodel in-kind. cabinets were existing before home purchased & new counterrops. electrical outlets in kitchen had blank coverplates. | $1,000 |
| Oct 6, 2014 | Completed final sign-off Dec 2014 | 444 Jackson St | barrier removal. renovate existing bathroom to be ada compliant. move wall and replace fixtures. move existing interior wall 1'-6" to have 5'-0" wheel chair access. install hand towel dispenser, mirror to be angled. thermal wrap at drain; maher n/aDetails
barrier removal. renovate existing bathroom to be ada compliant. move wall and replace fixtures. move existing interior wall 1'-6" to have 5'-0" wheel chair access. install hand towel dispenser, mirror to be angled. thermal wrap at drain; maher n/a | $50,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 2401 Jackson St | unit 1: convert closet to bathroom with sink, shower & toilet, add (2) cabinets @ kitchen & remove (1) cabinet, paint & drywall, move (1) wallDetails
unit 1: convert closet to bathroom with sink, shower & toilet, add (2) cabinets @ kitchen & remove (1) cabinet, paint & drywall, move (1) wall | $25,000 |
| May 12, 2014 | Completed final sign-off Oct 2014 | 1175 Bay St | unit #1 - demo & new tile in kitchen, laundry & 2 bathrooms, new cabinets in kitchen, relocate stove & sink in kitchen. remodel 1/2 bath & master bath in kind.Details
unit #1 - demo & new tile in kitchen, laundry & 2 bathrooms, new cabinets in kitchen, relocate stove & sink in kitchen. remodel 1/2 bath & master bath in kind. | $100,000 |