Levi J Rippy
- License
- C41014
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Wsp Sf
- On San Francisco permits
- Oct 2024 to Aug 2026
15 permits since 2000 (architect on 15 permits): 14 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (6), Peacock Construction (5), Marchetti Group (2), Constructive Solutions Inc., Kr Johnston Construction Inc
- Engineers
- Erik Elmtoft (4), Joseph Fay, Matthew Longsine
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 15
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | Completed final sign-off Oct 2026 | 505 Howard St | Hathaway Dinwiddie Co. | deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411pDetails
deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411p | |
| Jul 28, 2026 | Completed final sign-off Nov 2026 | 1 Post St | Peacock Construction | revision to 202604280192. demo existing door to main corridor in existing suite 1025.Details
revision to 202604280192. demo existing door to main corridor in existing suite 1025. | $15,000 |
| Jun 9, 2026 | Completed final sign-off Oct 2026 | 505 Howard St | Hathaway Dinwiddie Co. | mech revisions for 8th floor ti permit # 202510207678.Details
mech revisions for 8th floor ti permit # 202510207678. | |
| May 27, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | level 20; revision to 202602266553 changing door fire rating from 90 min to 45 minDetails
level 20; revision to 202602266553 changing door fire rating from 90 min to 45 min | |
| May 27, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | revision to 202602266548 changing door fire rating from 90 min to 45 min.Details
revision to 202602266548 changing door fire rating from 90 min to 45 min. | |
| May 19, 2026 | In progress issued May 2026 | 351 California St | Constructive Solutions Inc. | ref 202604159509- 15/fl- ti to serve as a business suite for (n) business tenants to include (n) interior fit out including offices, conference rooms, restrooms, and pantry with seating.Details
ref 202604159509- 15/fl- ti to serve as a business suite for (n) business tenants to include (n) interior fit out including offices, conference rooms, restrooms, and pantry with seating. | $1,645,900 |
| Apr 23, 2026 | Completed final sign-off Oct 2026 | 505 Howard St | Hathaway Dinwiddie Co. | def. health dept submittal for bpa: 202510207678 - l8 catering pantry.Details
def. health dept submittal for bpa: 202510207678 - l8 catering pantry. | |
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 505 Howard St | Kr Johnston Construction Inc | 1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower roomsDetails
1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower rooms | $20,000 |
| Feb 26, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meetingDetails
project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meeting | $1,420,000 |
| Feb 26, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | project scope is to renovate the 20th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meetingDetails
project scope is to renovate the 20th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out. new interior construction to include new open work space, enclosed office, accessory meeting | $1,420,000 |
| Nov 17, 2025 | Completed final sign-off Oct 2026 | 505 Howard St | Hathaway Dinwiddie Co. | 7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.Details
7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,123,250 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 505 Howard St | Hathaway Dinwiddie Co. | selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678Details
selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678 | $275,000 |
| Oct 28, 2025 | Completed final sign-off Oct 2026 | 505 Howard St | Hathaway Dinwiddie Co. | 6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.Details
6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,163,600 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 71 Stevenson St | Marchetti Group | 10th fl - install pre-fabricated phone booth in existing officeDetails
10th fl - install pre-fabricated phone booth in existing office | $2,400 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | Marchetti Group | 10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes.Details
10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes. | $1,400,000 |