Block 3706, lot 048
785 Market St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 18
- Units
- 2
- Rooms
- 22 bathrooms
- Building
- 93,455 sq ft
- Lot
- 8,500 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
68 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2021 | Completed final sign-off Oct 2023 | 785 Market St | Pyro-Comm Systems, Inc. | fire alarm elevator mod. 2 new relays will be added for new fsd shutdown, 2 relays will be added for elevator recall, 1 monmitor module to be added for short trip supervision and for 120 vac short trip circuit failure. linear heat cable will be added within 24 in of sprinkler head with remote tests.Details
fire alarm elevator mod. 2 new relays will be added for new fsd shutdown, 2 relays will be added for elevator recall, 1 monmitor module to be added for short trip supervision and for 120 vac short trip circuit failure. linear heat cable will be added within 24 in of sprinkler head with remote tests. | $7,000 |
| Feb 10, 2021 | Completed final sign-off Nov 2023 | 785 Market St | D W Nicholson Corporation | revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level.Details
revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level. | |
| Dec 21, 2020 | Completed final sign-off Nov 2021 | 785 Market St | Pribuss Engineering Inc | add 1 sprinkler for fire sprinkler t.i. g.c. p.a. #Details
add 1 sprinkler for fire sprinkler t.i. g.c. p.a. # | $514 |
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 4th fl: deferred electrical for pa# 202001222478. title 24 electrical.Details
4th fl: deferred electrical for pa# 202001222478. title 24 electrical. | |
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 5th fl: deferred electrical for pa# 202001222479. title 24.Details
5th fl: deferred electrical for pa# 202001222479. title 24. | |
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 3rd fl: deferred electrical for pa# 202001222474. title 24 electrical.Details
3rd fl: deferred electrical for pa# 202001222474. title 24 electrical. | |
| Sep 9, 2020 | Completed final sign-off Nov 2023 | 785 Market St | barrier removal: to include modification to (e) bldg. elevator machine rooms + supoport spaces. elevator project permitted seperately. construction of non-load bearing partitions. new doors, frames & finishes. accessibility upgrade to basement.Details
barrier removal: to include modification to (e) bldg. elevator machine rooms + supoport spaces. elevator project permitted seperately. construction of non-load bearing partitions. new doors, frames & finishes. accessibility upgrade to basement. | $25,000 | |
| Jun 17, 2020 | Never finaled issued Aug 2020, no final | 785 Market St | Pyro-Comm Systems, Inc. | 11 ceiling speaker strobes,2 ceiling strobes,1 smoke detector to be added to existing facu.Details
11 ceiling speaker strobes,2 ceiling strobes,1 smoke detector to be added to existing facu. | $8,000 |
| Mar 13, 2020 | Completed final sign-off Mar 2021 | 785 Market St | Pyro-Comm Systems, Inc. | fire alarm 24 ceiling speaker strobes, 4 ceiling strobes, 1 smoke detector to be added to (e) facuDetails
fire alarm 24 ceiling speaker strobes, 4 ceiling strobes, 1 smoke detector to be added to (e) facu | $15,000 |
| Mar 9, 2020 | Expired or cancelled cancelled Jan 2026 | 785 Market St | C & N Construction | 10th fl - deferred mechanical permit 2019-0405-7205 for title 24 mechanicalDetails
10th fl - deferred mechanical permit 2019-0405-7205 for title 24 mechanical | |
| Mar 9, 2020 | Expired or cancelled cancelled Jan 2026 | 785 Market St | C & N Construction | 8th fl - deferred mechnical for pa 2019-0410-7599 for title 24 of mechanicalDetails
8th fl - deferred mechnical for pa 2019-0410-7599 for title 24 of mechanical | |
| Feb 28, 2020 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 8th fl/ste # 800 - revision to app#201904107599. demolition of non load bearing partitions, construction of new interior partitions, new millwork, reuse of doors and new finishes.Details
8th fl/ste # 800 - revision to app#201904107599. demolition of non load bearing partitions, construction of new interior partitions, new millwork, reuse of doors and new finishes. | |
| Feb 28, 2020 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 9th floor/ ste #950 - revision to app#201904057201. demolition of non load bearing partitions, construction of new interior partitions, new millwork, reuse of doors and new finishes.Details
9th floor/ ste #950 - revision to app#201904057201. demolition of non load bearing partitions, construction of new interior partitions, new millwork, reuse of doors and new finishes. | |
| Jan 22, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 4th fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, saluage and refuse of selective materials if practicable, new millworkDetails
4th fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, saluage and refuse of selective materials if practicable, new millwork | $362,866 |
| Jan 22, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 5th fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, and reuse of (e) selected materials if practicable, millwork, new sink andDetails
5th fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, and reuse of (e) selected materials if practicable, millwork, new sink and | $424,519 |
| Jan 22, 2020 | Completed final sign-off Mar 2021 | 785 Market St | C & N Construction | 3rd fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, new millwork, new sink and new finishesDetails
3rd fl; this project involves modification of (e) t.i. to include selective demo and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, new millwork, new sink and new finishes | $417,490 |
| Jan 2, 2020 | Completed final sign-off Jul 2020 | 785 Market St | C & N Construction | 10th fl: deferred submittal for pa #201904057205, for title 24/electrical.Details
10th fl: deferred submittal for pa #201904057205, for title 24/electrical. | |
| Jan 2, 2020 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 9th fl, suite 950: deferred submittal for pa #201904057201, for title 24/electrical.Details
9th fl, suite 950: deferred submittal for pa #201904057201, for title 24/electrical. | |
| Jan 2, 2020 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 8th fl, suite 800: deferred submittal for pa #201904107599 , for title 24/electrical.Details
8th fl, suite 800: deferred submittal for pa #201904107599 , for title 24/electrical. | |
| Nov 20, 2019 | Completed final sign-off Feb 2020 | 785 Market St | Pyro-Comm Systems, Inc. | ref pa# 201807184802; fire alarm as-built 2 strobes and 4 speaker/strobes have been added to (e) facu per inspector commentsDetails
ref pa# 201807184802; fire alarm as-built 2 strobes and 4 speaker/strobes have been added to (e) facu per inspector comments | |
| Jun 5, 2019 | Completed final sign-off Mar 2020 | 785 Market St | Pyro-Comm Systems, Inc. | ref pa# 201904057205; fire alarm ti 1 remote power supply, 1 smoke detector 7 speakers strobes (ceiling) to be added to (e) facu relocate 1/2 smoke detectorDetails
ref pa# 201904057205; fire alarm ti 1 remote power supply, 1 smoke detector 7 speakers strobes (ceiling) to be added to (e) facu relocate 1/2 smoke detector | $4,500 |
| Jun 5, 2019 | Completed final sign-off Mar 2020 | 785 Market St | Pyro-Comm Systems, Inc. | ref pa# 201904107599; fire alarm t.remote power supply (1) detector (9) ceiling strobes, 9 ceiling speaker strobes to be added to (e) facu relocate 2 smoke detectoresDetails
ref pa# 201904107599; fire alarm t.remote power supply (1) detector (9) ceiling strobes, 9 ceiling speaker strobes to be added to (e) facu relocate 2 smoke detectores | $11,000 |
| May 22, 2019 | Completed final sign-off Aug 2019 | 785 Market St | Pribuss Engineering Inc | ref pa 201904057205; 10th fl: fire sprinkler t.i. add 41 headsDetails
ref pa 201904057205; 10th fl: fire sprinkler t.i. add 41 heads | $21,074 |
| May 17, 2019 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | revision to pa #201903054427. 13th fl: demo (e) light fixtures, reconfigure lighting layout & repair (e) suspended clgs as reuired. remove 1 interior door.Details
revision to pa #201903054427. 13th fl: demo (e) light fixtures, reconfigure lighting layout & repair (e) suspended clgs as reuired. remove 1 interior door. | $29,947 |
| Apr 10, 2019 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 8/f: suite 800 - demo of non-load bearing partitinos, construction of new partitions, doors, frames, hardware; relocation of sink and addition of new finishes. maher n/a.Details
8/f: suite 800 - demo of non-load bearing partitinos, construction of new partitions, doors, frames, hardware; relocation of sink and addition of new finishes. maher n/a. | $210,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | suite 950: tenant improvement: demo of non load bearning partitions construction of new partition, doors, relocation of sink and new finishes. maher n/a.Details
suite 950: tenant improvement: demo of non load bearning partitions construction of new partition, doors, relocation of sink and new finishes. maher n/a. | $127,000 |
| Apr 5, 2019 | Completed final sign-off Jul 2020 | 785 Market St | C & N Construction | #1000: tenant improvement: demo of non load bearning walls construction of new partition, doors, relocation of sink and new finishesDetails
#1000: tenant improvement: demo of non load bearning walls construction of new partition, doors, relocation of sink and new finishes | $185,000 |
| Apr 4, 2019 | Completed final sign-off Feb 2020 | 785 Market St | Pyro-Comm Systems, Inc. | 13th fl - fire alarm ti (1) new ciling speaker strobe -added to existing facu. relocate 1 existing wall strobe. ref pa 2019-0305-4427Details
13th fl - fire alarm ti (1) new ciling speaker strobe -added to existing facu. relocate 1 existing wall strobe. ref pa 2019-0305-4427 | $1,500 |
| Mar 12, 2019 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 13th flr. demo of e non structural interior partitionsDetails
13th flr. demo of e non structural interior partitions | $3,000 |
| Mar 5, 2019 | Expired or cancelled cancelled Jan 2026 | 785 Market St | C & N Construction | 15 th flr. demo and replace interior partitions, doors, partial ceiling demoDetails
15 th flr. demo and replace interior partitions, doors, partial ceiling demo | $3,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2020 | 785 Market St | C & N Construction | 13th flr only t.i. add 1 new partition (e) stair and elevator lobby to remain as is patch & repair (e) finishesDetails
13th flr only t.i. add 1 new partition (e) stair and elevator lobby to remain as is patch & repair (e) finishes | $3,500 |
| Jul 18, 2018 | Completed final sign-off Jan 2020 | 785 Market St | Pyro-Comm Systems, Inc. | fire alarm - 2 rrps, 2 smoke detectors, and 13 audio/visual devices to be hooked up to existing fa panelDetails
fire alarm - 2 rrps, 2 smoke detectors, and 13 audio/visual devices to be hooked up to existing fa panel | $10,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 785 Market St | street spaceDetails
street space | ||
| Oct 3, 2017 | Never finaled issued Dec 2017, no final | 785 Market St | one for one fire alarm replacemernt project. provide new fire alarm system per pre-application meeting minutes dated 12/21/2016Details
one for one fire alarm replacemernt project. provide new fire alarm system per pre-application meeting minutes dated 12/21/2016 | $75,000 | |
| May 2, 2017 | Never finaled issued May 2017, no final | 785 Market St | to obtain a final inspection for work approved under pa#200802114536 & pa#200408131585. all work is complete.Details
to obtain a final inspection for work approved under pa#200802114536 & pa#200408131585. all work is complete. | ||
| May 2, 2017 | Never finaled issued May 2017, no final | 785 Market St | to obtain a final inspection for work approved under pa#201010253649, 201006154543 & pa#201004271161. all work is complete.Details
to obtain a final inspection for work approved under pa#201010253649, 201006154543 & pa#201004271161. all work is complete. | ||
| Jan 18, 2017 | Completed final sign-off Jan 2017 | 785 Market St | C & N Construction | renew for final only. to obtain final inspection for work approved under pa # 201304295676. all work is completeDetails
renew for final only. to obtain final inspection for work approved under pa # 201304295676. all work is complete | |
| Aug 15, 2016 | Never finaled issued Aug 2016, no final | 785 Market St | C & N Construction | to obtain final inspection for work approved under pa#2011-02-10-0042 and 2011-02-10-0042. all work is complete.Details
to obtain final inspection for work approved under pa#2011-02-10-0042 and 2011-02-10-0042. all work is complete. | |
| Jan 30, 2014 | Never finaled issued Jan 2014, no final | 785 Market St | street spaceDetails
street space | ||
| Jun 6, 2013 | Completed final sign-off Jun 2013 | 785 Market St | C & N Construction | revise pa 2013.03.21.2761 - to correct statement on coversheet to read building not fully sprinklered. no new work.Details
revise pa 2013.03.21.2761 - to correct statement on coversheet to read building not fully sprinklered. no new work. | |
| May 28, 2013 | Completed final sign-off Jun 2013 | 785 Market St | C & N Construction | 4th floor-upgrade existing ventilation for office improvement. duct workDetails
4th floor-upgrade existing ventilation for office improvement. duct work | $4,000 |
| Apr 29, 2013 | Completed final sign-off Jan 2017 | 785 Market St | C & N Construction | removal of (e) ceiling height partitions doors and hardware. new interior non structural ceiling hght partions, new and relocated cieling grids, tiles and lighting, relocated doors and hardware, new finishes, etc. replacement of (e) cabinetry and plmg & office coffee room.Details
removal of (e) ceiling height partitions doors and hardware. new interior non structural ceiling hght partions, new and relocated cieling grids, tiles and lighting, relocated doors and hardware, new finishes, etc. replacement of (e) cabinetry and plmg & office coffee room. | $173,390 |
| Mar 21, 2013 | Completed final sign-off Jun 2013 | 785 Market St | C & N Construction | 4th floor-inter ti-conversion of multi-tenant floor to single tenant. removal of rated corridor & associated rated doors. new interior non structural paritions, new m.e.p distrib., new & relocated lighting, relocated doors & hardware. new finishes. accessible plumbing upgrades as part of disable accDetails
4th floor-inter ti-conversion of multi-tenant floor to single tenant. removal of rated corridor & associated rated doors. new interior non structural paritions, new m.e.p distrib., new & relocated lighting, relocated doors & hardware. new finishes. accessible plumbing upgrades as part of disable acc | $102,466 |
| Apr 11, 2012 | Completed final sign-off Jun 2012 | 785 Market St | K & L Construction | interior improvements on 2nd fl. reconfigure non structural partitions, new mep distribution, new and relocated lighting. new and relocated door to hardware. upgrade toilet room.Details
interior improvements on 2nd fl. reconfigure non structural partitions, new mep distribution, new and relocated lighting. new and relocated door to hardware. upgrade toilet room. | $120,309 |
| Sep 28, 2011 | Completed final sign-off Oct 2011 | 785 Market St | evacuation sign at ground floor lobbyDetails
evacuation sign at ground floor lobby | $300 | |
| Sep 8, 2011 | Expired or cancelled cancelled Feb 2013 | 785 Market St | Ad Art Inc. | erect 1 sign electric, wall, single faced.Details
erect 1 sign electric, wall, single faced. | $5,000 |
| Sep 8, 2011 | Expired or cancelled cancelled Feb 2013 | 785 Market St | Ad Art Inc. | installation of 2 replacement awnings 4'x8'-8"x4' drop.Details
installation of 2 replacement awnings 4'x8'-8"x4' drop. | $3,000 |
| Jul 29, 2011 | Completed final sign-off Jan 2013 | 785 Market St | Fisher Development Inc | revision to structural ditail. revision to app# 201008239318Details
revision to structural ditail. revision to app# 201008239318 | |
| Jul 22, 2011 | Expired or cancelled cancelled Jan 2026 | 785 Market St | Fisher Development Inc | revision to 201008239318 structural details forDetails
revision to 201008239318 structural details for | $5,000 |
| May 4, 2011 | Completed final sign-off Sep 2013 | 785 Market St | Fisher Development Inc | revision to pa# 2010-0823-9318 to add interior partition at storage vault on 1st floorDetails
revision to pa# 2010-0823-9318 to add interior partition at storage vault on 1st floor | $1,000 |
| Apr 4, 2011 | Completed final sign-off Jul 2011 | 785 Market St | Siemens Industry, Inc. | addition of 3 duct detectors, 3 pull stations, 9 speaker/strobes, 2 strobes, strobe booster power supply for mens warehouse tenant remodel on 1st fl. all new devices connect onto existing fire a;ar, systemDetails
addition of 3 duct detectors, 3 pull stations, 9 speaker/strobes, 2 strobes, strobe booster power supply for mens warehouse tenant remodel on 1st fl. all new devices connect onto existing fire a;ar, system | $9,400 |
| Mar 30, 2011 | Completed final sign-off Apr 2011 | 785 Market St | Pribuss Engineering Inc | lobby/1st floor. fire sprinkler ti 5 heads, add 21 headsDetails
lobby/1st floor. fire sprinkler ti 5 heads, add 21 heads | $13,370 |
| Feb 10, 2011 | Completed final sign-off Jan 2017 | 785 Market St | Siemens Industry, Inc. | addtion of a graphic annunciator(to replace extg) and 2 speaker/strobes for the security station relaction at the floor 1 lobby. all new devices connect onto the extg life safety system.Details
addtion of a graphic annunciator(to replace extg) and 2 speaker/strobes for the security station relaction at the floor 1 lobby. all new devices connect onto the extg life safety system. | $4,800 |
| Feb 7, 2011 | Never finaled issued Feb 2011, no final | 785 Market St | streeet spaceDetails
streeet space | ||
| Oct 25, 2010 | Never finaled issued Feb 2011, no final | 785 Market St | exterior facade improvements at the ground level at the north&south bays. replace (e) glazing & exterior pastry display counter w/ new storefront door sys. infill opening to recreate historic storefront window interior scope under separate permit.Details
exterior facade improvements at the ground level at the north&south bays. replace (e) glazing & exterior pastry display counter w/ new storefront door sys. infill opening to recreate historic storefront window interior scope under separate permit. | $25,000 | |
| Aug 23, 2010 | Never finaled issued Feb 2011, no final | 785 Market St | remodel of (e) historic lobby on grond floor.Details
remodel of (e) historic lobby on grond floor. | $30,000 | |
| Aug 23, 2010 | Completed final sign-off Jul 2012 | 785 Market St | Fisher Development Inc | ground floor tenant improvement for men's wearhouse. new interior finishes & m.e.p. fire alarm & sprinkler under seperate permit.Details
ground floor tenant improvement for men's wearhouse. new interior finishes & m.e.p. fire alarm & sprinkler under seperate permit. | $275,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 785 Market St | interior non structural demo of ground floor. all work to comply with sfbc ab-017Details
interior non structural demo of ground floor. all work to comply with sfbc ab-017 | $15,500 | |
| Apr 27, 2010 | Completed final sign-off Jun 2011 | 785 Market St | Ad Art Inc. | installation of 1-illuminated wall sign.Details
installation of 1-illuminated wall sign. | $6,000 |
| Apr 27, 2010 | Never finaled issued Jun 2010, no final | 785 Market St | Ad Art Inc. | installation of 2-awnings-4'x8'-8"x4' drop. 2-20" a5' banners.Details
installation of 2-awnings-4'x8'-8"x4' drop. 2-20" a5' banners. | $8,000 |
| Apr 27, 2010 | Completed final sign-off Jun 2011 | 785 Market St | Ad Art Inc. | painted copy to existing awning and banner signs.Details
painted copy to existing awning and banner signs. | $1,000 |
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 785 Market St | street space permitDetails
street space permit | ||
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 785 Market St | Sign Productions Inc.(Grant Sign Co) | painted or other non-structural sign. non-electric projecting.Details
painted or other non-structural sign. non-electric projecting. | |
| Dec 18, 2006 | Expired or cancelled expired Mar 2008 | 785 Market St | Starlite Electric Inc. | to renew pa#200408131585 for final inspectionDetails
to renew pa#200408131585 for final inspection | |
| Aug 13, 2004 | Never finaled issued Aug 2004, no final | 785 Market St | Starlite Electric Inc. | install 1 booster 1 speaker strobe 4 smoke detectors 1 monitor module 16 strobes 12 speakersDetails
install 1 booster 1 speaker strobe 4 smoke detectors 1 monitor module 16 strobes 12 speakers | $14,000 |
| Aug 12, 2004 | Expired or cancelled expired May 2007 | 785 Market St | Chow's Construction Co. | provide type"c" gypsum boardceiling at (e) vestibule. org gypsum board ceiling to remain in break rmDetails
provide type"c" gypsum boardceiling at (e) vestibule. org gypsum board ceiling to remain in break rm | $600 |
| Jun 9, 2004 | Expired or cancelled expired May 2007 | 785 Market St | Chow's Construction Co. | oti-1 13/f el lsDetails
oti-1 13/f el ls | $60,000 |
| Jan 18, 2000 | Expired or cancelled expired Mar 2004 | 785 Market St | fire alarm system upgrade 14th & 15th floor, new facp to monitor existing fire alarm and these flooDetails
fire alarm system upgrade 14th & 15th floor, new facp to monitor existing fire alarm and these floo | $48,991 |