Back to kitchen remodel contractors
Precision Air Systems Inc
- Based in
- San Leandro
- On San Francisco permits
- May 2014 to Aug 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 5 completed, 4 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2015 | Completed final sign-off Feb 2016 | 1310 45th Av | g/f only-comply w/complaint #201545441: remove existing downstairs kitchen - remove cabinets, electrical & cap plumbing & gas inside wall.; legalize bathroom. non-habitable unconditioned storage rooms to remain at ground floor.Details
g/f only-comply w/complaint #201545441: remove existing downstairs kitchen - remove cabinets, electrical & cap plumbing & gas inside wall.; legalize bathroom. non-habitable unconditioned storage rooms to remain at ground floor. | $2,000 |
| May 6, 2015 | Completed final sign-off Feb 2016 | 1310 45th Av | kitchen remodel in-kind. cabinets were existing before home purchased & new counterrops. electrical outlets in kitchen had blank coverplates.Details
kitchen remodel in-kind. cabinets were existing before home purchased & new counterrops. electrical outlets in kitchen had blank coverplates. | $1,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 2401 Jackson St | unit 1: convert closet to bathroom with sink, shower & toilet, add (2) cabinets @ kitchen & remove (1) cabinet, paint & drywall, move (1) wallDetails
unit 1: convert closet to bathroom with sink, shower & toilet, add (2) cabinets @ kitchen & remove (1) cabinet, paint & drywall, move (1) wall | $25,000 |
| May 12, 2014 | Completed final sign-off Oct 2014 | 1175 Bay St | unit #1 - demo & new tile in kitchen, laundry & 2 bathrooms, new cabinets in kitchen, relocate stove & sink in kitchen. remodel 1/2 bath & master bath in kind.Details
unit #1 - demo & new tile in kitchen, laundry & 2 bathrooms, new cabinets in kitchen, relocate stove & sink in kitchen. remodel 1/2 bath & master bath in kind. | $100,000 |